| 2015-12-04 12:56:48 | 1) THE GAS INSTALLATION SHALL BE DONE UNDER A SEPARATE |
| | PERMIT. |
| | 2) INDICATE ON THE PLANS THE PSI OF THE GAS SYSTEM. IF |
| | IT IS A 2 PSI SYSTEM, SHOW THE LOCATION OF ALL THE |
| | REGULATORS ON THE PLAN. |
| | 3) WHAT DOES THE TERM "ACTARIS B42" REPRESENT ON THE |
| | GAS RISER? |
| | 4) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR ALL THE GAS |
| | APPLIANCES/EQUIPMENT. THE APPLIANCES/EQUIPMENT SHALL BE |
| | LISTED AND LABELED PER 2014 FBCR SEC. G2404.3. |
| | 5) THE PLANS SHOW PE PIPE BEING INSTALLED UNDER THE |
| | STRUCTURE. PLASTIC PIPE SHALL BE INSTALLED OUTDOORS |
| | UNDERGROUND ONLY PER 2014 FBCR SEC. G2415.17.1. |
| | 6) METAL PIPING IS NOT PERMITTED UNDERGROUND UNLESS |
| | APPROVED PROTECTIVE COATINGS OR WRAPPINGS ARE FACTORY |
| | APPLIED. ZINC COATINGS SHALL NOT BE DEEMED ADEQUATE |
| | PROTECTION FOR GAS PIPING UNDERGROUND. 2014 FBCR |
| | SEC.G2415.11. |
| | 7) SUBMIT THE CORRESPONDING EHD NUMBER FOR THE CSST PER |
| | 2014 FBCR SEC. G2413 SIZING TABLES. |
| | 8) SHOW THE TOTAL BTU LOAD OF THE GAS SYSTEMS ON THE |
| | PLAN. WPB AMEND. TO FBC SEC. 107.3.5.3. |
| | 9) SHOW THE LENGTH OF ALL SECTIONS OF GAS PIPE |
| | INCLUDING RISERS AND SHORT SECTIONS OF PIPE. WPB AMEND. |
| | TO FBC SEC. 107.3.5.3. |
| | 10) THE BTU LOAD OF EACH OUTDOOR FIREPLACE SHALL BE ON |
| | THE GAS RISER DIAGRAM. WPB AMEND. TO FBC SEC. |
| | 107.3.5.3. |
| | 11) SHT. P103 REFERS TO TABLE 402.2 (20). THERE IS NO |
| | SUCH TABLE IN THE CODE. CLARIFY. |
| | 12) THERE IS NO 170 FT. ROW IN THE GAS TABLES. THE ROW |
| | TO BE USED IS THE 175 FT. ROW.REVISE THE PLAN NOTE . |
| | 13) THE GENERATOR SHALL BE UL2200 COMPLIANT. |
| | |
| | A THOROUGH GAS REVIEW COULD NOT BE ACCOMPLISHED DUE TO |
| | THE LACK OF THE ABOVE INFORMATION. |
| | |
| | PLUMBING PLAN REVIEW |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | 561-805-6692 |
| | [email protected] |
| | |
| | |
| | |