2016-01-30 06:38:521) SUBMIT TWO COPIES OF THE TANK DETAIL SHOWING THE
 INTERIOR (SECTION DETAIL) OF THE TANK. THE TANK SHALL
 COMPLY WITH F.A.C. RULE 64-6.013 (7). SEE BELOW:
 (7) GREASE INTERCEPTORS ARE NOT REQUIRED FOR A
 RESIDENCE. HOWEVER, ONE OR MORE GREASE INTERCEPTORS ARE
 REQUIRED WHERE GREASE WASTE IS PRODUCED IN QUANTITIES
 THAT COULD OTHERWISE CAUSE LINE STOPPAGE OR HINDER
 SEWAGE DISPOSAL. THE DESIGN OF GREASE INTERCEPTORS
 SHALL BE BASED ON STANDARDS FOUND IN PARAGRAPH (A)
 BELOW. IN ADDITION, THE FOLLOWING GENERAL REQUIREMENTS
 FOUND IN PARAGRAPHS (B), (C), AND (D), APPLY WHEN
 DETERMINING THE PROPER USE AND INSTALLATION OF A GREASE
 INTERCEPTOR USED AS A COMPONENT OF AN ONSITE SEWAGE
 TREATMENT AND DISPOSAL SYSTEM.
 (A) THE INLET INVERT SHALL DISCHARGE A MINIMUM 2 1/2
 INCHES ABOVE THE LIQUID LEVEL LINE AND THE OUTLET PIPE
 SHALL HAVE A TEE WITH A MINIMUM DIAMETER OF 4 INCHES
 THAT EXTENDS TO WITHIN 8 INCHES OF THE BOTTOM OF THE
 TANK.
 (D) SIZING OF GREASE INTERCEPTORS SHALL BE BASED ON THE
 EQUATIONS BELOW. THE MINIMUM VOLUME OF ANY GREASE
 INTERCEPTOR SHALL BE 750 GALLONS AND THE MAXIMUM VOLUME
 OF AN INDIVIDUAL SINGLE GREASE INTERCEPTOR CHAMBER
 SHALL BE 1250 GALLONS. WHEN THE REQUIRED EFFECTIVE
 CAPACITY OF THE GREASE INTERCEPTOR IS GREATER THAN 1250
 GALLONS, INSTALLATION OF MULTI-CHAMBERED GREASE
 INTERCEPTORS OR GREASE INTERCEPTORS IN SERIES IS
 REQUIRED.
 2)SUBMIT A DETAIL OF THE REQUIRED SAMPLING POINT. AS
 DESCRIBED IN THE NOTES ON THE PLANS, THE SAMPLING POINT
 DOES NOT MEET THE INTENT OF THE CITY'S REQUIREMENT.WPB
 AMEND. TO FBC SEC. 107.2.1.
 3)THE PLANS CALL FOR 1250 GALLON TANKS BUT A DETAIL HAS
 BEEN SUBMITTED FOR 1350 GALLON TANKS. TANKS EXCEEDING
 1250 SHALL BE MULT-CHAMBERED. SUBMIT DETAILS FROM THE
 MANUFACTURER SHOWING THE INTERIOR OF THE TANK AND THE
 CHAMBERS AND COMPLIANCE WITH F.A.C. 64E-6.013 (7) (A) &
 (D).
 4) FIBERGLASS & POLYETHYLENE TANKS SHALL COMPLY WITH
 F.A.C. RULE 64E-6.013 (6) (B)(C).A TEST REPORT FROM AN
 INDEPENDENT TESTING LABORATORY IS REQUIRED TO
 SUBSTANTIATE THAT INDIVIDUAL RECEPTACLE DESIGNS AND
 MATERIAL FORMULATIONS MEET THESE REQUIREMENTS. THIS
 INFORMATION/REPORT SHOULD BE OBTAINABLE FROM THE
 MANUFACTURER.
  
 PLUMBING PLAN REVIEW
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 561-805-6692
 [email protected]
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved