| 2016-03-23 13:59:27 | 1) THE TANKLESS WATER HEATER WAS SHOWN AS ELECTRIC ON |
| | THE PLANS FOR PERMIT # 11090836 FOR THIS SPACE.THE |
| | WATER HEATER WAS ALSO SHOWN ON THE OPPOSITE SIDE OF THE |
| | SPACE THAN WHERE IT IS NOW. CITY RECORDS DO NOT SHOW |
| | ANY ADDITIONAL PERMITS FOR THE RELOCATION OF THE |
| | TANKLESS WATER HEATER NOR FOR THE INSTALLATION OF THE |
| | GAS. THEREFORE, THE GAS TANKLESS WATER HEATER SHALL NOT |
| | BE NOTED AS EXISTING ON THE PLANS, IT SHALL BE SHOWN AS |
| | NEW SINCE IT WAS NEVER PERMITTED AND SHALL BE INCLUDED |
| | IN THIS SCOPE OF WORK. FBC 105.1.SEE COPIES OF FLOOR |
| | PLAN IN FOLDER. THE SUBMITTED PICTURE SHOWS A FAIRLY |
| | NEW TANKLESS WATER HEATER. |
| | 2) SINCE THIS IS A CHANGE OF OCCUPANCY AND COMBINATION |
| | OF SPACE, THE PLANS WILL BE REQUIRED TO BE REVIEWED BY |
| | THE DEPT. OF BUSINESS AND PROFESSIONAL REGULATION, |
| | DIVISION OF HOTELS AND RESTAURANTS. SECOND REQUEST. |
| | 3) SHT. LS-1 SHOWS THE OCCUPANT LOAD AS 150 PERSONS ON |
| | THE PLUMBING FIXTURE CALCULATION TABLE AND ALSO ON THE |
| | PLAN. I DO NOT SEE WHERE THE SEATS AND BENCH LOCATED ON |
| | THE EXTERIOR OF THE BUILDING ON THE SOUTH END OF THE |
| | STRUCTURE HAVE BEEN INCLUDED IN THE OCCUPANT LOAD. |
| | CLARIFY.SUBMIT A TOTAL OCCUPANT LOAD. |
| | 4) THE NEW FLOOR SINKS ARE STILL NOT VENTED IN |
| | ACCCORDANCE WITH2014 FBC, PLUMBING SEC.901.2.1. |
| | 5) SEE THE FOLLOWING REQUIREMENTS FOR A PROPER GAS |
| | REVIEW FOR THE GAS TANKLESS WATER HEATER. |
| | |
| | A).SUBMIT AN ISOMETRIC DRAWING THAT CLEARLY SHOWS THE |
| | LENGTH OF ALL CUT SECTIONS OF PIPE PER 2014 FBC-FUEL |
| | GAS, SECS. 402.4.1, 402.4.2. OR 2014 FBC-RES SEC. |
| | G2413. |
| | B.)SHOW THE TYPE OF PIPE MATERIAL BEING INSTALLED, ALL |
| | PIPE SIZES, AND THE CORRESPONDING EHD NUMBER OF THE |
| | CORRUGATED STAINLESS STEEL TUBING FOR EACH PIPE SIZE. |
| | WPB AMENDMENTS TO FBC SEC.107.2.1. |
| | C)TYPE OF GAS (LP OR NATURAL). |
| | D) BTU LOAD OF EACH APPLIANCE AND THE TOTAL BTU LOAD ON |
| | THE SYSTEM. REFER TO THE 2014 FBC-FUEL GAS SECS.401.8 |
| | THRU 402.6.1 AND TABLES 402.4 (1) THRU 402.4 (37) OR |
| | 2014 FBC-RES. SEC. G2413. |
| | E)SHOW THE DISTANCE FROM THE POINT OF DELIVERY, (METER |
| | OR MP REGULATOR) TO THE MOST REMOTE OUTLET IN THE |
| | BUILDING AND / OR SYSTEM PER THE 2014 FBC-FUEL GAS |
| | SEC.402.4.1 OR 2014 FBC-RES. SEC. G 2413.3. |
| | F)SUBMIT CALCULATIONS FOR COMBUSTION AIR PER THE 2014 |
| | FBC-FUEL GAS CODE SEC.304.1 OR 2014 FBC-RES. SEC. G |
| | 2407. |
| | G)INDICATE THE DELIVERY PRESSURE (PSI) OF THE SYSTEM ON |
| | THE PLAN PER 2014 FBC-FUEL GAS SEC.402.2 OR FBC RES. |
| | SEC. G2413.2. . |
| | H)SUBMIT A DETAIL SHOWING THE TYPE, LOCATION, SIZE AND |
| | TERMINATION OF THE GAS VENTS PER 2014 FBC-FUEL GAS |
| | SECS. 502 THRU 505 OR 2014 FBC-RES. SEC.G2426. |
| | I)SUBMIT MANUFACTURER'S SPECIFICATION SHEETS / |
| | INSTALLATION MANUAL FOR ALL GAS EQUIPMENT TO VERIFY |
| | COMPLIANCE WITH STANDARDS NFPA 54, NFPA 58, AND |
| | FBC-2014 FUEL GAS CODE SEC. 402.2, AND 301.3 OR 2014 |
| | FBC-RES. SEC. G2404.3. GAS APPLIANCES SHALL BE LISTED |
| | AND LABELED. |
| | 6) SHT. P-1 - FLOW RATE CALCULATIONS - UNDER THE |
| | MULTIPLE FIXTURE DESIGN- EXPLAIN WHY ONLY 50% OF THE 2 |
| | COMPARTMENT SINK IS BEING ADDED TO THE FLOW RATE |
| | INSTEAD OF THE CALCULATED FLOW RATE OF 22.85 GPM. |
| | 7) SUBMIT A MANUFACTURER'S INSTALLATION MANUAL FOR THE |
| | GREASE INTERCEPTOR.WHERE IS THE VENTED INLET FLOW |
| | CONTROL DEVICE ON THE GREASE INTERCEPTOR? |
| | 8) SHT. A-1 SHOWS THE GREASE INTERCEPTOR LOCATED IN THE |
| | WALK IN COOLER. THE SIZE, TYPE AND LOCATION OF EACH |
| | INTERCEPTOR SHALL BE APPROVED BY THE PLUMBING OFFICIAL |
| | PER 2014 FPC SEC.1003.2.PLEASE EXPLAIN HOW THIS |
| | LOCATION MAKES THE INTERCEPTOE ACCESSIBLE FOR |
| | MAINTENANCE AND REPAIR. |
| | (9 THE FOLLOWING TEXT IS FROM THE CWPB CODE OF |
| | ORDINANCES SEC.90-125 (7) |
| | INTERCEPTORS ARE TO BE INSTALLED OUTSIDE OF THE FOOD |
| | PREPARATION AREA WITH THE DISHWASHER DISCHARGING VIA A |
| | SEPARATE LINE. |
| | EACH INTERCEPTOR SHALL BE SO INSTALLED AS TO PROVIDE |
| | READY ACCESSIBILITY TO THE COVER, AND MEANS FOR |
| | SERVICING AND MAINTAINING THE INTERCEPTOR IN WORKING |
| | AND OPERATING CONDITION. |
| | |
| | PLUMBING PLAN REVIEW |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | 561-805-6692 |
| | [email protected] |
| | |
| | |
| | |
| | |