| 2016-08-19 16:03:50 | 2ND REVIEW FBC-2014 MECHANICAL |
| | PERMIT #15111020 |
| | 8/8/16 |
| | |
| | THIS SECOND REVIEW OF THE PLANS WILL REFERENCE COMMENTS |
| | FROM THE 1ST REVIEW THAT EITHER STILL EXIST, OR HAVE |
| | BEEN PARTIALLY RESOLVED. PLEASE NOTE THAT A |
| | PRE-SUBMITTAL MEETING WAS HELD ON JUNE 20TH MEETING |
| | HERE AT THE WPB BUILDING DEPARTMENT WHICH I ATTENDED. |
| | AT THAT MEETING THE DESIGN TEAM FOR THE PROJECT |
| | REVIEWED THE 1ST REVIEW MECHANICAL COMMENTS IN ENTIRETY |
| | AND CONCLUDED THAT ALL ISSUES WOULD BE RESOLVED ON THE |
| | SECOND SUBMITTAL. |
| | |
| | |
| | 1 ) COMMENT #1 INCLUDING SUB-COMMENTS 1-A THROUGH 1-I |
| | STILL EXIST. ALTHOUGH THE NARRATIVE RESPONSE STATES |
| | THAT THESE ISSUES HAVE BEEN ADDRESSED, THE CORRECTED |
| | DOCUMENTS AND PLANS WERE NOT SUBMITTED. |
| | |
| | 2) COMMENT # 2A STILL EXISTS. PROVIDE THE AC COOLING |
| | AND HEATING CALCULATIONS FOR THE SYSTEMS. COMMENT #2B |
| | HAS BEEN PARTIALLY ADDRESSED BUT MANY OF THE REQUESTED |
| | VENTILATION CALCULATIONS HAVE NOT BEEN PROVIDED- SEE |
| | ADDITIONAL COMMENTS BELOW. |
| | |
| | 3) COMMENT #2C, SHEET M2.0P1: THE REQUESTED EXHAUST |
| | VENTILATION CALCULATIONS FOR THE P1 PARKING GARAGE |
| | LEVEL HAVE NOT BEEN PROVIDED. PLEASE CLARIFY HOW MAKEUP |
| | AIR FOR P1 EXHAUST IS BEING PROVIDED- THE RESPONSE |
| | NARRATIVE FROM THE DESIGN PROFESSIONALS STATE THAT THE |
| | PGSF- 1A & 1B SHOWN AT LEVEL P1 ARE MAKEUP AIR FANS FOR |
| | LEVEL P2 EXHAUST. |
| | 3A) EXHAUST VENTILATION CALCULATIONS FOR THE DOG SPA |
| | NOT PROVIDED. PLEASE SUBMIT SPECS FOR THE PET DRYER IN |
| | THE SPA AND PROVIDE EXHAUST DUCT DETAILS (IF |
| | APPLICABLE). |
| | |
| | 4) MANY OF THE EXHAUST FANS SHOWN ON THE PLANS DO NOT |
| | HAVE EQUIPMENT SCHEDULES. PLEASE PROVIDE SCHEDULES FOR |
| | EF-P1-1, EF-P2-2, EF-P2-3, PEEF-1, PEEF-2, PEEF-3, |
| | PESF-1, PGEF-P1-E, PGEF-P2-C, AND ANY OTHERS NOT |
| | CURRENTLY SHOWN IN THE SCHEDULES. |
| | |
| | 5) COMMENT #2 D, SHEET M2.01: THE EXHAUST CALCULATIONS |
| | FOR THE GENERATOR AND TANK ROOMS ARE NOT IN COMPLIANCE |
| | WITH TABLE 403.3 (NOTE 1). PLEASE INDICATE WHICH CODE |
| | STANDARD WAS USED TO ESTABLISH THE EXHAUST OR ACH |
| | RATES. |
| | |
| | 6) COMMENT #2B, SHEET M2.01: THE GUEST SUITE ID NUMBERS |
| | IN THE O/A SCHEDULE DO NOT MATCH THE SUITE NUMBERS ON |
| | THE PLANS. CALCULATIONS NOT PROVIDED FOR CLUB DINING, |
| | SERVICE PANTRY, LOBBY LOUNGE, LOUNGE 2, ENTRY LOBBY, |
| | ELEVATOR LOBBIES, MAIL AND STORAGE ROOMS- PLEASE COMPLY |
| | AS PREVIOUSLY REQUESTED. |
| | |
| | 7) COMMENT #3 INCLUDING 3A, B, & C STILL EXIST. THE |
| | INCONSISTENCIES AND CONFLICTS BETWEEN THE MECHANICAL |
| | PLANS, AND SPECIFICATIONS, AND THE SMOKE CONTROL |
| | RATIONAL ANALYSIS HAVE NOT BEEN ADDRESSED AND |
| | CORRECTED. PLEASE COMPLY. SHEET M5.04: NOTE THE AIR |
| | FLOW DIRECTIONAL ARROWS FOR OAU-1 & 2 ARE POINTING IN |
| | THE OPPOSITE DIRECTION OF THE FLOW. |
| | |
| | 8) COMMENT #3D STILL EXISTS AND IS REPRINTED HERE: D) |
| | SHEETS M2.26, M2.27, M5.05, M-602: THE FOLLOWING LIST |
| | OF PRESSURIZATION AND SMOKE CONTROL FANS ARE SHOWN IN |
| | THE SCHEDULE AND RISER BUT NOT SHOWN ON THE 26TH LEVEL |
| | OR ROOF LEVEL MECHANICAL PLANS: SPF-2, SPF-3, EPF-2, |
| | EPF-4, AND SEF-1. PLEASE SHOW THE LOCATIONS OF THE FANS |
| | ON THE ROOF PLANS AND PROVIDE CLEARANCE DISTANCE |
| | MEASUREMENTS FOR ALL INLETS TO MECHANICAL AND GRAVITY |
| | EXHAUST OUTLETS. REFER TO SECTION 708.14.2.1 FBC-10 |
| | BUILDING FOR PRESSURIZATION INLET MINIMUM CLEARANCE |
| | DISTANCES TO EXHAUST OUTLETS. |
| | 9) COMMENT #5 STILL EXISTS. PLEASE PROVIDE THE |
| | REQUESTED EQUIPMENT SCHEDULES FOR THE TOILET AND |
| | KITCHEN EXHAUST FANS. |
| | |
| | 10) COMMENT # 8 STILL EXISTS, SEE DETAIL 2 ON SHEET |
| | A3.35: IT APPEARS THAT THE OUTLETS FOR THE GARAGE |
| | EXHAUST FANS PGEF-P2-1A & 1B ARE DIRECTLY OVER STAIR |
| | #9. |
| | 10 A) SHEETS A3.31- A3.37: PLEASE IDENTIFY AND LABEL |
| | THE LOCATIONS OF ALL EXHAUST OUTLETS AND AIR INTAKE |
| | OPENINGS ON LEVELS P1, P2, 1, 2 & 3 AND PROVIDE NOTES |
| | AND DIMENSIONS ON THE PLANS TO VERIFY COMPLIANCE WITH |
| | CLEARANCE DISTANCE REQUIREMENTS. |
| | |
| | 11 COMMENT #9 HAS AN INCOMPLETE RESPONSE. THE FIRE |
| | RATED ASSEMBLIES ON SHEET A8.31 ARE THE FIGURES |
| | ASSOCIATED WITH THE ASSEMBLIES, HOWEVER THE PRINTED |
| | NOTES AND SPECIFICATIONS FOR EACH ASSEMBLY WERE NOT |
| | INCLUDED. |
| | |
| | 12) COMMENT #11D STILL EXISTS. AS PREVIOUSLY PLEASE |
| | SHOW THE LOCATIONS OF THE NITROGEN DIOXIDE DETECTORS ON |
| | THE PARKING LEVELS. |
| | |
| | 13) COMMENT #11E STILL EXISTS. THE RESPONSE NARRATIVE |
| | STATES THAT THE REQUESTED FLAMEBAR SPECIFICATIONS AND |
| | DRAWINGS ARE FOUND ON SHEET M4.07, HOWEVER THAT PLAN |
| | SHEET WAS NOT INCLUDED IN THE UPLOADED PLAN SETS. |
| | |
| | 14) COMMENTS #11G, 11H, 11I, 11J, 11K, 11L, 11M, 11O, |
| | 11Q, & 11P, 11Q, 11R, 11S, 11T, & 11V STILL EXIST: |
| | REFER BACK TO 1ST REVIEW COMMENTS AND CORRECT THE PLANS |
| | ACCORDINGLY. |
| | |
| | 15) COMMENT #12A: REQUESTED EVIDENCE OF FLOOD PROOF |
| | CONSTRUCTION TO PROTECT MECHANICAL EQUIPMENT NOT |
| | PROVIDED. THE COMMENT FROM THE 1ST REVIEW IS REPRINTED |
| | HERE: |
| | A) SHEET M2.0P2: REFER TO SECTION 301.16 AND PROVIDE |
| | EVIDENCE TO INDICATE COMPLIANCE FOR MECHANICAL |
| | EQUIPMENT LOCATED IN A FLOOD HAZARD AREA. SOME OF THE |
| | EQUIPMENT INCLUDED ARE THE HEAT PUMPS, THE FANS, THE |
| | DAMPERS, THE DUCTWORK, THE DETECTORS, THE LOUVERS ETC. |
| | 301.16 FLOOD HAZARD. |
| | FOR STRUCTURES LOCATED IN FLOOD HAZARD AREAS, |
| | MECHANICAL SYSTEMS, EQUIPMENT AND APPLIANCES SHALL BE |
| | LOCATED AT OR ABOVE THE ELEVATION REQUIRED BY SECTION |
| | 1612 OF THE FLORIDA BUILDING CODE, BUILDING FOR |
| | UTILITIES AND ATTENDANT EQUIPMENT. |
| | EXCEPTION: MECHANICAL SYSTEMS, EQUIPMENT AND APPLIANCES |
| | ARE PERMITTED TO BE LOCATED BELOW THE ELEVATION |
| | REQUIRED BY SECTION 1612 OF THE OF THE FLORIDA BUILDING |
| | CODE, BUILDING FOR UTILITIES AND ATTENDANT EQUIPMENT |
| | PROVIDED THAT THEY ARE DESIGNED AND INSTALLED TO |
| | PREVENT WATER FROM ENTERING OR ACCUMULATING WITHIN THE |
| | COMPONENTS AND TO RESIST HYDROSTATIC AND HYDRODYNAMIC |
| | LOADS AND STRESSES, INCLUDING THE EFFECTS OF BUOYANCY, |
| | DURING THE OCCURRENCE OF FLOODING UP TO SUCH ELEVATION. |
| | |
| | 16) COMMENT #12D, 12F, 12G, 12H STILL EXIST. REFER BACK |
| | TO 1ST REVIEW COMMENTS AND CORRECT THE PLANS |
| | ACCORDINGLY. |
| | |
| | 17) COMMENT #12I STILL EXISTS: THE REQUESTED LOUVER |
| | IDENTIFICATIONS AND CLEARANCES NOT SHOWN AS INDICATED |
| | IN THE RESPONSE NARRATIVE. |
| | 18) COMMENT #12J STILL EXISTS: DUCT FIRESTOPPING DETAIL |
| | AT MEMBRANE PENETRATION NOT PROVIDED. PLEASE NOTE THAT |
| | THE FLAMEBAR INSTALLATION DETAILS AND FIRESTOPPING |
| | ASSEMBLIES HAVE NOT BEEN SUBMITTED. |
| | |
| | 19) COMMENT #12K STILL EXISTS: FAN SCHEDULE AND |
| | CLEARANCE HEIGHTS FOR THE GARAGE CIRCULATION FANS NOT |
| | PROVIDED. |
| | |
| | 20) COMMENT #12L STILL EXISTS: DUCT CLEARANCE HEIGHTS |
| | IN THE PARKING GARAGES NOT PROVIDED. |
| | |
| | 21) COMMENTS #12N & 12O STILL EXIST: NO CORRECTIONS OR |
| | UPDATES TO THE PLAN SHEETS HAVE BEEN MADE IN REGARD TO |
| | THESE COMMENTS. |
| | |
| | 22 ) COMMENT #13B: THE NOTE REGARDING TRANSFER TIME |
| | FULL STANDBY POWER FOR THE GENERATOR HAS NOT BEEN ADDED |
| | TO THE RATIONAL ANALYSIS AS INDICATED IN THE NARRATIVE. |
| | PLEASE INDICATE ON WHICH ELECTRICAL PAGE THE EQUIPMENT |
| | SCHEDULE FOR THE GENERATOR CAN BE FOUND, AND AS |
| | PREVIOUSLY REQUESTED, PROVIDE THE MANUFACTURER?S |
| | SPECIFICATIONS FOR THE GENERATOR AND FUEL TANK. |
| | |
| | 23) COMMENTS 13C, 13D, & 13E: SEE SHEET A3.36 (AS |
| | INDICATED IN THE RESPONSE NARRATIVE) AND LABEL THE |
| | GENERATOR AND TANK ROOM AIR INLETS AND EXHAUST OUTLETS. |
| | |
| | 24) COMMENT #13F STILL EXISTS: THE RESPONSE NARRATIVE |
| | STATES "SEE PLUMBING DRAWINGS". PLEASE INDICATE WHICH |
| | PLUMBING PLAN SHEET THE PIPING DIAGRAMS AND |
| | SPECIFICATIONS FOR THE GENERATOR AND FUEL TANK CAN BE |
| | FOUND. |
| | |
| | 25) COMMENTS #13G, 13H, & 13I STILL EXIST: AS STATED IN |
| | THE NARRATIVE PLEASE SHOW AND LABEL THE LOCATIONS OF |
| | THE AIR INLETS AND EXHAUST OUTLETS IN QUESTION- REFER |
| | TO 1ST REVIEW COMMENTS. |
| | |
| | 26) COMMENT #13J1 STILL EXISTS: SOME OF THE REQUESTED |
| | DETAILS AND PLAN VIEWS OF THE MANICURE AND PEDICURE |
| | EXHAUST SYSTEMS WERE FOUND ON SHEET M4.06. PLEASE ADD |
| | THIS INFORMATION TO THE DRAWINGS: A) TYPE OF EXHAUST |
| | DUCTWORK. B) SEQUENCE OF OPERATION FOR THE EXHAUST |
| | SYSTEM. |
| | |
| | 27) COMMENT #13J2 STILL EXISTS: NAIL SALON EXHAUST FAN |
| | EQUIPMENT SCHEDULE NOT PROVIDED. |
| | |
| | 28 ) COMMENT #13J3 STILL EXISTS: RECIRCULATION OF AIR |
| | FROM THE HAIR DRESSING AND NAIL SALON TO THE CONFERENCE |
| | ROOM IS PROHIBITED- HP-1L-5 & HP-1L6 ARE SHARING A |
| | COMMON PLENUM. THE REQUIRED SMOKE DETECTOR HAS NOT BEEN |
| | PROVIDED AND SHOWN IN THE PLENUM. |
| | |
| | 29) SHEET M2.01: THE 8 IN. FLEX DUCTS IN THE SALON |
| | SUPPLYING 400 CFMS OF AIR ARE UNDERSIZED. PLEASE REVIEW |
| | ALL FLEX DUCT SIZES FOR COMPLIANCE WITH ASHRAE SIZING |
| | STANDARDS. |
| | |
| | 30) COMMENTS #13K1-7 STILL EXIST. SHEET M2.01: THE FIRE |
| | DAMPER SYMBOL AT THE SHAFT WAS NOT PLACED ON THE PLAN. |
| | M4.06: THE INFORMATION PROVIDED IN THE NARRATIVE |
| | RESPONSE SHOULD BE ADDED TO THE EXHAUST DETAILS. SEE |
| | SECTION 504.8 FOR ADDITIONAL COMPLIANCES AND REVISE THE |
| | DETAIL TO INDICATE COMPLIANCE FPR: GAUGE OF EXHAUST |
| | DUCT STEEL, LOCATION OF THE EXHAUST FAN MOTOR |
| | (EF-GL-1), CONTINUOUS EXHAUST OPERATION AND CONNECTION |
| | TO STANDBY POWER, LINKAGE TO MAKEUP AIR SOURCE, |
| | LOCATION AND DETAILS FOR REQUIRED CLEANOUT. |
| | |
| | 31) SHEET M4.06: A B-VENT IS SHOWN FOR THE IRONER |
| | EXHAUST. CLARIFY IF THE IRONER AND DRYERS ARE GAS-FIRED |
| | AND PROVIDE COMBUSTION AIR CALCULATIONS, AND INDICATE |
| | HOW THE COMBUSTION AIR IS TO BE PROVIDED IF APPLICABLE- |
| | SEE SECTION 304 FBC-10 FUEL GAS. REFER TO TABLE |
| | 504.2(1) AND PROVIDE COMPLETE VENTING DIAGRAMS, AND AS |
| | PREVIOUSLY REQUESTED, PROVIDE MANUFACTURER?S |
| | SPECIFICATIONS FOR THE APPLIANCES, INCLUDING |
| | MANUFACTURER?S GUIDELINES FOR VENTING. |
| | |
| | 32) COMMENT 13L STILL EXISTS: EXHAUST SYSTEM FOR THE |
| | SOUTH CORE TRASH ROOM NOT PROVIDED. A) THERE IS A |
| | MISSING FIRE DAMPERS FOR THE 10"X6" DUCT PENETRATING |
| | THE FIRE-RATED TRASH/STORAGE ROOM WALL. |
| | |
| | 33) COMMENT #13N STILL EXISTS: LABEL THE HEAT PUMPS IN |
| | THE PACKAGE ROOM AND THE TEL/ELEC ROOMS AND INCLUDE |
| | THEM IN THE SCHEDULES. MECHANICAL CLOSET AND PLENUM |
| | DETAILS NOT PROVIDED AS REQUESTED. |
| | |
| | 34) COMMENT #13O STILL EXISTS- REFER TO 1ST REVIEW |
| | COMMENT. |
| | |
| | 35 ) COMMENTS #13Q, 13R, & 13S STILL EXIST- REFER TO |
| | 1ST REVIEW COMMENTS. PLEASE NOTE: IN REGARD TO 13R, |
| | ACCESS PANELS SHALL BE PROVIDED FOR ALL MECHANICAL |
| | EQUIPMENT AND APPLIANCES THAT ARE LOCATED ABOVE HARD |
| | CEILINGS. REVISE THE PLANS TO SHOW THE LOCATIONS OF |
| | REQUIRED PANELS AND PROVIDE ARCHITECTURAL AND |
| | INSTALLATION DETAILS. |
| | |
| | 36) COMMENT #13T, SHEET M2.01: IT APPEARS THAT O/A IS |
| | NOW BEING PROVIDED MECHANICALLY TO THE GUEST SUITES, |
| | HOWEVER THE NARRATIVE IS STATING THAT NATURAL |
| | VENTILATION WILL BE PROVIDED THROUGH OPERABLE OPENINGS- |
| | SEE MECHANICAL DRAWINGS. |
| | |
| | 37) COMMENT #13U, SHEET M2.01: THE RESPONSE NARRATIVE |
| | INDICATES ACCESS FOR MAINTENANCE OF THE HP-1 UNITS IN |
| | THE GUEST SUITES WILL BE THROUGH THE RETURN GRILLS. |
| | PROVIDE THE DIMENSIONS OF THE GRILLS AND VERIFY THEY |
| | WILL BE SIZED LARGE ENOUGH TO REPLACE THE UNITS- SEE |
| | SECTION 306.1. AS PREVIOUSLY REQUESTED IN THE 1ST |
| | REVIEW, PROVIDE AN ENLARGED DETAIL OF THE HP CLOSET. |
| | |
| | 38) COMMENT #14A STILL EXISTS: LABEL THE AIR INTAKE AND |
| | EXHAUST OUTLET OPENINGS ON THE ARCHITECTURAL |
| | ELEVATIONS. |
| | |
| | 39) COMMENT #14H STILL EXISTS: PROVIDE AN EXHAUST |
| | SYSTEM FOR THE TRASH ROOM AND THE JANITOR'S CLOSET- |
| | TABLE 6-4 ASHRAE 62.1-2007. |
| | |
| | 40) COMMENT #14K STILL EXISTS: FIRE DAMPERS ARE MISSING |
| | FOR THE 26?X12? SUPPLY AND RETURN DUCTS OF HP-2L-3. THE |
| | RESPONSE NARRATIVE IS CLAIMING AN EXCEPTION PER SECTION |
| | 716.5.2 FBC-10 BUILDING. PLEASE INDICATE WHICH OF THE |
| | THREE EXCEPTIONS LISTED IN THE SECTION IS BEING CLAIMED |
| | AND PLACE NOTES ON THE PLAN TO CLARIFY. |
| | |
| | 41) COMMENT #14L STILL EXISTS: SEE COMMENT #37 ABOVE |
| | FOR COMPLIANCE INFORMATION. |
| | |
| | 42) COMMENT #14M FROM THE 1ST REVIEW WAS ?ADVISORY? |
| | PENDING BUILDING REVIEW REGARDING THE 2-STORY ATRIUM AT |
| | THE LOBBY. |
| | |
| | 43) SHEET M2.02: PROVIDE AIR BALANCE CALCULATIONS |
| | |
| | 44) M2.02: PROVIDE EQUIPMENT SCHEDULES FOR THE VARIOUS |
| | UNLABELED (EF) EXHAUST FANS SERVING THE MEN'S AND |
| | WOMEN'S BATH AND LOCKER ROOMS IN THE SOUTH CORE. |
| | |
| | 45) M2.02: SHOW THE RETURN SYSTEM IN THE MASSAGE ROOM. |
| | |
| | 46) M2.02: PROVIDE A MOTORIZED DAMPER FOR THE O/A DUCT |
| | TO HP-2L-1. |
| | |
| | 47) M2.02: PROVIDE A DETAIL FOR THE RETURN AIR THROUGH |
| | THE CEILING COVES, AND INDICATE THE RETURN AIR CFM |
| | CAPACITIES OF THE DEVICES- SEE NOTE #2. |
| | |
| | 48) COMMENTS #15 STILL EXISTS: AS DIRECTED BY THE |
| | RESPONSE NARRATIVE, I REVIEWED SHEET M2.53A, HOWEVER |
| | THE DUCT LAYOUT PLANS APPEAR INCOMPLETE WITH MANY OF |
| | THE DUCT SIZES IN THE CORE AND THE SUITES NOT SHOWN AND |
| | DIFFUSERS AND OTHER COMPONENTS NOT IDENTIFIED OR TAGGED |
| | PROPERLY. ADDITIONALLY THERE IS AN UNIDENTIFIED DUCT |
| | FROM THE NORTH CORE SHAFT THAT APPEARS TO BE CONVEYING |
| | O/A INTO THE CORRIDOR AND AIR INTO THE GUEST SUITE 11-1 |
| | BATH. THIS DOES NOT MATCH THE REVISE O/A SYSTEM SHOWN |
| | ON M2.02. A) PLEASE CLARIFY WHY CONDENSER WATER PIPING |
| | IS SHOWN ON THIS RCP PLAN. TYPICALLY THE PIPING LAYOUTS |
| | AND DETAIL ARE PLACED ON MECHANICAL PIPING PLAN SHEETS. |
| | |
| | 49) COMMENTS #16- 19 STILL EXIST FOR SHEETS M2.03, |
| | M2.05, M2.17, M2.18, M2.20, M2.21, M2.22, M2.23, M2.24, |
| | & M2.25 ALL OF THESE PLAN SHEETS HAVE INCOMPLETE DUCT |
| | LAYOUT PLANS IN THE NORTH AND SOUTH CORES, AND ONLY |
| | PROVIDE RCP FOR THE RESIDENTIAL AREAS. THE NARRATIVE |
| | STATES THAT THE DETAILS ARE FOUND ON THE ENLARGED |
| | SHEETS, HOWEVER THE CORE LAYOUTS ON THESE SHEETS ARE |
| | ALSO INCOMPLETE. PLEASE REVIEW AND REVISE. PLEASE NOTE |
| | THAT SOME SHEETS HAVE WATER PIPING DETAILS WHICH, AS |
| | STATED BEFORE, SHOULD BE ON SEPARATE MECHANICAL SHEETS. |
| | |
| | 50) COMMENTS #20A, 20B, & 20C REGARDING THE BOILER |
| | INSTALLATION AND VENTING ARE RESERVED PENDING SUBMITTAL |
| | OF MANUFACTURER'S SPECIFICATIONS WITH APPROVAL |
| | SIGNATURE BY THE EOR. |
| | |
| | 51) COMMENT #20D IS RESERVED PENDING APPROVED |
| | SUBMITTALS. |
| | |
| | 52 ) COMMENT #20E STILL EXISTS: THE NARRATIVE |
| | REFERENCES SHEET M4.01 FOR THE REQUESTED DETAILS |
| | HOWEVER THE DETAILS ARE SHOWN ARE INCOMPLETE. PLEASE |
| | PROVIDE THE CLEARANCE HEIGHT ABOVE THE ROOF SURFACE TO |
| | THE BOTTOM OF THE COOLING TOWER- SEE DETAIL (4/S5.31) |
| | AND PROVIDE THE DIMENSION. PLEASE NOTE THAT SHEET |
| | |
| | 53 ) COMMENT #20F STILL EXISTS. AS NOTED IN THE DETAILS |
| | ON SHEET M4.01, PROVIDE COMPLETE ENGINEERED PLANS AND |
| | DETAILS FOR INSTALLATION OF ALL ROOFTOP MECHANICAL |
| | EQUIPMENT AND SUPPORTS. |
| | |
| | 54) COMMENT #20G IS RESERVED PENDING FURTHER |
| | INFORMATION AND PLAN REVISIONS. |
| | |
| | 55) SHEET M5.03: PLEASE REVIEW THE FOLLOWING LIST OF |
| | MECHANICAL CODE COMPLIANCES FOR THE DRYER EXHAUST: |
| | |
| | 504.8 COMMON EXHAUST SYSTEMS FOR CLOTHES DRYERS LOCATED |
| | IN MULTISTORY STRUCTURES. |
| | WHERE A COMMON MULTISTORY DUCT SYSTEM IS DESIGNED AND |
| | INSTALLED TO CONVEY EXHAUST FROM MULTIPLE CLOTHES |
| | DRYERS, THE CONSTRUCTION OF THE SYSTEM SHALL BE IN |
| | ACCORDANCE WITH ALL OF THE FOLLOWING: |
| | |
| | 1. THE SHAFT IN WHICH THE DUCT IS INSTALLED SHALL BE |
| | CONSTRUCTED AND FIRE-RESISTANCE RATED AS REQUIRED BY |
| | THE FLORIDA BUILDING CODE, BUILDING. |
| | |
| | 2. DAMPERS SHALL BE PROHIBITED IN THE EXHAUST DUCT. |
| | PENETRATIONS OF THE SHAFT AND DUCTWORK SHALL BE |
| | PROTECTED IN ACCORDANCE WITH SECTION 607.5.5, EXCEPTION |
| | 2. |
| | |
| | 3. RIGID METAL DUCTWORK SHALL BE INSTALLED WITHIN THE |
| | SHAFT TO CONVEY THE EXHAUST. THE DUCTWORK SHALL BE |
| | CONSTRUCTED OF SHEET STEEL HAVING A MINIMUM THICKNESS |
| | OF 0.0187 INCH (0.4712 MM) (NO. 26 GAGE) AND IN |
| | ACCORDANCE WITH SMACNA DUCT CONSTRUCTION STANDARDS. |
| | |
| | 4. THE DUCTWORK WITHIN THE SHAFT SHALL BE DESIGNED AND |
| | INSTALLED WITHOUT OFFSETS. |
| | |
| | 5. THE EXHAUST FAN MOTOR DESIGN SHALL BE IN ACCORDANCE |
| | WITH SECTION 503.2. |
| | |
| | 6. THE EXHAUST FAN MOTOR SHALL BE LOCATED OUTSIDE OF |
| | THE AIRSTREAM. |
| | |
| | 7. THE EXHAUST FAN SHALL RUN CONTINUOUSLY, AND SHALL BE |
| | CONNECTED TO A STANDBY POWER SOURCE. |
| | |
| | 8. EXHAUST FAN OPERATION SHALL BE MONITORED IN AN |
| | APPROVED LOCATION AND SHALL INITIATE AN AUDIBLE OR |
| | VISUAL SIGNAL WHEN THE FAN IS NOT IN OPERATION. |
| | |
| | 9. MAKEUP AIR SHALL BE PROVIDED FOR THE EXHAUST SYSTEM. |
| | |
| | 10. A CLEANOUT OPENING SHALL BE LOCATED AT THE BASE OF |
| | THE SHAFT TO PROVIDE ACCESSTO THE DUCT TO ALLOW FOR |
| | CLEANING AND INSPECTION. THE FINISHED OPENING SHALL BE |
| | NOT LESS THAN 12 INCHES BY 12 INCHES (305 MM BY 305 |
| | MM). |
| | |
| | 11. SCREENS SHALL NOT BE INSTALLED AT THE TERMINATION. |
| | |
| | 12. THE COMMON MULTISTORY DUCT SYSTEM SHALL SERVE ONLY |
| | CLOTHES DRYERS AND SHALL BE INDEPENDENT OF OTHER |
| | EXHAUST SYSTEMS. |
| | |
| | PROVIDE NOTES AND DETAILS ON THE PLANS TO INDICATE |
| | COMPLIANCE WITH ALL REQUIREMENTS. A) SHOW THE LOCATION |
| | OF THE DRYER EXHAUST SHAFT MAKE UP AIR DUCTS AND |
| | DAMPERS ON THE MECHANICAL FLOOR PLANS. PROVIDE |
| | CALCULATIONS. |
| | |
| | 56) SHEET M5.07 SHOWS CT-01 AND CT-2, HOWEVER THE |
| | COOLING TOWER IS INDICATED AS CT-1 ON ALL OTHER SHEETS- |
| | PLEASE CLARIFY. |
| | |
| | 57) M2.54A: THE 30"X10" DUCT CANNOT PENETRATE INTO |
| | STAIR #3- SECTION 1022.4 FBC-10 BUILDING A) LABEL ALL |
| | THE EXHAUST FAN CHASES. B) SHOW ALL COMPONENTS OF THE |
| | RETURN AIR SYSTEMS AND PROVIDE DETAILS B) CLARIFY HOW |
| | THE UNITS WILL BE VENTILATED- NATURALLY OR MECHANICALLY |
| | AND PROVIDE DETAILS AND CALCULATIONS. C) PROVIDE AN AIR |
| | DEVICE SCHEDULE D) INDICATE HOW ACCESS FOR SERVICE AND |
| | REPLACEMENT OF THE HP UNITS WILL BE PROVIDED. E) SHOW |
| | ALL DUCT DIMENSIONS IN THE NORTH CORE. F) INDICATE HOW |
| | THE TEL/ELEC ROOMS WILL BE VENTILATED. |
| | |
| | 58) M2.54B: THE 18"X10" RETURN DUCT TO HP-F CANNOT |
| | PENETRATE INTO STAIR #1- SECTION 1022.4 FBC-10 BUILDING |
| | A) LABEL ALL THE EXHAUST FAN CHASES. B) SHOW ALL |
| | COMPONENTS OF THE RETURN AIR SYSTEMS AND PROVIDE |
| | DETAILS B) CLARIFY HOW THE UNITS WILL BE VENTILATED- |
| | NATURALLY OR MECHANICALLY, AND PROVIDE DETAILS AND |
| | CALCULATIONS. C) PROVIDE AN AIR DEVICE SCHEDULE D) |
| | INDICATE HOW ACCESS FOR SERVICE AND REPLACEMENT OF THE |
| | HP UNITS WILL BE PROVIDED. E) SHOW ALL DUCT DIMENSIONS |
| | IN THE SOUTH CORE. F) INDICATE HOW THE TEL/ELEC ROOMS |
| | WILL BE VENTILATED. |
| | |
| | 59) SHEETS M2.55A&B, M2.56A B, M2.56A&B, M2.57A&B, |
| | M2.58B, M2.59A&B, M2.60B, M2.61A & M2.61A: THE DUCTS |
| | PENETRATING THE EXIST STAIRWAY ENCLOSURES ARE NOT |
| | PERMITTED PER SECTION 1022.4 FBC-10 BUILDING. PLEASE |
| | REVIEW AND REVISE THE PLANS PER COMMENTS #57 & 58 A-F |
| | PRINTED ABOVE. SHOW ALL DUCT, DIFFUSER, AND RETURN |
| | GRILL DIMENSIONS AND CFM CAPACITIES. |
| | |
| | 60) IN ORDER TO EXPEDITE THE REVIEW PROCESS, PLEASE |
| | OVERLAY THE LIFE SAFETY PLANS ONTO THE MECHANICAL DUCT |
| | LAYOUT PLANS SO THAT FIRE-RATED AND REQUIRED FD'S AND |
| | FSD'S ARE READILY IDENTIFIED. IT IS ALSO HELPFUL TO |
| | PROVIDE ROOM IDENTIFICATIONS ON THE PLANS. |
| | |
| | THIS SECOND REVIEW IS CONCLUDED, HOWEVER THERE MAY BE |
| | ADDITIONAL COMMENTS FOLLOWING RESUBMITTAL OF CORRECTED |
| | PLANS. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 561-805-6719 |