| 2016-04-06 14:07:12 | 2ND REVIEW: FBC 2014 MECHANICAL |
| | PERMIT #15120896 |
| | BUILDING-3, TYPE-I |
| | 4/6/16 |
| | |
| | 1) THE WINDOW GLASS SQUARE FOOTAGE CALCULATIONS ON THE |
| | HEAT LOAD CALCULATIONS SHOW A MUCH LARGER AMOUNT OF |
| | GLASS COMPARED TO THE GLASS AREA CALCULATIONS ON THE |
| | UNIT FLOOR PLANS SHOWN ON SHEETS M4.01, M4.02, AND |
| | M4.03. PLEASE CLARIFY WHY NO VENTILATION AIR IS SHOWN |
| | ON THE CALCULATIONS, AND WHY NO LATENT LOADS HAVE BEEN |
| | CALCULATED FOR INFILTRATION, LIGHTING, AND EQUIPMENT? |
| | 2) THE ENERGY CALCULATIONS REQUESTED IN THE FIRST |
| | REVIEW WERE NOT SUBMITTED WITH THE REVISED PLANS: |
| | PLEASE COMPLY. |
| | 3) THE GARAGE VENTILATION CALCULATIONS ON SHEET M5.01 |
| | INDICATE "NATURAL VENTILATION", HOWEVER THE 100 CFM PER |
| | CAR IS A MECHANICAL VENTILATION REQUIREMENT INDICATED |
| | INTABLE 403.3. PLEASE NOTE THAT NATURAL VENTILATION IS |
| | FOR OCCUPIED SPACES AS INDICATED IN SECTION 401.2, |
| | HOWEVER PER SECTION 202 DEFINITIONS, A GARAGE IS NOT |
| | CONSIDERED OCCUPIABLE SPACE. PROVIDE MECHANICAL |
| | VENTILATION PER TABLE 403.3. |
| | 4) THE EMAILED RESPONSE NARRATIVE RECEIVED FROM STOFFER |
| | AND ASSOCIATES INC. IS REFERENCING SHEET A304 IN |
| | RESPONSE TO 1ST REVIEW COMMENT #3, HOWEVER THAT SHEET |
| | IS NOT INCLUDED IN THE UPLOADED PLAN SETS, NOR IS IT |
| | SHOWN IN THE INDEX ON SHEET A0.01. |
| | 5) M5.01: THE TRASH ROOM EXHAUST IS NOT CONSIDERED |
| | ENVIRONMENTAL AIR AND THEREFORE THE OUTLET SHALL BE 10' |
| | FROM OPERABLE OPENINGS INTO THE BUILDING, AND 10' ABOVE |
| | THE ADJOINING GRADE. PLEASE REVISE THE NOTE ON THE |
| | PLAN. |
| | 6) COMMENT #13 FROM THE 1ST REVIEW REQUESTING SITE |
| | SPECIFIC WIND LOAD ENGINEERING FOR THE ROOF TOP STANDS |
| | AND CONDENSERS STILL EXISTS: PLEASE COMPLY. |
| | 7) PLEASE SHOW THE DRYER RUN LENGTHS ON THE PLANS AND |
| | NUMBER OF ELBOWS TO BE USED TO VERIFY COMPLIANCE WITH |
| | THE DRYER SPECS ON SHEET M5.02. |
| | 8) AS NOTED IN THE HEADING ABOVE, I BELIEVE THE |
| | PROPOSED PROJECT IS FOR "BUILDING-3" WHICH IS A |
| | "TYPE-1", HOWEVER THE TITLES ON THE PLANS AND |
| | SUPPORTING DOCUMENTS ARE ANYTHING BUT CONSISTENT IN |
| | IDENTIFYING WHICH BUILDING YOU ARE SEEKING TO PERMIT. |
| | PLEASE REVIEW AND REVISE THE TITLES ACCORDINGLY. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 561-805-6719 |
| | [email protected] |
| | |