| 2015-12-30 14:32:43 | 1ST REVIEW: FBC 2014 MECHANICAL |
| | PERMIT #15120536 |
| | 12/30/15 |
| | |
| | 1) THE ENERGY CALCULATION FORM 506-2014 MUST BE |
| | CERTIFIED WITH SIGNATURES OF THE LICENSED DESIGN |
| | PROFESSIONALS OF THE PROPOSED PROJECT- SECTION C103.1.1 |
| | FBC-14 ENERGY CONSERVATION. |
| | 2) THE ASHRAE 90.1 MANDATORY COMPLIANCE CHECKLIST MUST |
| | BE COMPLETED AND ATTACHED TO FORM 506-2014. |
| | 3) ENERGY COMPLIANCE DATA FOR THE FOLLOWING SYSTEMS |
| | SHOWN ON THE PLANS WAS NOT LISTED IN FORM 506-2014: |
| | RTU'S 6, 7, 8, 9, & 10; AHU'S 6, 7, 8, 9, & 10; AND |
| | MINI-SPLIT SYSTEMS MS- 1, 2, 4, & 5. |
| | 4) RTU-3 IS LISTED AS 13 SEER IN THE AC SCHEDULE BUT |
| | LISTED AS 12 EER IN FORM 506-2014- PLEASE SEE TABLE |
| | C403.2.3(1) FBC-14 ENERGY CONSERVATION. |
| | 5) THE AC LOAD CALCS INDICATE 4575 CFM'S OF OUTSIDE |
| | VENTILATION AIR FOR AHU- 1&2, HOWEVER THOSE SYSTEMS ARE |
| | NOT INCLUDED IN THE OUTDOOR AIR CALCULATIONS AND |
| | SCHEDULE ON SHEET M0.2, AND THERE IS NO O/A DUCT SHOWN |
| | ON THE PLANS FOR THOSE UNITS. |
| | 6) THE AC LOAD CALCS INDICATE 522 CFM'S OF OUTSIDE |
| | VENTILATION AIR FOR AHU-11, HOWEVER THE SYSTEM IS NOT |
| | INCLUDED IN THE O/A CALCS OR SCHEDULE ON M0.2, AND |
| | THERE IS NO O/A DUCT SHOWN ON THE PLAN FOR THE SYSTEM. |
| | 7) PLEASE REMOVE RTU-5 FROM THE O/A SCHEDULE: IT IS NOT |
| | IN THE EQUIPMENT SCHEDULE OR THE CALCS. |
| | 8) HOW IS O/A BEING PROVIDED TO AHU'S 3, 4, 5, & 9. THE |
| | PLAN DOES NOT INDICATE A MEANS OF SUPPLY. |
| | 9) M0.2: THE O/A CALCULATION FOR THE PORSCHE SHOWROOM |
| | (RTU-1) IS INCORRECT. THE MINIMAL O/A REQUIRED IS 822 |
| | CFM'S. PLEASE REVIEW THE AC LOAD CALCS FOR THE SYSTEM. |
| | 10) M1.0: PLEASE REVIEW SECTION 3006.2 FBC-14 BUILDING |
| | (VENTING FOR ELEVATOR MACHINE ROOMS). CLARIFY IF THE |
| | STORAGE ROOM BY THE ELEVATOR MEETS THE CRITERIA LISTED |
| | IN THE CODE SECTION. PLEASE NOTE AN INDEPENDENT AC |
| | SYSTEM MAY BE REQUIRED. |
| | 11) M1.0A: THE E90 DIFFUSERS SHOWN AT ELEVATOR 2 AND |
| | THE SEATING AREA ARE MISLABELED PER THE TERMINAL |
| | SCHEDULE ON M0.1. |
| | 12) M1.1: THE EXHAUST TERMINATION OUTLETS FOR EF-3, & 4 |
| | ARE NOT SHOWN TO BE DISCHARGING TO THE EXTERIOR OF THE |
| | BUILDING. PLEASE CLARIFY AND SEE SECTION 501.3.1 FOR |
| | COMPLIANCE REQUIREMENTS. |
| | 13) M1.2: THE EB150 RETURN GRILLS IN THE LOCKER ROOMS |
| | ARE MISLABELED PER THE TERMINAL SCHEDULE ON M0.1. |
| | 14) M1.5: CLARIFY HOW MAKE-UP AIR IS BEING PROVIDED FOR |
| | GARAGE LEVEL 2 EXHAUST, AND PROVIDE A CALCULATION. |
| | 15) PROVIDE A SEQUENCE OF OPERATION FOR THE DUCT SMOKE |
| | DETECTORS, AND CLARIFY IF SYSTEMS IN THE SAME FIRE |
| | AREAS OR FLOORS WILL BE LINKED TOGETHER FOR FAN |
| | SHUTDOWN. IF THESE DETAILS ARE ON THE FIRE ALARM PLANS |
| | PLEASE REFERENCE THE SHEET NUMBER ON THE MECHANICAL |
| | PLANS. |
| | 16) PROVIDE SUPPORT AND HANGING DETAILS FOR |
| | INSTALLATION OF THE AHU'S AND VAV BOXES. |
| | 17) INDICATE HOW ACCESS FOR SERVICING AND REPLACEMENT |
| | OF THE AHU'S AND VAV BOXES WILL BE PROVIDED- SECTION |
| | 306.1 FBC-14 MECHANICAL. |
| | 18) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE C0 AND |
| | N02 DETECTORS WITH REVIEW AND APPROVAL SIGNATURES FROM |
| | THE ENGINEER OF RECORD. |
| | 19) SUBMIT FL. PRODUCT APPROVALS AND/OR MIAMI-DADE |
| | NOA'S FOR THE EXHAUST AND AIR INTAKE LOUVERS, THE ROOF |
| | STANDS, AND THE RTU CURBS, AND THE ROOF FAN CURBS. ALL |
| | DOCUMENTS SHALL BEAR REVIEW AND APPROVAL SIGNATURES BY |
| | THE EOR. |
| | 20) PROVIDE PRIMARY AND SECONDARY CONDENSATE DISPOSAL |
| | PLANS AND DETAILS FOR THE AHU'S AND THE MINI-SPLITS. |
| | PLEASE SHOW THE PIPING RUNS AND DISCHARGE LOCATIONS ON |
| | THE PLANS. |
| | 21) SITE SPECIFIC ENEGINEERING IS REQUIRED FOR TIE-DOWN |
| | OF ALL ROOF TOP MECHANICAL EQUIPMENT- SECTION 301.15 |
| | FBC-14 MECHANICAL. THE DETAILS ON SHEET M5.0 ARE |
| | INCOMPLETE AND REQUIRE SUBMITTALS FOR CURBS AND STANDS |
| | THAT HAVE BEEN REVIEWED AND APPROVED BY THE ENGINEER OF |
| | RECORD. THE ENGINEER OF RECORD SHALL PROVIDE THE NOA |
| | NUMBERS FOR THE COMPONENTS ON THE BOTH THE STRUCTURAL |
| | AND MECHANICAL PLANS. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 561-805-6719 |
| | [email protected] |
| | |