| Plan Review Notes For Permit 15120195 |
| Permit Number |
15120195 |
|
| Review Stop |
M |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2015-12-14 17:11:11 | 1ST REVIEW 2010 MECHANICAL | | | PERMIT #15120195 | | | 12/14/15 | | | | | | 1) PROVIDE VENTILATION CALCULATIONS IN COMPLIANCE WITH | | | TABLE 403.3. FBC-10 MECHANICAL TO VERIFY COMPLIANCE OF | | | THE 3200 CFM'S SHOWN IN THE AIR BALANCE SCHEDULE ON | | | M1.0. | | | 2) PROVIDE AC COOLING AND HEATING CALCULATIONS IN | | | COMPLIANCE WITH SECTION 503.2.1 FBC-10 ENERGY | | | CONSERVATION. | | | 3) PROVIDE ENERGY CALCULATIONS IN COMPLIANCE WITH | | | SECTION 101.4.3 FBC-10 ENERGY CONSERVATION. | | | 4) PROVIDE AN HVA C ROOF PLAN INDICATING REQUIRED | | | CLEARANCE DISTANCES FOR EXHAUST OUTLETS MECHANICAL AND | | | GRAVITY AIR INTAKES. | | | 5) PROVIDE WIND LOAD TIE DOWN ENGINEERING AND WIND | | | DESIGN CRITERIA FOR THE RTU'S, FANS, AND CURBS- REFER | | | TO SECTION 301.12 FBC-10 MECHANICAL. | | | 6) PROVIDE DUCT HANGING AND CONNECTION DETAILS. | | | 7) PROVIDE THE SEQUENCE OF OPERATION FOR THE DUCT SMOKE | | | DETECTORS PER SECTION 606.4, AND INDICATE IF THE TWO AC | | | SYSTEMS WILL BE LINKED TOGETHER FOR FAN SHUT DOWN. | | | 8) INDICATE HOW THE DS DETECTORS WILL BE SUPERVISED PER | | | SECTION 606.4.1 | | | | | | CHRISTOPHER L. COLE | | | MECHANICAL PLANS EXAMINER | | | 561-805-6719 | | | [email protected] | | | | | | |
|