| Plan Review Notes For Permit 16010117 |
| Permit Number |
16010117 |
|
| Review Stop |
P |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2016-03-27 08:32:01 | 1) SUBMIT A STORMWATER RISER FOR THE PRIMARY ROOF | | | DRAINAGE AND FOR THE OVERFLOW DRAINS.THE SIZING OF THE | | | HORIZONTAL DRAINS SHALL COMPLY WITH 2014 FBC-PLUMBING | | | TABLE 1106.3. THE DESIGN SHALL BE BASED ON A 5 INCH | | | RAINFALL RATE PER HOUR.SHOW THE SQUARE FOOTAGE DRAINED | | | BY EACH DRAIN. 2ND REQUEST.FBC 107.3.5. THIS HAS NOT | | | BEEN SUBMITTED NOR HAS A STORM DRAIN RISER BEEN | | | SUBMITTED AS PREVIOUSLY REQUESTED. INDICATE THE SLOPE | | | OF THE HORIZONTAL STORM DRAIN. | | | 2) RAINWATER LEADERS SHALL DISCHARGE A MINIMUM OF ONE | | | FOOT FROM THE BUILDING EXTERIOR WALL. 2014 FBC SEC. | | | 1503.7. | | | 3) CLEANOUTS ARE REQUIRED IN THE STORM DRAINAGE SYSTEM | | | PER 2014 FBC-PLUMBING SEC. 1101.8. | | | 4) SHOW THE TERMINATION / DISCHARGE POINTS OF THE | | | PRIMARY AND OVERFLOW ROOF DRAINS. WPB AMEND. TO FBC | | | SEC. 107.2.1. | | | 5) INDICATE ON THE PLANS HOW THE NEW LANDSCAPED AREAS | | | WILL BE IRRIGATED. PLEASE NOTE THIS ON THE PLANS AS | | | YOUR RESPONSE TO THE COMMENTS USUALLY DOES NOT MAKE IT | | | TO THE FIELD, WPB AMEND. TO FBC SEC. 107.2.1. | | | | | | PLUMBING PLAN REVIEW | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | 561-805-6692 | | | [email protected] | | | | | | |
|