2016-02-01 14:58:47GEORGE JOHNSON
 PLUMBING PLANS EXAMINER
 CITY OF WEST PALM BEACH
  561-805-6711
 [email protected]
  
 PLUMBING COMMENTS:
  
 1. SHT. A6-70F DETAIL 3 IS CALLING OUT BATH 2 FOR SPEC
 B FHA, DETAIL 2 IS CALLING OUT BATH 2 AS STANDARD ,IT
 APPEARS TO BE A TYPO PLEASE CLARIFY.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 2. SHOLL WHICH BATHROOM IS DESIGNATED FOR FHA UNIT
 21A-21B.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 3.SHT. A2-75A REFERS TO A2-60A THEY DO NOT MATCH PLEASE
 CLARIFY.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 4.SHOW HEIGHT OF SINK IN ADMINISTRATION OFFICE TO
 COMPLY WITH FBC ACC. SEC. 606.3
 5. SHOW ACCESSIBILITY LEVEL FOR AMENITY BATH ROOMS ON
 LEVEL 1-3.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 6. SHT. P5-01 AND P5-01 THE LINES FOR FLOOR LEVELS AND
 WATER PIPES LOOK THE SAME. PROVIDE CLEAR ISOMETRIC
 WATER RISER DIAGRAM.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 7. PROVIDE AN EXPANDED ISOMETRIC HOT AND COLD WATER
 RISER DIAGRAM FOR UNITS AND AMENITYS AND GUEST SUITES.
 PER WPB AMEND. TO FBC SEC. 107.2.
 8.LABEL WATER RISERS TO COINCIDE WITH UNIT DESIGNATION.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 9. WATER HAMMER ARRESTOR REQUIRED FOR TRASH SHUTE FLUSH
 RING TO COMPLY WITH FBC PL.SEC. 604.9
 10. PROVIDE ISOMETRIC FOR COOLING TOWER FILL PIPING.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 11. SHT. P5-01 SHOWS 6IN. CW RISER RUNNING UP FROM
 PUMPS TO BLADDER TANKS WHERE DOES IT CONNETC WITH THE
 REST OF THE WATER RISER PLEASE CLARIFY.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 12. PROVIDE HOT WATER ISOMETRIC.RISER DIAGRAM.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 13. SIZE ALL SECTIONS OF PIPE ON HOT AND COLD ISOMETRIC
 RISER DIAGRAM.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 14.INDICATE DIRECTION OF FLOW MORE CLEARLY ON HOT WATER
 RECIRCULATION SYSTEM.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 15. PLEASE PROVIDE ISOMETRIC RISER DIAGRAM FOR SANITARY
 SHT.P5-03
 PER WPB AMEND. TO FBC SEC. 107.2.1
 16.SHT. P5-13 SHOWS S-13A NOT SHOWN ON P5-05 PLEASE
 CLARIFY.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 17.AAV. ARE NOT ALLOWED BELOW FOURTH BRANCH INTERVAL
 DOWN FROM THE TOP OF THE STACK. SHALL COMPLY WITH. FBC
 PL. SEC.918.3.1
  
 18. PLEASE LABEL ALL STACKS TO MATCH
 .PER WPB AMEND. TO FBC SEC. 107.2.
 19. PROVIDE EXPANDED ISOMETRIC DRAWINGS FOR ALL
 DWELLING UNITS AND AMENITY'S ONES PROVIDED ARE TO
 COMPACK.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 20. INDICATE BATHROOM # ON SANITARY ISOMETRIC DETAILS.
 PER WPB AMEND. TO FBC SEC. 107.2.
 21.SHT P5.06 DOES NOT MATCH PLEASE CLARIFY.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 22.SHT P5-03 SHOW ALL STACKS MISSING
 S3/S6-8/S11/S14-16/S18-19/S21-15/S28-30.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 23. FIXTURE DRAINS FOR WASHING MACHINE SHALL BE 3IN.
 PER FBC PL.SEC.406.2
 24.SHT. P5-20 SHOW TRAP PRIMERS ON ALL FLOOR DRAINS AND
 HUB DRAINS.
 SHALL COMPLY WITH FBC PL.SEC. 1002.4
 25.PROVIDE FLOOR PLAN WITH PLUMBING FOR MECHANICAL ROOM
 AND ISOMETRIC.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 26.ALL VENTS THROUGH ROOF SHALL BE A MINIMUM OF 10FT
 AWAY FROM ANY AIR INTAKE.
 SHALL COMPLY WITH FBC PL. SEC.903.5
 27. P5-04 PROVIDE ISOMETRIC RISER DIAGRAM SHALL ALL
 RWL.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 28. MISSING RD1-2 ON RISER DIAGRAM SHT. P5-21 ,BETWEEN
 LINES Q+S/11+12 ON SHT.P2-26.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 29. SHT. P5-04 SHOW ALL RWL WITH SIZE AND SQ FT
 DRAINED.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 30.SHT. P5-23 DETAIL #2 LOCATION CLARIFY
 LOCATION,CLARIFY NOTE *IN RWL FOR OVERFLOW.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 31. SHT.P2-01 DD-2 BETWEEN LINES 1-2 AND A-D IS MISSING
 ON RISER DIAGRAM ON SHT. P5-24 ALSO MISSING PD BETWEEN
 LINES 1-2 A-D.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 32.SHT. P5-24 DETAIL #1 LABEL LOCATION.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 33. LABEL WITH LOCATION ALL DD+PD+AD ON RISER DIAGRAM
 AND PLUMBING FLOOR PLAN.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 34.SHT. C3-01 SHOWS EXISTING SEWER TO BE USED AS DRAIN
 FOR FOUNTAIN. WATER FROM FOUNTAIN POOLS AND WATER
 FEATURES SHALL NOT DRAIN INTO SANITARY PER. WPB ORD.
 SEC. 90-126.(5)
 35. PROVIDE CALCULATIONS FOR STORM SUMP PUMP AND OIL
 SAND SEPARATORS.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 36. SHT. P5-24 SHORT TRENCH DRAINS MISSING SQ FT CALC .
 PLEASE PROVIDE.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 37. ALL OVER FLOW DRAINS MUST BE SIZED SAME AS MAIN
 DRAINS SHALL COMPLY WITH FBC PL. SEC. 1108.3
 38. PLEASE REMOVE ALL UNUSED DETAIL FROM PLUMBING
 DETAIL SHEETS.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 39. PROVIDE MANUFACTURE SECS FOR OIL SAND SEPARATOR.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 40. SHT. P4-06 DETAIL #3 IS THIS THE OIL SAND SEPARATOR
 YOU ARE USING PLEASE CLARIFY.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 41.PROVIDE MANUFACTURE SPEC SHEETS FOR ALL PUMPS
 ,THERMOSTATIC MIXING VALVES, TANKS, WATER HEATERS ECT.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 42. CLEAN OUTS REQUIRED AT THE BASE OF ALL STACKS SHOW
 COMPLIANCE WITH. FBC PL SEC. 708.3.4
 43. SHT.P5-20 + P2-26 IT APPEARS THAT YOU ARE DRAINING
 THE CONDENSATE OR COOLING WATER INTO THE SANITARY
 SYSTEM . CONDENSATE AND COOLING TOWER WATER MUST DRAIN
 INTO STORM AND BE INCLUDED IN SIZING CALCULATIONS.
 PER. WPB ORD. SEC. 90-126(5)
 44. PROVIDE COMPLETE CONDENSATE RISER DIAGRAM WITH
 SIZING CALCULATIONS.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 45.SHOW CONNECTION OF IRRIGATION SYSTEM ON WATER RISER
 DIAGRAM.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 46. SEPARATE PERMITS REQUIRED FOR BACKFLOW PREVENTER'S
 AT METERS. FOR IRRIGATION, DOMESTIC, AND COOLING TOWERS
 POOL FILL,FIRE
 47.SHT.M4-02 NOTE ON GENERATOR DETAIL STATES THAT FUEL
 PIPPING IS TO BE DONE BY ELECTRICAL CONTRACTOR. THAT IS
 NOT IN THERE SCOPE OF REG ALLOWED BY THE STATE PLEASE
 CLARIFY.
 48. SHT. M4-04 DETAIL FOR AIR SEPARATOR, EXPANSION TANK
 SHOWS CONNECTION TO WATER SUPPLY PLEASE CLARIFY WHAT
 THIS SYSTEM IS FOR.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 49. PROVIDE MANUFACTURE SPEC SHEETS FOR GENERATOR.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 50. PLEASE PROVIDE MSDS SHEETS FOR DIESEL FUEL.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 51.PROVIDE PROVIDE DETAILED PIPING RISER DIAGRAM FOR
 DIESEL FUEL PIPING.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 52. WHERE DOES THE SUMP DRAINS ON FUEL PUMPS DISCHARGE
 TO.
 PER WPB AMEND. TO FBC SEC. 107.2.1
  
 DO TO THE DEFICIENCY'S AND SOME SHEETS BEING UNCLEAR A
 COMPLETE AND COMPREHENSIVE REVIEW OF THE PLUMBING
 SYSTEMS CAN NOT BE COMPLETED AT THIS TIME. THIS MAY
 GENERATE MORE COMMENTS UPON SECOND REVIEW.
  
 POOL COMMENTS:
  
 1. POOL ,HOT SPA POOL , HIS AND HER JACUZZIS AND ALL
 WATER FEATURES REQUIRE SEPARATE PERMIT FROM MAIN
 BUILDING.\
 2. SHALL OBTAIN OPERATING PERMIT FROM PALM BEACH COUNTY
 HEALTH DEPARTMENT.
 PER FBC SEC. 454
 NOTE: OTHER ADMINISTRATIVE AND PROGRAMMATIC PROVISIONS
 APPLY. SEE DEPARTMENT OF HEALTH (DOH) RULE 64E-9,
 FLORIDA ADMINISTRATIVE CODE AND CHAPTER 514, FLORIDA
 STATUTES. THE REGULATION AND ENFORCEMENT OF THE INITIAL
 AND ANNUAL OPERATION PERMIT FOR PUBLIC POOLS ARE
 PREEMPTED TO THE DOH. THE CONSTRUCTION PERMIT HOLDER IS
 RESPONSIBLE FOR OBTAINING AN OPERATION PERMIT ISSUED BY
 DOH, AS A PUBLIC SWIMMING POOL SHALL NOT BE PUT INTO
 OPERATION WITHOUT AN INSPECTION AND OPERATION PERMIT
 ISSUED FROM THE DOH. DOH MAY GRANT VARIANCES FROM THE
 PROVISIONS OF THE FLORIDA BUILDING CODE SPECIFICALLY
 PERTAINING TO PUBLIC SWIMMING POOLS AND BATHING PLACES
 AS AUTHORIZED BY SECTION 514.0115, FLORIDA STATUTES.
 BUILDING OFFICIALS SHALL RECOGNIZE AND ENFORCE VARIANCE
 ORDERS ISSUED BY THE DEPARTMENT OF HEALTH PURSUANT TO
 SECTION 514.0115(5), FLORIDA STATUTES INCLUDING ANY
 CONDITIONS ATTACHED TO THE GRANTING OF THE VARIANCE.
 3. SHT.W0-0.01 GENERAL NOTES SEC H ADA COMPLIANCE #1
 SWIMMING POOL SHALL COMPLY WITH FBC ACC. 2014.
 4. PROVIDE INSTALL GUIDE AND SPEC SHEETS FOR
 ACCESSIBILITY LIFT.
 NOTE: OTHER ADMINISTRATIVE AND PROGRAMMATIC PROVISIONS
 APPLY. SEE DEPARTMENT OF HEALTH (DOH) RULE 64E-9,
 FLORIDA ADMINISTRATIVE CODE AND CHAPTER 514, FLORIDA
 STATUTES. THE REGULATION AND ENFORCEMENT OF THE INITIAL
 AND ANNUAL OPERATION PERMIT FOR PUBLIC POOLS ARE
 PREEMPTED TO THE DOH. THE CONSTRUCTION PERMIT HOLDER IS
 RESPONSIBLE FOR OBTAINING AN OPERATION PERMIT ISSUED BY
 DOH, AS A PUBLIC SWIMMING POOL SHALL NOT BE PUT INTO
 OPERATION WITHOUT AN INSPECTION AND OPERATION PERMIT
 ISSUED FROM THE DOH. DOH MAY GRANT VARIANCES FROM THE
 PROVISIONS OF THE FLORIDA BUILDING CODE SPECIFICALLY
 PERTAINING TO PUBLIC SWIMMING POOLS AND BATHING PLACES
 AS AUTHORIZED BY SECTION 514.0115, FLORIDA STATUTES.
 BUILDING OFFICIALS SHALL RECOGNIZE AND ENFORCE VARIANCE
 ORDERS ISSUED BY THE DEPARTMENT OF HEALTH PURSUANT TO
 SECTION 514.0115(5), FLORIDA STATUTES INCLUDING ANY
 CONDITIONS ATTACHED TO THE GRANTING OF THE VARIANCE.
 5. SHOW ACCESSIBILITY TO HOT SPA. SHALL COMPLY WITH FBC
 ACC. SEC. 1009.4
 6. SHT.W0-1.12 MENS SPA JACUZZI SHOWS A TOILET IN THE
 JACUZZI THE TOILET IS MISSING IN THE BATHROOM NEXT TO
 IT PLEASE CORRECT.
 PERWPB AMEND. TO FBC SEC.107.2.1
 7. SHT. W1-1.02 SHOW DIMENSIONS ON ALL FLOOR INLETS MAX
 SPACING BETWEEN 20 FT MAX DISTANCE FROM ADJACENT WALL
 10FT TO COMPLY WITH FBC SEC.454.1.6.5.9.2
 8. PROVIDE DIMENSIONS AND VOLUME OF ALL COLLECTOR TANKS
 SHALL COMPLY WITH FBC SEC.454.1.6.5.10.5
 9. PROVIDE MATCH LINES ON ALL DRAWING TO SHOW
 CONTINUATION OF PIPING. PER WPBAMEND. TO FBC
 SEC.107.2.1
 10. PROVIDE MANUFACTURE SPECS FOR PUMPS AND OTHER
 EQUIPMENT .MAIN DRAIN AND SKIMMERS. PER WPBAMEND. TO
 FBC SEC.107.2.1
 11. DETAILS AND PLAN VIEWS FOR WATER FEATURES ARE
 UNCLEAR PLEASE PROVIDE COMPLETE PIPING DIAGRAMS AND
 DIMENSIONAL DEPTH OF ALL WATER FEATURES. PER WPBAMEND.
 TO FBC SEC.107.2.1
 12. SHT. W2-4.01 REFERS TO DETAIL 8 FOR BOTH DETAILS IN
 SEC B ONE SHOULD REFER TO DETAIL 7. PLEASE CLARIFY. PER
 WPBAMEND. TO FBC SEC.107.2.1
 13. SHOW ALL BACKFLOW DEVICES REQUIRED ON ALL FILL BOXS
 AND AUTO FILLS. TO COMPLY WITH FBC PL. SEC.608.1
 14. ONE URINAL IS REQUIRED IN MEN?S POOL BATHROOM. PER
 FBC PL TABLE 403.6 AND SEC 403.6
 15. EACH POOL BATHROOM SHALL BE EQUIPPED WITH BABY
 CHANGING TABLE .PER FBC PL. SEC. 403.6
 16. PROVIDE MANUFACTURE SPECS ON ALL POOL EQUIPMENT AND
 CHEMICAL TANKS. PER WPB AMEND. TO FBC 107.2.
 17. ON ALL POOL, HOT SPA, JACUZZI, SPLASH PAD AND WATER
 FEATURES. PLEASE SHOW CONTINUATION OF PIPING LABEL AND
 LIST PAGE FOR CONTINUATION. PER WPB AMEND. TO FBC SEC.
 107.2.1
 18. SHOW COMPLIANCE FOR OZONE EQUIPMENT ROOM
 VENTILATION MUST COMPLY WITH FBC SEC. 545.1.6.5.16.4.5
 19. SHOW COMPLIANCE WITH FBC SEC.545.1.6.5.16.4.6 FOR
 SELF-CONTAINED BREATHING APPARATUS.
 20. CONCENTRATION OR OZONE IN THE RETURN LINE TO THE
 SPLASH PAD SHALL NOT EXCEED 0.1MG/2 PER FBC SEC.
 454.1.6.5.16.4.3
 21. SHT. W4-1.03 EQUIPMENT TAG # DT-301 SHALL BE
 INSTALLED IN VERTICAL POSITION PER MANUFACTURE
 INSTALLATION GUIDE.
 22. ALL CARTRIDGE FILTERS SHALL COMPLY WITH FBC
 .1.6.5.5.1 FOR FILTRATION RATE CAPACITIES.
 23. ALL BACKFLOW PREVENTERS SHALL BE LEAD FREE AND
 LISTED ON THE UNIVERSITY OF SOUTHERN CALIFORNIA LIST OF
 APPROVED DEVICES. PER FBC PL SEC. 605.2 AND 605.2.1
 24. PROVIDE MSDS SHEETS FOR ALL CHEMICALS USED. PER WPB
 AMEND. TO FBC 107.2.
 25. SHT. W4-3.01 CHECK THE FLOW ARROWS @ EQUIPMENT TAG
 CL-401 THE SCHEMATIC SHOWS THE FLOW IN OPPOSITE
 DIRECTION@ CL-401 SHALL COMPLY WITH FBC 454.1.6.5.16
 26. SHT. W4-3.01 A FIXED THERMOSTAT SHALL BE MOUNTED ON
 IN POOL RECIRCULATION LINE DOWNSTREAM FROM THE POOL
 HEATER OUTLET. THERMOSTAT MOUNTED ON POOL HEATER
 OUTLETS DOES NOT MEET THIS REQUIREMENT. PER FBC SEC.
 454.1.6.5.14 CHECK ALL SYSTEMS FOR COMPLIANCE.
 27. SHT. W4-3.02 FLOW ARROWS FROM CL-501 ARE REVERSED
 SHALL COMPLY WITH FBC 454.1.6.5.16
 28. OZONE GENERATING EQUIPMENT ELECTRICAL COMPONENTS
 AND WIRING SHALL COMPLY WITH THE REQUIREMENTS OF
 CHAPTER 27 OF THIS CODE AND THE MANUFACTURER SHALL
 PROVIDE A CERTIFICATE OF CONFORMANCE. THE PROCESS
 EQUIPMENT SHALL BE PROVIDED WITH AN EFFECTIVE MEANS TO
 ALERT THE USER WHEN A COMPONENT OF THIS EQUIPMENT IS
 NOT OPERATING PER FBC 454.1.6.5.16.4.1
 29. PROVIDE SPECS FOR CHANNEL DRAINS FOR SPA AND MAIN
 DRAINS FOR POOL. PER WPB AMEND. TO FBC SEC. 107.2.1
 30. PROVIDE SPECS FOR STEAM GENERATOR AND SHOW WHAT IT
 IS GOING TO BE USED FOR. PER WPB AMEND. TO FBC SEC.
 107.2.1
 31. LABEL ALL EQUIPMENT AND CONTROLLERS ON ISOMETRIC
 VIEWS. PER WPB AMEND. TO FBC SEC. 107.2.1
 32. SHOW THE DEPTH OF ALL WATER FEATURES ON SECTION
 DRAWING PER WPB AMEND. TO FBC SEC. 107.2.1.
  
  
 DO TO THE DEFICIENCY'S AND SOME SHEETS BEING UNCLEAR A
 COMPLETE AND COMPREHENSIVE REVIEW OF THE PLUMBING
 SYSTEMS CAN NOT BE COMPLETED AT THIS TIME. THIS MAY
 GENERATE MORE COMMENTS UPON SECOND REVIEW.
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  