| 2016-11-29 14:36:25 | RESIDENTIAL (R3) ALTERATION FIFTH BUILDING REVIEW |
| | CHECKLIST. |
| | CODE: FBC-5TH EDITION (2014). |
| | |
| | NOTE: |
| | BUILDING REVIEW MAY BE APPROVED WITH PROVISO. PROVISO |
| | MEANS THAT CONTRACTOR WILL SUBMIT REQUIRED INFORMATION |
| | PRIOR TO INSPECTIONS TO AVOID DELAYS/CONFLICTS. |
| | REVISION FEES WILL APPLY EACH TIME INFORMATION IS |
| | RESUBMITTED. CONTRACTOR TO ADVICE IF PROVISO OPTION IS |
| | PREFERRED AT THIS TIME OR IF RESUBMITTING REQUIRED |
| | INFORMATION PRIOR TO ISSUING PERMIT. |
| | |
| | |
| | NEW COMMENT BASED ON THE ENERGY CALCULATIONS SUBMITTED: |
| | 1- DESIGNER OF RECORD TO PROVIDE COMPLETE DETAILS AND |
| | SPECIFICATIONS SHOWING COMPLIANCE WITH THE INTERIOR AND |
| | EXTERIOR INSULATION REQUIREMENTS AS REQUIRED BY ENERGY |
| | CALCULATIONS SUBMITTED. SEC. R103.2 FBC-ENERGY |
| | CONSERVATION, 5TH EDITION (2014). |
| | |
| | 2- ENERGY CALCULATIONS SUBMITTED: |
| | |
| | NOTE: KEEP IN MIND THAT ENERGY CALCULATION SUBMITTED |
| | ARE DONE FOR THE ENTIRE HOUSE. ALL OF THE COMMENTS |
| | BELOW APPLY TO THE ENTIRE HOUSE. |
| | |
| | |
| | A) REVISE INFORMATION ON TABLE R402A SUBMITTED: |
| | (1) MASONRY WALLS REQUIRE "INSULATION ON WALL INTERIOR" |
| | OF R-4 AND "INSULATION ON WALL EXTERIOR" OF R-3. THE |
| | "INSTALLED VALUES" COLUMN WAS NOT COMPLETED. NEED TO |
| | COMPLETE THE "INSTALLED VALUES" COLUMN. (NOTE: SEE NOTE |
| | #4 AT THE BOTTOM OF THIS TABLE). SEC. R101.5.1.1.1 |
| | FBC-ENERGY CONSERVATION, 5TH EDITION (2014). |
| | REPEAT COMMENT. NOT ADDRESSED. |
| | |
| | (2) THE CEILING INFORMATION WAS NOT COMPLETED ON THE |
| | "INSTALLED VALUES" COLUMN. NEED TO COMPLETE THE |
| | "INSTALLED VALUES" COLUMN. SEC. R101.5.1.1.1 FBC-ENERGY |
| | CONSERVATION, 5TH EDITION (2014). |
| | |
| | (3) THE AIR HANDLER UNIT IS NOT ALLOWED IN THE ATTIC. |
| | REVISE THE "INSTALLED VALUES" COLUMN AS REQUIRED. SEC. |
| | R101.5.1.1.1 FBC-ENERGY CONSERVATION, 5TH EDITION |
| | (2014). |
| | |
| | (4) THE ELECTRIC WATER HEATER EF VALUE SHOWN ON THE |
| | "INSTALLED VALUES" COLUMN DOESN'T COMPLY WITH THE |
| | PRESCRIPTIVE REQUIREMENTS. REVISE AS REQUIRED. SEC. |
| | R101.5.1.1.1 FBC-ENERGY CONSERVATION, 5TH EDITION |
| | (2014). |
| | |
| | |
| | B) REVISE INFORMATION ON TABLE R402B SUBMITTED; |
| | (1) THE WATER HEATER COMPONENT WAS NOT CHECKED. SEC. |
| | R101.5.1.1.1 FBC-ENERGY CONSERVATION, 5TH EDITION |
| | (2014). |
| | |
| | |
| | C) THE HEATING INFORMATION SHOWN ON THE ENERGY |
| | CALCULATIONS ITEM #13A AND #13B DOESN'T MATCH TABLE |
| | R402A AND EQUIPMENT INFORMATION SHOWN ON THE MECHANICAL |
| | PLAN. REVISE AS REQUIRED TO MATCH. SEC. R101.5.1.1.1 |
| | FBC-ENERGY CONSERVATION, 5TH EDITION (2014). |
| | |
| | D) PERSON DOING THE ENERGY CALCULATIONS NEED TO |
| | COORDINATE INFORMATION SHOWN ON THE FRONT PAGE OF THE |
| | ENERGY CALCULATIONS WIT INFORMATION SHOWN ON TABLE |
| | R402A. SEC. R101.5.1.1.1 FBC-ENERGY CONSERVATION, 5TH |
| | EDITION (2014). |
| | |
| | |
| | NOTE: IF UNABLE TO COMPLY WITH THE ABOVE REQUIREMENTS |
| | USING THE PRESCRIPTIVE FORM R402-2014 SUBMITTED, THEN |
| | PERFORMANCE METHOD FORM R405-2014 MAY BE USED INSTEAD. |
| | |
| | |
| | IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT |
| | JULIO GOMEZ |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | DEVELOPMENT SERVICES DEPARTMENT |
| | (561)805-6712 |