| 2016-09-12 15:23:37 | 2ND REVIEW: FBC 2014 |
| | |
| | GEORGE JOHNSON |
| | PLUMBING PLANS EXAMINER |
| | CITY OF WEST PALM BEACH |
| | 561-805-6711 |
| | [email protected] |
| | |
| | GAS COMMENTS: 2ND REQUEST |
| | |
| | 1. CLEARLY SHOW ALL CUT SECTIONS OF PIPE AND |
| | CORRESPONDING LENGTHS PER FBC-2014 FUEL GAS, SECS. |
| | 402.4.1, 402.4.2. |
| | |
| | 2. SHOW TYPE OF PIPING MATERIAL BEING INSTALLED ON |
| | RISER , ALL PIPE SIZES, AND THE EHD NUMBER OF |
| | CORRUGATED STAINLESS STEEL TUBING FOR EACH PIPE SIZE IF |
| | BEING USED. WPB AMENDMENTS TO FBC SEC. 107.2.1. |
| | |
| | 3. SHOW PIPE SIZE DOWN STEAM OF REGULATORS. WPB |
| | AMENDMENTS TO FBC SEC. 107.2.1. |
| | |
| | 4. SUBMIT CALCULATIONS FOR COMBUSTION AIR ON RANGE PER |
| | THE FBC-2014 FUEL GAS CODE SEC. 304. |
| | |
| | 5. SUBMIT MANUFACTURER?S SPECIFICATION SHEETS FOR ALL |
| | GAS EQUIPMENT TO VERIFY COMPLIANCE WITH STANDARDS NFPA |
| | 54, NFPA 58, AND FBC-2014 FUEL GAS SEC. 402.2 |
| | |
| | 6. PLEASE CLARIFY SYSTEM PRESSURE IT APPEARS TO BE A |
| | 2LB SYSTEM BEING REDUCED DOWN TO .5LB AT EACH APPLIANCE |
| | BY REGULATORS. THE TABLES YOU REFERENCE INDICATE .5LB |
| | PLEASE INDICATE ON THE RISER THE PRESSURE IN EACH |
| | SECTION OF THE SYSTEM. PER WPB AMEND TO FBC 107.2.1 |
| | |
| | 7. PROVIDE EMERGENCY SHUT OF VALVE ON GAS SUPPLY TO |
| | RANGE |
| | |
| | DO TO PLANS BEING INCOMPLETE OR UNCLEAR, A |
| | COMPREHENSIVE PLAN REVIEW CANNOT BE DONE AT THIS TIME, |
| | THERE MAYBE ADDITIONAL COMMENTS ON RESUBMITTAL OF |
| | PLANS. |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT |
| | CORRECTED PAGES INTO TO SUBMITTAL AND LEAVE THE |
| | PREVIOUSLY REVIEWED SHEETS. |
| | |