| 2016-02-23 14:59:15 | 2ND ELECTRICAL REVIEW NOTES FOR PERMIT #:15111031 |
| | REVIEWED FOR COMPLIANCE WITH: |
| | FBC 5TH EDITION 2014 |
| | NFPA 70 2011 (NEC) |
| | |
| | CORRECTIONS REQUIRED: |
| | 1. SHEET CS1 SECTION 4 PROJECT DESCRIPTION REFERS TO |
| | THE 2008 EDITION OF THE NEC. THE APPLICABLE NEC CODE IN |
| | EFFECT IS THE 2011 EDITION. CORRECT THE NOTE |
| | ACCORDINGLY. |
| | 2. AS PREVIOUSLY MENTIONED, NEC 300.21 AS WELL AS THE |
| | FBC HAVE SPECIFIC REQUIREMENTS FOR FIRE STOPPING. |
| | SUBMIT A FIRE STOPPING DETAIL FOR ELECTRICAL BOXES |
| | INSTALLED IN A DEMISING OR FIRE RATED WALL. |
| | 3. YOU HAVE NOT PROVIDED A LIGHTING DIAGRAM AS REQUIRED |
| | BY FBC-EC405. THIS REQUIRES THAT YOU SUBMIT A FIXTURE |
| | SCHEDULE, LIGHT DENSITY ALLOWANCE CHART ALONG WITH THE |
| | REQUIRED LIGHTING CONTROLS. IN ADDITION TO THIS SHOW |
| | THE LIGHTING CIRCUITS ON THE FLOOR PLAN BECAUSE AS |
| | INDICATED IN NEC 700.12 THE EMERGENCY LIGHTING SHALL BE |
| | TIED IN TO THE LIGHTING CIRCUIT OF THE AREA THEY |
| | OCCUPY. |
| | 4. THE STAIRWAYS CONTINUE TO BE MISSING THE REQUIRED |
| | EMERGENCY LIGHTING. |
| | 5. YOU SHALL SUBMIT MANUFACTURER SPEC SHEET FOR THE |
| | TWH. |
| | 6. THE RISER DIAGRAM FAILS TO SHOW THE REQUIRED |
| | INTER-SYSTEM BONDING TERMINAL INDICATED IN NEC 250.94. |
| | WHEN RESUBMITTING, FOR A QUICKER RETURN ON YOUR |
| | RE-SUBMITTAL, PLEASE PROVIDE A RESPONSE LETTER |
| | (NARRATIVE) ADDRESSING EACH ITEM AND THE PAGE NUMBER |
| | WHERE THE CORRECTIONS APPEAR ALONG WITH THE STANDARD |
| | CITY RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT |
| | CORRECTED PAGES INTO THE SUBMITTAL PACKAGE. MARK VOID |
| | AND LEAVE THE PREVIOUSLY REVIEWED SHEETS FOR |
| | COMPARATIVE REVIEW. CLOUDING THE CHANGES WILL BE |
| | GREATLY APPRECIATED. |
| | |
| | IF YOU HAVE FURTHER QUESTIONS, PLEASE DON?T HESITATE TO |
| | CONTACT ME DIRECTLY. |
| | |
| | THANK YOU, |
| | MIKE ALBARRAN |
| | ELECTRICAL PLANS EXAMINER |
| | PH: 561-805-6746 |
| | EMAIL: [email protected] |
| | |