| Date |
Text |
| 2016-02-05 10:42:13 | 1ST ELECTRICAL REVIEW NOTES: |
| | REVIEWED FOR COMPLIANCE WITH: |
| | FBC 5TH EDITION 2014 |
| | NFPA 70 2011 (NEC) |
| | |
| | CORRECTIONS REQUIRED: |
| | 1. YOU SHALL PROVIDE AN ELECTRICAL RISER DIAGRAM |
| | INDICATING ALL THE PROPOSED POOL EQUIPMENT AND |
| | LIGHTING. THIS SHOULD ALSO INDICATE THE TYPE OF POOL |
| | LIGHTING PROPOSED IF ANY. |
| | 2. FROM THE SITE PLAN PROVIDED, ACTUAL MEASUREMENTS FOR |
| | THE LOCATION OF OVERHEAD SERVICE CONDUCTORS IN RELATION |
| | TO THE POOL WOULD NOT BE PRACTICAL. THE PLAN HAS A NOTE |
| | INDICATING THAT THE SERVICE DROP WILL BE REMOVED BY THE |
| | OWNER. VERIFY OVERHEAD CONDUCTOR CLEARANCES AS |
| | INDICATED IN NEC 680.8 IF IT IS TO REMAIN AND REVISE |
| | THE DRAWING TO REMOVE SUCH NOTE. |
| | 3. WHEN DIGGING THE HOLE FOR THE POOL SHELL, ASCERTAIN |
| | COMPLIANCE WITH NEC 680.10 WHICH PROHIBITS ANY |
| | UNDERGROUND WIRING WITHIN 5? HORIZONTALLY OF THE POOL |
| | SHELL UNLESS THE WIRING IS DIRECTLY RELATED TO THE |
| | POOL. |
| | 4. ALL POOL BONDING AS REQUIRED BY NEC 680.26 SHALL BE |
| | INDICATED ON DRAWINGS. |
| | 5. IN ADDITION TO THE ABOVE, COMPLIANCE WITH FBC-R |
| | CHAPTER 42. |
| | |
| | WHEN RESUBMITTING, FOR A QUICKER RETURN ON YOUR |
| | RE-SUBMITTAL, PLEASE PROVIDE A RESPONSE LETTER |
| | (NARRATIVE) ADDRESSING EACH ITEM AND THE PAGE NUMBER |
| | WHERE THE CORRECTIONS APPEAR ALONG WITH THE STANDARD |
| | CITY RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT |
| | CORRECTED PAGES INTO THE SUBMITTAL PACKAGE. MARK VOID |
| | AND LEAVE THE PREVIOUSLY REVIEWED SHEETS FOR |
| | COMPARATIVE REVIEW. CLOUDING THE CHANGES WILL BE |
| | GREATLY APPRECIATED. |
| | |
| | IF YOU HAVE FURTHER QUESTIONS, PLEASE DON?T HESITATE TO |
| | CONTACT ME DIRECTLY. |
| | |
| | THANK YOU, |
| | MIKE ALBARRAN |
| | ELECTRICAL PLANS EXAMINER |
| | PH: 561-805-6746 |
| | EMAIL: [email protected] |
| | |