| Plan Review Notes For Permit 15120740 |
| Permit Number |
15120740 |
|
| Review Stop |
P |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2016-02-29 06:06:18 | 1) THE PLANS INDICATE THAT THE EXISTING GAS WATER | | | HEATER IS BEING RELOCATED. SUBMIT A GAS AND WATER | | | PIPING RISER DIAGRAM FOR THE CHANGES TO THE GAS AND | | | WATER SYSTEMS. WPB AMEND. TO FBC SEC. 107.3.5.1.3. 2ND | | | REQUEST. | | | 2) THE GATE VALVE SHALL BE LOCATED ON THE DISCHARGE | | | SIDE OF THE CHECK VALVE. 2014 FBC-PLUMBING SEC. | | | 712.2.2ND REQUEST. | | | 3) THE GATE AND CHECK VALVES SHALL BE | | | ACCESSIBLE.INDICATE ON THE PLANS HOW THIS WILL BE | | | ACCOMPLISHED.2014 FBC-PLUMBING SEC.712.2.2ND REQUEST. | | | 4) WHERE THE DISCHARGE LINE FROM THE SUMP CONNECTS INTO | | | HORIZONTAL DRAINAGE PIPING, THE CONNECTION SHALL BE | | | MADE THROUGH A WYE FITTING INTO THE TOP OF THE DRAINAGE | | | PIPING AND SUCH WYE FITTING SHALL BE LOCATED NOT LESS | | | THAN 10 PIPE DIAMETERS FROM THE BASE OF ANY SOIL STACK, | | | WASTE STACK OR FIXTURE DRAIN PER FPC SEC.712.3.5. | | | 5) ONLY ONE SET OF SIGNED AND SEALED DRAWINGS HAVE BEEN | | | SUBMITTED. SUBMIT TWO SETS ( SHEETS 1 & 2) OF SIGNED & | | | SEALED DRAWINGS PER 2014 FBC SEC. 107.1.TWO SETS OF THE | | | LARGE PLAN HAS BEEN SUBMITTED BUT THEY ARE COPIES AND | | | THE SIGNATURE AND SEAL ARE COPIES. COMPLY WITH F.A.C. | | | 61G15-23.001. | | | 6) THE DRAIN FROM THE SUMP ON THE SUBMITTED SITE PLAN | | | IS SHOWN AS 3 INCH AND ON THE DRAWING FROM A. GARGIULO | | | IT IS SHOWN AS 2 INCH. CLARIFY. | | | | | | PLUMBING PLAN REVIEW | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | 561-805-6692 | | | [email protected] | | | | | | | | | |
|