| 2016-02-04 15:14:26 | |
| | 1ST REVIEW: FBC 2014 MECHANICAL |
| | PERMIT # 15111020 |
| | THE BRISTOL |
| | 1/28/16 |
| | |
| | 1) PLEASE COMPARE THE DATA FOR THE AC SYSTEMS LISTED IN |
| | THE SUBMITTED ENERGY CALCULATION FORM 506-2010 WITH THE |
| | EQUIPMENT SCHEDULES ON SHEETS M6.01 & M6.02 AND THE |
| | CONDENSER WATER RISERS SHOWN ON SHEETS M5.05 AND M5.06. |
| | THE CONFLICTS AND INCONSISTENCIES IN UNIT |
| | IDENTIFICATIONS AND SIZING ARE TOO NUMEROUS TO LIST IN |
| | THIS REVIEW BUT HERE ARE SOME OF THE MORE APPARENT |
| | ISSUES A) THE RISERS INDICATE 191 HEAT PUMPS HOWEVER |
| | THE TOTAL NUMBER OF HEAT PUMPS LISTED IN THE |
| | CALCULATIONS IS 39. B) THE RISER DRAWING SHOWS HP 135, |
| | 136, AND 215, WHICH APPEAR TO BE DESIGNATED AS OAU- 1, |
| | 2, & 3 IN THE SCHEDULES AND CALCULATIONS, HOWEVER THE |
| | CAPACITIES SHOWN FOR THESE UNITS IN THE RISERS DO NOT |
| | MATCH THE CAPACITIES LISTED IN THE SCHEDULES. |
| | C) THE CALCULATIONS SHOW 1-TON, 1.25-TON, AND 10-TON |
| | HEAT PUMPS WHICH ARE NOT SHOWN IN THE WSHP EQUIPMENT |
| | SCHEDULES ON SHEET M-601. D) OAU #2, AND THE 2.5-TON, |
| | 3-TON, AND 5-TON HEAT PUMPS ARE NOT INCLUDED IN THE |
| | CALCULATIONS. E) THE AREA CALCULATION ON THE FRONT |
| | COVER OF THE ENERGY FORM INDICATES 412741 SF, HOWEVER |
| | THE PERMIT APPLICATION INDICATES 319,010 SF. F) THE |
| | FORM INDICATES A COOLING CAPACITY OF 183657 BTUH FOR A |
| | 1.5 TON UNIT? G) THE EER'S LISTED IN THE CALCULATIONS |
| | FOR MANY OF THE SYSTEMS DO NOT MATCH THE EER'S LISTED |
| | IN THE SCHEDULES. H) NO COMPLIANCE DATA IS LISTED FOR |
| | THE SUPPLY AND RETURN CONDENSER WATER PIPING AND |
| | INSULATIONS. I) IT APPEARS THAT THERE ARE ALSO MANY |
| | CONFLICTS BETWEEN THE CONDENSER PIPING RISERS AND THE |
| | MECHANICAL LAYOUT PLANS PERTAINING TO UNIT |
| | IDENTIFICATIONS AND WATER PIPING SIZES NOT MATCHING. |
| | PLEASE CORRECT ALL OF THE PLANS, RISERS AND |
| | CALCULATIONS SO THEY MATCH AND PROVIDE A COMPLETE, |
| | ACCURATE ENERGY SUBMITTAL. |
| | |
| | 2) CALCULATIONS REQUIRED BUT NOT PROVIDED: A) AC |
| | COOLING AND HEATING SYSTEM SIZING FOR ALL OF THE HEAT |
| | PUMPS AND DEDICATED OUTSIDE AIR UNITS- SECTION 503.2.1 |
| | FBC-10 ENERGY CONSERVATION. B) MINIMUM VENTILATION |
| | CALCULATIONS FOR ALL OCCUPIED ROOMS AND SPACES- TABLE |
| | 403.3 FBC-10 MECHANICAL. PROVIDE A TABLE THAT INDICATES |
| | THE REQUIRED AND PROVIDED CFM'S OF OUTDOOR AIR. C) |
| | EXHAUST VENTILATION CALCULATIONS FOR THE PARKING |
| | GARAGES AND PRIVATE GARAGES- REFER TO SECTION 404 AND |
| | TABLE 403.1. D) EXHAUST VENTILATION CALCULATIONS FOR |
| | REQUIRED ROOMS AND AREAS INCLUDING THE TRASH STORAGE, |
| | NAIL SALON, POOL EQUIPMENT ROOMS, GENERATOR AND TANK |
| | ROOMS, ETC. |
| | |
| | 3) SMOKE CONTROL AND STAIRWELL/ELEVATOR PRESSURIZATION |
| | PLANS: THERE APPEARS TO BE SOME CONFLICTS AND MISSING |
| | INFORMATION BETWEEN THE ARCHITECTURAL AND MECHANICAL |
| | PLANS AND RISERS, AND THE RATIONAL ANALYSIS FROM SLF |
| | FIRE PROTECTION ENGINEERS. A) THE CAPACITIES AND |
| | LOCATIONS OF THE STAIRWAY AND ELEVATOR HOIST-WAY |
| | PRESSURIZATION FANS AS SHOWN ON THE PLANS AND THE |
| | EQUIPMENT SCHEDULES DIFFER FROM WHAT IS SPECIFIED IN |
| | THE SMOKE CONTROL ANALYSIS FROM SLS FIRE PROTECTION |
| | ENGINEERS. THE ANALYSIS SPECIFIES STAIRS #1-4 |
| | PRESSURIZATIONS OF 10,000 CFM AT THE 25TH LEVEL AND |
| | 5000 CFM'S AND THE 1ST LEVEL, HOWEVER THE RISER DRAWING |
| | ON SHEET M5.04 INDICATES 15,000 CFM FANS AT THE 26TH |
| | LEVEL FOR STAIRS #1-3, AND 15,000 CFM'S FOR STAIR #4 AT |
| | THE GROUND FLOOR PARKING LEVEL. THESE CFM CAPACITIES |
| | CONFLICT WITH THE FAN SCHEDULE ON SHEET M-602 WHICH |
| | INDICATES 10,000 CFM INLINE FANS FOR STAIRS #1-4. B) |
| | THE ANALYSIS SPECIFIES 20,000 CFM PRESSURIZATION FOR |
| | ELEVATOR HOIST-WAYS #1-4 AT THE 25TH LEVEL, HOWEVER THE |
| | SCHEDULE LISTS THEM AT 15,000 CFM'S, AND THE RISER |
| | SHOWS CAPACITIES OF 20,000 CFM'S FOR #1 & 2 AND 30,000 |
| | CFM?S FOR #3 & 4. C) SHEET A3.21 SHOWS ELEVATOR |
| | HOIST-WAYS #2 & 4 TERMINATING AT THE 24TH LEVEL, BUT |
| | THE RISER DRAWING SHOWS THEM TERMINATING AT THE 26TH |
| | LEVEL. D) SHEETS M2.26, M2.27, M5.05, M-602: THE |
| | FOLLOWING LIST OF PRESSURIZATION AND SMOKE CONTROL FANS |
| | ARE SHOWN IN THE SCHEDULE AND RISER BUT NOT SHOWN ON |
| | THE 26TH LEVEL OR ROOF LEVEL MECHANICAL PLANS: SPF-2, |
| | SPF-3, EPF-2, EPF-4, AND SEF-1. PLEASE SHOW THE |
| | LOCATIONS OF THE FANS ON THE ROOF PLANS AND PROVIDE |
| | CLEARANCE DISTANCE MEASUREMENTS FOR ALL INLETS TO |
| | MECHANICAL AND GRAVITY EXHAUST OUTLETS. REFER TO |
| | SECTION 708.14.2.1 FBC-10 BUILDING FOR PRESSURIZATION |
| | INLET MINIMUM CLEARANCE DISTANCES TO EXHAUST OUTLETS. |
| | E) PLEASE NOTE THAT ALL MANUFACTURER?S SPECIFICATIONS |
| | FOR MECHANICAL EQUIPMENT AND COMPONENTS OF THE SMOKE |
| | CONTROL SYSTEM ( FANS, DAMPERS, DUCT AND AREA SMOKE |
| | DETECTORS, AIR INTAKE AND EXHAUST LOUVERS ETC.) SHALL |
| | BE REVIEWED AND APPROVED BY THE ENGINEER OF RECORD, AND |
| | SHALL BE PART OF THE SUBMITTAL PACKAGE- REFER TO |
| | SECTIONS 909.10 - 909-10.5 FBC-10 BUILDING. |
| | |
| | 4) PROVIDE AIR DEVICE AND AIR DISTRIBUTION SCHEDULES |
| | FOR ALL COMPONENTS OF THE HVAC AND SMOKE CONTROL |
| | SYSTEMS- MANY DEVICE SYMBOLS ARE SHOWN ON THE PLANS |
| | WITH NO SCHEDULE TO REFERENCE. |
| | |
| | 5) SHEETS M2.26 & M2.27: THE PLANS INDICATE MANY ROOF |
| | LEVEL TEF'S AND KEF'S. WHERE ARE THE EQUIPMENT |
| | SCHEDULES FOR THESE FANS?- I AM NOT SEEING THEM ON |
| | EITHER M-601 OR M-602. |
| | |
| | 6) PROVIDE A CONDENSATE DISPOSAL RISER AND ALSO PIPING |
| | DIAGRAMS FOR EACH LEVEL. INDICATE THE TYPES AND SIZES |
| | OF THE PIPING, PIPING INSULATIONS AND DISCHARGE |
| | LOCATIONS. PLEASE NOTE THAT SEC. 90-126 WPB CODE OF |
| | ORDINANCES PROHIBITS CONDENSATE FROM COOLING COILS TO |
| | BE DISCHARGED INTO THE SANITARY SEWER SYSTEM. |
| | |
| | 7) AS NUMEROUS MECHANICAL COMPONENTS SUCH AS LOUVERS |
| | AND EQUIPMENT STANDS SUBJECT TO WIND LOAD ARE SHOWN IN |
| | THE PLANS PLEASE NOTE THAT FLORIDA PRODUCT APPROVALS |
| | AND/OR MIAMI-DADE NOA'S MUST BE SUBMITTED WITH REVIEW |
| | AND APPROVAL SIGNATURES FROM THE EOR. IF ANY OF THESE |
| | PRODUCTS ARE TO BE SUBMITTED AFTER PERMITTING, PLEASE |
| | REVIEW THE FOLLOWING SECTIONS FOR THE WPB AMENDMENTS TO |
| | THE FBC-10 BUILDING: DEFERRED SUBMITTAL: 107.3.4.2 |
| | DEFERRED SUBMITTALS. FOR THE PURPOSES OF THIS SECTION, |
| | DEFERRED SUBMITTALS ARE DEFINED AS THOSE PORTIONS OF |
| | THE DESIGN THAT ARE NOT SUBMITTED AT THE TIME OF THE |
| | APPLICATION AND THAT ARE TO BE SUBMITTED TO THE |
| | BUILDING OFFICIAL WITHIN A SPECIFIED PERIOD. DEFERRAL |
| | OF ANY SUBMITTAL ITEMS SHALL HAVE THE PRIOR APPROVAL OF |
| | THE BUILDING OFFICIAL. THE REGISTERED DESIGN |
| | PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST THE |
| | DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS FOR |
| | REVIEW BY THE BUILDING OFFICIAL. DOCUMENTS FOR DEFERRED |
| | SUBMITTAL ITEMS SHALL BE SUBMITTED TO THE REGISTERED |
| | DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE WHO SHALL |
| | REVIEW THEM AND FORWARD THEM TO THE BUILDING OFFICIAL |
| | WITH A NOTATION INDICATING THAT THE DEFERRED SUBMITTAL |
| | DOCUMENTS HAVE BEEN REVIEWED AND FOUND TO BE IN GENERAL |
| | CONFORMANCE TO THE DESIGN OF THE BUILDING. THE DEFERRED |
| | SUBMITTAL ITEMS SHALL NOT BE INSTALLED UNTIL THE |
| | DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE |
| | BUILDING OFFICIAL. A)DEFERRED SUBMITTAL. 2010 FBC |
| | 107.3.4.1 PRODUCT APPROVALS. THOSE PRODUCTS WHICH ARE |
| | REGULATED BY THE DCA RULE 9N-03 SHALL BE REVIEWED AND |
| | APPROVED IN WRITING BY THE DESIGNER OF RECORD PRIOR TO |
| | SUBMITTAL FOR JURISDICTIONAL APPROVAL. |
| | |
| | 8) THE VARIOUS AIR INTAKES AND EXHAUST OUTLETS LOCATED |
| | ON THE EXTERIOR WALLS OF THE BUILDING MUST BE REVIEWED |
| | TO MEET COMPLIANCE WITH REQUIRED CLEARANCE DISTANCES AS |
| | OUTLINED IN SECTION 401.1 AND 501.2.1. PROVIDE CLEAR, |
| | DIMENSIONED ELEVATION VIEWS OF THE OPENINGS AND NOTES |
| | IN ORDER TO VERIFY COMPLIANCE. |
| | |
| | 9) PROVIDE UL TESTED AND APPROVED FIRE-STOPPING |
| | ASSEMBLIES AND DETAILS FOR ALL DUCTS PENETRATING RATED |
| | WALLS AND SHAFTS. IF THE DETAILS ARE SHOWN ON A |
| | ARCHITECTURAL PLAN, PLEASE PROVIDE A NOTE REFERENCING |
| | THAT PLAN SHEET. |
| | |
| | 10) PROVIDE A DETAIL FOR A TYPICAL FIRE DAMPER ACCESS |
| | PANEL, AND SYMBOLS ON THE PLANS TO INDICATE LOCATIONS. |
| | |
| | 11) SHEET M2.0P1: |
| | A) THE PLAN SHEET IS LABELED AS BOTH P1 AND P2: PLEASE |
| | CORRECT. |
| | B) VERIFY THE AIR INTAKES FOR SPF-4 ARE IN COMPLIANCE |
| | WITH SECTION 513.10.3. PROVIDE AN ELEVATION VIEW AND |
| | CLEARANCE DISTANCE MEASUREMENTS. |
| | C) CLARIFY THE PURPOSES OF THE AIR SUPPLY FANS PGSF-1A |
| | & 1B AND HOW THEY WERE SIZED. ARE THEY PROVIDING THE |
| | MAKE-UP AIR FOR THE GARAGE EXHAUST? IF THAT IS THE |
| | PURPOSE, PLEASE INCLUDE THEM IN THE CONTROL DIAGRAM ON |
| | SHEET M5.07. PROVIDE AN ELEVATION VIEW AND CLEARANCE |
| | DISTANCE MEASUREMENTS FOR THE INLETS. |
| | D) NITROGEN DIOXIDE DETECTORS IN CONJUNCTION WITH |
| | CARBON MONOXIDE DETECTORS ARE REQUIRED IN THE PARKING |
| | GARAGE, HOWEVER THE PLAN IS INDICATING ONLY THE CO |
| | DETECTORS. PLEASE NOTE THAT THE MANUFACTURER'S |
| | SPECIFICATIONS FOR THE DETECTORS SHALL BE REVIEWED AND |
| | APPROVED BY THE E.O.R AND BE PART OF THE SUBMITTAL |
| | PACKAGE. REFER BACK TO COMMENT #2C FOR EXHAUST |
| | CALCULATION REQUIREMENT. |
| | E) PROVIDE DUCT CONNECTION, REINFORCEMENT, SEALING, AND |
| | HANGING DETAILS FOR THE 2HR. FIRE-RATED FLAMEBAR DUCT, |
| | AND THE OUTSIDE AIR DUCTS IN THE GARAGE. INDICATE THE |
| | HEIGHTS OF THE DUCTS ABOVE THE FINISHED GARAGE FLOOR. |
| | PLEASE NOTE MANUFACTURER'S SPECIFICATIONS AND |
| | INSTALLATIONS FOR THE DUCTWORK MUST BE REVIEWED AND |
| | APPROVED BY THE E.O.R. AND INCLUDED IN THE SUBMITTAL |
| | PACKAGE. |
| | F) PROVIDE SUPPORT AND PROTECTION DETAILS FOR ALL |
| | EXPOSED PIPING IN THE GARAGE INCLUDING THE CONDENSER |
| | WATER SUPPLY AND RETURN PIPING, AND THE GENERATOR FUEL |
| | OIL PIPING. PROVIDE A SUBMITTAL FOR THE PIPE |
| | INSULATION. |
| | G) PROVIDE AN ELEVATION VIEW AND CLEARANCE DISTANCE |
| | MEASUREMENTS FOR THE OUTDOOR AIR INTAKE ON THE NORTH |
| | SIDE THAT IS SUPPLYING THE CORES- SEE SECTION 401.4. |
| | H) LABEL THE OUTSIDE AIR INTAKE FOR OAU-3 AND PROVIDE |
| | CLEARANCE DISTANCE MEASUREMENTS- SECTION 401.4 |
| | I) PROVIDE ELEVATION VIEWS AND CLEARANCE DISTANCE |
| | MEASUREMENTS FOR THE GARAGE AND TRASH EXHAUST OUTLETS |
| | ON THE NORTH SIDE- REFER TO SECTION 501.3.1. PLEASE |
| | INCLUDE THE OUTLETS FOR PGEF-P2-1A & 1B BY THE STAIR #9 |
| | J) SOUTH CORE: LABEL THE SUPPLY AND RETURN CFM'S AT THE |
| | SUPPLY DIFFUSER AND RETURN GRILLS IN THE FIREMAN'S |
| | VESTIBULE |
| | K) SOUTH CORE: PROVIDE AN EXHAUST FAN SCHEDULE FOR |
| | EF-P2-2. |
| | L) SOUTH CORE: FIRE AND FIRE/SMOKE DAMPERS MISSING AT |
| | ALL DUCTS PENETRATING THE EXTERIOR AND INTERIOR |
| | FIRE-RATED WALLS OF THE CORE. |
| | M) SOUTH CORE: INDICATE HOW ACCESS FOR SERVICE AND |
| | REPLACEMENT OF THE HEAT PUMPS ABOVE THE CEILING WILL BE |
| | PROVIDED. SHOW THE LOCATIONS OF THE PANELS AND |
| | CONSTRUCTION DETAILS. |
| | N) NORTH CORE: NO OUTSIDE AIR DUCT CONNECTIONS TO THE |
| | HEAT PUMPS INSIDE THE CORE ARE SHOWN IN THE DRAWING. |
| | O) NORTH CORE: THE SUPPLY AND RETURN DIFFUSERS AND |
| | GRILLS ARE NOT LABELED AND NO CFM'S ARE SHOWN. |
| | P) NORTH CORE: FIRE DAMPERS MISSING AT MOST OF THE DUCT |
| | PENETRATING THE EXTERIOR AND INTERIOR FIRE-RATED WALLS |
| | OF THE CORE. |
| | Q) NORTH CORE: INDICATE HOW ACCESS FOR SERVICE AND |
| | REPLACEMENT OF THE HEAT PUMPS ABOVE THE CEILING WILL BE |
| | PROVIDED. SHOW THE LOCATIONS OF THE PANELS AND |
| | CONSTRUCTION DETAILS. |
| | R) MEP ROOM: FIRE DAMPER MISSING FOR THE 28"X12" DUCT |
| | PENETRATING THE RATED MEP ROOM WALL. |
| | S) MEP ROOM: OAU-3 IS A WATER-COOLED UNIT PER THE |
| | SCHEDULE. INDICATE HOW WATER IS BEING SUPPLIED TO THE |
| | UNIT. |
| | T) POOL EQUIPMENT ROOM: IDENTIFY AND LABEL ALL |
| | EQUIPMENT IN THE ROOM AND PROVIDE SCHEDULES FOR EACH. |
| | PROVIDE EXHAUST VENTILATION CALCULATIONS FOR THE ROOM, |
| | FAN SCHEDULES FOR PEEF-1 AND PESF-1 (SHOWN ON THE LOBBY |
| | 1 LEVEL), AND SUBMITTALS FOR THE SUPPLY AND EXHAUST |
| | DUCTWORK AND FANS REVIEWED AND APPROVED BY THE EOR. SEE |
| | SECTION 304.3.1 FOR REQUIREMENTS FOR FUEL-FIRED |
| | APPLIANCES IN THE ROOM. |
| | U) INDOOR DOG RUN: PROVIDE AN EXHAUST VENTILATION |
| | SYSTEM IN ACCORDANCE WITH TABLE 403.3. INCLUDE |
| | CALCULATIONS, FAN SCHEDULES, EXHAUST DUCT RUN DETAILS |
| | AND TERMINATION LOCATIONS, AND HOW MAKE-UP AIR IS TO BE |
| | PROVIDED. |
| | V) PROVIDE EQUIPMENT SCHEDULES FOR THE CIRCULATION FANS |
| | AND INDICATE THE HEIGHT MEASUREMENTS OF THE FANS FROM |
| | THE FINISH FLOORS TO THE LOWEST EDGE OF THE FAN- SEE |
| | SECTION 304.6. |
| | |
| | 12) SHEET M2.0P2: |
| | A) REFER TO SECTION 301.16 AND PROVIDE EVIDENCE TO |
| | INDICATE COMPLIANCE FOR MECHANICAL EQUIPMENT LOCATED IN |
| | A FLOOD HAZARD AREA. SOME OF THE EQUIPMENT INCLUDED ARE |
| | THE HEAT PUMPS, THE FANS, THE DAMPERS, THE DUCTWORK, |
| | THE DETECTORS ETC. 301.16 FLOOD HAZARD. |
| | FOR STRUCTURES LOCATED IN FLOOD HAZARD AREAS, |
| | MECHANICAL SYSTEMS, EQUIPMENT AND APPLIANCES SHALL BE |
| | LOCATED AT OR ABOVE THE ELEVATION REQUIRED BY SECTION |
| | 1612 OF THE FLORIDA BUILDING CODE, BUILDING FOR |
| | UTILITIES AND ATTENDANT EQUIPMENT. |
| | EXCEPTION: MECHANICAL SYSTEMS, EQUIPMENT AND APPLIANCES |
| | ARE PERMITTED TO BE LOCATED BELOW THE ELEVATION |
| | REQUIRED BY SECTION 1612 OF THE OF THE FLORIDA BUILDING |
| | CODE, BUILDING FOR UTILITIES AND ATTENDANT EQUIPMENT |
| | PROVIDED THAT THEY ARE DESIGNED AND INSTALLED TO |
| | PREVENT WATER FROM ENTERING OR ACCUMULATING WITHIN THE |
| | COMPONENTS AND TO RESIST HYDROSTATIC AND HYDRODYNAMIC |
| | LOADS AND STRESSES, INCLUDING THE EFFECTS OF BUOYANCY, |
| | DURING THE OCCURRENCE OF FLOODING UP TO SUCH ELEVATION. |
| | B) GARAGE EXHAUST SYSTEM: CLARIFY HOW THE GARAGE |
| | EXHAUST VENT OPENING ON THE NORTH SIDE AND THE EXHAUST |
| | FANS (PGEF-P2-1A & 1B SHOWN ON M2.0P1) WERE SIZED- |
| | REFER TO COMMENT #2C. PROVIDE THE DIMENSIONS OF THE |
| | VENT OPENING AND CONSTRUCTION DETAILS. |
| | C) CLARIFY HOW MAKE-UP AIR IS BEING SUPPLIED FOR THE |
| | GARAGE EXHAUST. |
| | D) PGEF-P1-E AT THE LOADING DOCK IS NOT INCLUDED IN THE |
| | FAN SCHEDULE ON M-602, AND THE EXACT LOCATION OF THE |
| | FAN IS NOT CLEAR ON THE PLAN. PLEASE CORRECT AND |
| | PROVIDE EXHAUST VENTILATION CALCULATIONS. |
| | E) PROVIDE A MEANS OF VENTILATION FOR THE CORRIDORS |
| | ADJOINING THE PRIVATE GARAGES IN COMPLIANCE WITH |
| | SECTION 404.3. |
| | F) NITROGEN DIOXIDE DETECTORS IN CONJUNCTION WITH |
| | CARBON MONOXIDE DETECTORS ARE REQUIRED IN THE PARKING |
| | GARAGE, HOWEVER THE PLAN IS INDICATING ONLY THE CO |
| | DETECTORS. PLEASE NOTE THAT THE MANUFACTURER?S |
| | SPECIFICATIONS FOR THE DETECTORS SHALL BE REVIEWED AND |
| | APPROVED BY THE EOR AND BE PART OF THE SUBMITTAL |
| | PACKAGE. REFER BACK TO COMMENT #2C FOR EXHAUST |
| | CALCULATION REQUIREMENT. |
| | G) PROVIDE EQUIPMENT SCHEDULES FOR THE PRIVATE GARAGE |
| | INLINE FANS AND THE OTHER INLINE FANS SHOWN THROUGHOUT |
| | THE SPACE. AS PREVIOUSLY NOTED PROVIDE EXHAUST |
| | VENTILATION CALCULATIONS FOR THE PRIVATE GARAGES. |
| | H) PROVIDE FIRE DAMPERS FOR THE VENT LOUVERS SHOWN AT |
| | THE FPL VAULT AND LOADING DOCK WALLS. |
| | I) A SERIES OF LOUVERS ARE SHOWN ALONG THE SOUTH EAST |
| | WALLS OF THE LOADING DOCK. HOW WERE THESE OPENINGS |
| | SIZED AND ARE THEY BELOW THE FLOOD HEIGHT LEVEL. |
| | PROVIDE AN ELEVATION VIEW THAT SHOWS REQUIRED CLEARANCE |
| | DISTANCE MEASUREMENTS FOR AIR INTAKE AND EXHAUST. |
| | SUBMITTALS FOR THE LOUVERS AND DAMPERS REVIEWED AND |
| | APPROVED BY THE EOR ARE REQUIRED. |
| | J) PROVIDE A THROUGH UL PENETRATION FIRE-STOPPING |
| | ASSEMBLY DETAIL FOR THE O/A EXITING THE SHAFT ABOVE. |
| | PROVIDE NOTES BY THE SHAFT INDICATING WHERE THE SHAFT |
| | AND FIRE-STOPPING ASSEMBLY DETAILS CAN BE LOCATED IN |
| | THE ARCHITECTURAL PAGES. |
| | K) PROVIDE EQUIPMENT SCHEDULES FOR THE CIRCULATION FANS |
| | AND INDICATE THE HEIGHT MEASUREMENTS OF THE FANS FROM |
| | THE FINISH FLOORS TO THE LOWEST EDGE OF THE FAN- SEE |
| | SECTION 304.6. |
| | L) PROVIDE DUCT CONNECTION, REINFORCEMENT, SEALING, AND |
| | HANGING DETAILS FOR THE OUTSIDE AIR AND EXHAUST DUCTS |
| | IN THE GARAGE. INDICATE THE HEIGHTS OF THE DUCTS ABOVE |
| | THE FINISHED GARAGE FLOOR. PLEASE NOTE MANUFACTURER'S |
| | SPECIFICATIONS AND INSTALLATIONS FOR THE DUCTWORK MUST |
| | BE REVIEWED AND APPROVED BY THE E.O.R. AND INCLUDED IN |
| | THE SUBMITTAL PACKAGE. |
| | M) PROVIDE SUPPORT AND PROTECTION DETAILS FOR ALL |
| | EXPOSED PIPING IN THE GARAGE INCLUDING THE CONDENSER |
| | WATER SUPPLY AND RETURN PIPING. PROVIDE SUBMITTALS FOR |
| | ALL PIPE INSULATIONS. |
| | N) SOUTH CORE, NORTH CORE, AND ADJACENT RESIDENT |
| | STORAGE ROOMS: THE AC LAYOUT PLANS ARE IN- COMPLETE- |
| | PROVIDE DUCT SIZES, DIFFUSER AND RETURN GRILL SIZES, |
| | CFM CAPACITIES AT THE DIFFUSERS AND GRILLS, LOCATIONS |
| | OF REQUIRED FIRE AND FIRE/SMOKE DAMPERS AT DUCT |
| | PENETRATIONS, CONDENSER WATER PIPE SIZES ETC. |
| | O) SOUTH CORE, NORTH CORE: INDICATE HOW ACCESS FOR |
| | SERVICE AND REPLACEMENT OF THE HEAT PUMPS ABOVE THE |
| | CEILING WILL BE PROVIDED. SHOW THE LOCATIONS OF THE |
| | PANELS AND CONSTRUCTION DETAILS. |
| | |
| | 13) SHEET M2.01: |
| | A) PROVIDE AN ELEVATION VIEW OF THE GENERATOR EXHAUST |
| | LOUVER INDICATING REQUIRED CLEARANCE DISTANCE |
| | MEASUREMENTS PER SECTION 501.2.1. |
| | B) PROVIDE MANUFACTURER'S SPECIFICATIONS FOR THE |
| | GENERATOR AND FUEL TANK REVIEWED AND APPROVED BY THE |
| | EOR, AND INCLUDE IN THE REQUIRED SUBMITTAL PACKAGE. |
| | PLEASE NOTE THAT IN ACCORDANCE WITH SECTION 909.11 |
| | FBC-10 BUILDING, THE TRANSFER TO FULL STANDBY POWER |
| | SHALL BE AUTOMATIC AND WITHIN 60 SECONDS OF FAILURE OF |
| | THE PRIMARY POWER SYSTEMS. PLEASE REVIEW AND PROVIDE |
| | THIS NOTE IN THE RATIONAL ANALYSIS OF THE SMOKE CONTROL |
| | SYSTEM. |
| | C) INDICATE THE REQUIRED CLEARANCE DISTANCES FOR THE |
| | GENERATOR ROOM EXHAUST (501.2.1), SIZING CALCULATIONS |
| | FOR THE FANS, AND FAN SCHEDULES. |
| | D) PROVIDE AN ELEVATION VIEW OF THE GENERATOR ROOM |
| | COMBUSTION AIR LOUVER INDICATING REQUIRED CLEARANCE |
| | DISTANCE MEASUREMENTS, AND PROVIDE COMBUSTION AIR |
| | CALCULATIONS. MANUFACTURER'S SPECIFICATIONS FOR THE |
| | INTAKE LOUVER SHALL BE REVIEWED AND APPROVED BY THE EOR |
| | AND INCLUDED IN THE SUBMITTAL PACKAGE WITH A FLORIDA |
| | PRODUCT APPROVAL OR MIAMI-DADE NOA CERTIFYING WIND |
| | RESISTANCE AND IMPACT PROTECTION. |
| | E) PROVIDE ELEVATION VIEWS OF THE TANK ROOM AIR INTAKE |
| | AND EXHAUST OUTLET WITH CLEARANCE DISTANCE |
| | MEASUREMENTS. PROVIDE SIZING CALCULATIONS FOR THE |
| | SYSTEM AS PREVIOUSLY NOTED AND A EQUIPMENT SCHEDULE FOR |
| | THE FAN. PLEASE NOTE MANUFACTURER'S SPECIFICATIONS FOR |
| | THE TANK SHALL BE REVIEWED AND APPROVED BY THE EOR AND |
| | INCLUDED IN THE SUBMITTAL PACKAGE. |
| | F) PROVIDE ENLARGED FUEL PIPING DIAGRAMS FOR THE |
| | GENERATOR AND TANK. |
| | G) INDICATE THE CLEARANCE DISTANCE MEASUREMENTS FOR THE |
| | TWO O/A INTAKE INLETS ON THE EAST WALL ABOVE THE |
| | LOADING DOCK- SECTION 401.1. |
| | H) INDICATE THE CLEARANCE DISTANCE MEASUREMENTS FOR THE |
| | MANI/PEDI EXHAUST OUTLET ON THE EAST WALL- SECTION |
| | 501.2.1. |
| | I) APPLY COMMENTS G & H ABOVE FOR THE POOL EQUIPMENT |
| | ROOM VENTILATION INLET AND OUTLET ON THE SOUTH WALL. |
| | J) NAIL SALON, REFER TO TABLE 403.3 FOOTNOTES B AND H |
| | PERTAINING TO THE NAIL SALON: 1) INDICATE HOW THE |
| | CONTAMINANTS AND ODORS FROM THE NAIL POLISHES ARE BEING |
| | CAPTURED AT THEIR SOURCES- THE MANICURE AND PEDICURE |
| | STATIONS. ADDITIONAL DETAILS AND PLAN VIEWS ARE |
| | REQUIRED. 2) PROVIDE AN EXHAUST FAN EQUIPMENT SCHEDULE. |
| | 3) CLARIFY HOW MAKE-UP AIR FOR THE EXHAUST IS BEING |
| | PROVIDED AND REFER TO SECTION 403.2.1 (3) RECIRCULATION |
| | OF THE AIR FROM THE SPACE IS PROHIBITED. HOW WILL THAT |
| | BE ACCOMPLISHED WITH THE ABOVE CEILING PLENUM? PLEASE |
| | SHOW THE LOCATIONS OF THE RETURN GRILLS. 3) SHOW THE |
| | SUPPLY CFM?S AT THE DIFFUSER LOCATIONS, AND REFER TO |
| | SECTION 606.2.2 FOR REQUIRED SMOKE DETECTOR FOR THE |
| | COMMON PLENUM. |
| | K) LAUNDRY ROOM: 1) PROVIDE A FD SYMBOL AT THE 28?X12? |
| | DUCT PENETRATION INTO THE FIRE-RATED SHAFT. 2) THE |
| | DRYER EXHAUST MUST BE INDEPENDENT AND NOT CONNECTED |
| | WITH THE IRONER EXHAUST- SEE SECTION- 504.1. AND |
| | CORRECT. 3) SUBMIT MANUFACTURER?S SPECIFICATIONS FOR |
| | THE DRYERS AND IRONER WITH REVIEW AND APPROVAL |
| | SIGNATURES BY THE EOR- SEE SECTION 504.7 AND SHOW THE |
| | LOCATION OF THE EXHAUST FANS, AND INCLUDE FAN EQUIPMENT |
| | SCHEDULES (IF APPLICABLE). 4) PROVIDE EXHAUST DUCT |
| | DETAILS FOR BOTH THE DRYERS AND IRONER INCLUDING THE |
| | TYPES AND SIZES OF DUCTS, SUPPORT AND HANGING DETAILS- |
| | SEE SECTIONS 504.6.2, 504.6.4, 504.6.4.2, AND 504.7. 5) |
| | PROVIDE PLAN AND ELEVATION VIEWS SHOWING DUCT |
| | CONNECTIONS TO THE APPLIANCES, AND REQUIRED CLEARANCE |
| | DISTANCES TO COMBUSTIBLES. 6) PROVIDE FIRE-STOPPING |
| | DETAILS FOR DUCTS PENETRATING RATED WALLS. 7) PLEASE |
| | NOTE COMMON DRYER EXHAUST DUCTS SHALL RUN CONTINUOUSLY |
| | OR BE INTERLOCKED TO RUN TOGETHER. |
| | L) SOUTH CORE: PROVIDE AN EXHAUST SYSTEM FOR THE TRASH |
| | ROOM PER TABLE 6-4 ASHRAE 62.1-2010. PLEASE INCLUDE |
| | CALCULATIONS, EXHAUST FAN SCHEDULE, EXHAUST DUCT |
| | LAYOUT, TERMINATION LOCATION ETC. |
| | M) SOUTH CORE: SHOW THE EXHAUST DUCT RUNS AND DUCT |
| | SIZES AT THE MEN'S AND WOMEN'S TOILET ROOMS. |
| | N) SOUTH CORE: IDENTIFY THE 3.5 TON UNIT IN THE PACKAGE |
| | ROOM CLOSET. VERIFY A NON-COMBUSTIBLE DOOR WILL BE |
| | INSTALLED FOR THE CLOSET AND ALL OTHER MECHANICAL |
| | CLOSETS IN THE BUILDING- SECTION 603.1. SHOW THE |
| | LOCATION OF THE PLENUM RETURN GRILL AT THE CLOSET, AND |
| | THE LOCATIONS OF CEILING RETURN GRILLS IN THE LOBBY |
| | LOUNGE. PLEASE INCLUDE DIMENSIONS AND CFM CAPACITIES |
| | FOR EACH GRILL. |
| | O) SOUTH CORE CORRIDOR: THE AC PLAN IS INCOMPLETE. |
| | P) NORTH CORE: NO AC OR MEANS OF VENTILATION SHOWN IN |
| | THE TEL/ELEC ROOM. |
| | Q) NORTH CORE: CLARIFY IF A HP WILL BE INSTALLED FOR |
| | THE FIREMAN'S VESTIBULE IN THE SAME MANNER ONE IS SHOWN |
| | FOR THE SOUTH CORE, AN WHAT EQUIPMENT IS TO BE LOCATED |
| | IN MECH. CL. 127. |
| | R) NORTH CORRIDOR, LOUNGE 2, CLUB DINING: SHOW THE |
| | LOCATIONS OF THE VAV BOXES AND PROVIDE EQUIPMENT |
| | SCHEDULES. INDICATE HOW ACCESS FOR SERVICE AND |
| | REPLACEMENT FOR THE BOXES ABOVE THE CEILING WILL BE |
| | PROVIDED. SHOW THE LOCATION OF THE PLENUM RETURN GRILL |
| | AT THE MECHANICAL CLOSET FOR THE 17.5 T SYSTEM, AND IN |
| | THE CEILINGS OF THE CLUB DINING, LOUNGE 2, AND CORRIDOR |
| | 105. PLEASE INCLUDE DIMENSIONS AND CFM CAPACITIES FOR |
| | EACH GRILL. |
| | S) GUEST SUITE 1-1 IS ALSO LABELED GUEST SUITE 1-2. |
| | T) GUEST SUITES 1-1, 2-1, 4, & 4-4: INDICATE HOW |
| | REQUIRED O/A IS BEING SUPPLIED TO THESE SUITES. |
| | U) GUEST SUITES AC CLOSETS: INDICATE HOW ACCESS FOR |
| | SERVICE AND REPLACEMENT OF THE HP-1 UNITS IN THE |
| | CLOSETS WILL BE PROVIDED- THERE ARE NO DOORS SHOWN AT |
| | THE CLOSETS. PLEASE PROVIDE ENLARGED PLAN VIEWS OF THE |
| | CLOSETS INDICATED REQUIRED CLEARANCES, THE MEANS OF |
| | RETURN AIR, PRIMARY AND SECONDARY AND CONDENSATE |
| | DISPOSAL, AND CONDENSER WATER PIPING DIAGRAMS. |
| | V) CLUB DINING AND SERVICE PANTRY: CLARIFY IF ANY |
| | COOKING APPLIANCES WILL BE INSTALLED AND PROVIDE |
| | DETAILS. PLEASE NOTE, TYPE I OR TYPE II EXHAUST HOODS |
| | MAY BE REQUIRED. |
| | |
| | 14) M2.02: |
| | A) REFER BACK TO COMMENT #8- REQUIRED CLEARANCE |
| | DISTANCES FOR O/A INTAKES AND EXHAUST OUTLETS, AND SHOW |
| | COMPLIANCE. |
| | B) SOUTH: PROVIDE EQUIPMENT SCHEDULES FOR THE SAUNA AND |
| | STEAM ROOM EXHAUST FANS AND SIZING CALCULATIONS. PLEASE |
| | NOTE THE EXHAUST IS NOT SHOWN ACCURATELY PLACED IN THE |
| | WOMEN'S ROOMS, AND NO MAKE-UP AIR IS BEING PROVIDED FOR |
| | EITHER THE MEN'S OR WOMEN'S ROOMS. |
| | C) SOUTH: REQUIRED EXHAUST SYSTEMS FOR THE WOMEN'S |
| | SHOWER AND MEN'S HANDICAP SHOWER NOT SHOWN ON THE PLAN- |
| | TABLE 403.3 |
| | D) SOUTH: MECHANICAL CLOSETS ON THE EAST AND WEST SIDES |
| | OF THE CORE BY THE RESTROOMS ARE SHOWN IN THE |
| | ARCHITECTURAL PLANS- PLEASE IDENTIFY THE CLOSETS ON |
| | THIS PLAN AND INDICATE WHAT EQUIPMENT IS CONTAINED IN |
| | THE CLOSETS. |
| | E) SOUTH: PLEASE SHOW THE LOCATIONS OF ALL RETURN |
| | GRILLS AT THE MECH CLOSETS AND AT ALL OF THE CEILINGS |
| | OF THE ROOMS AND THE SPACES. PROVIDE GRILL DIMENSIONS |
| | AND CFM CAPACITIES. |
| | F) ATRIUM: PROVIDE THE DIMENSIONS AND CFM CAPACITY OF |
| | THE RETURN GRILL FOR HP-L2-5. |
| | G) ATRIUM: SHOW THE REQUIRED DUCT SMOKE DETECTOR IN THE |
| | SUPPLY PLENUM OF HP-L2-5. |
| | H) NORTH CORE: PROVIDE AN EXHAUST SYSTEM FOR THE TRASH |
| | ROOM PER TABLE 6-4 ASHRAE 62.1-2010. |
| | I) NORTH CORE: PROVIDE VENTILATION FOR THE STORAGE ROOM |
| | J) NORTH: PLEASE SHOW THE LOCATIONS OF ALL RETURN |
| | GRILLS AT THE MECH CLOSETS AND AT ALL OF THE CEILINGS |
| | OF THE ROOMS AND THE SPACES. PROVIDE GRILL DIMENSIONS |
| | AND CFM CAPACITIES. |
| | K) FIRE DAMPERS MISSING FOR THE 26"X12" DUCTS |
| | PENETRATING THE FIRE-RATED MECHANICAL CLOSET WALLS. |
| | L) NORTH GUEST SUITES: INDICATE HOW REQUIRED O/A IS |
| | BEING SUPPLIED TO THESE SUITES. INDICATE HOW ACCESS FOR |
| | SERVICE AND REPLACEMENT OF THE HP-1 UNITS IN THE |
| | CLOSETS WILL BE PROVIDED- THERE ARE NO DOORS SHOWN AT |
| | THE CLOSETS. PLEASE PROVIDE ENLARGED PLAN VIEWS OF THE |
| | CLOSETS INDICATED REQUIRED CLEARANCES, THE MEANS OF |
| | RETURN AIR, PRIMARY AND SECONDARY AND CONDENSATE |
| | DISPOSAL, AND CONDENSER WATER PIPING DIAGRAMS. |
| | M) PLEASE NOTE THAT SUBJECT TO PLAN REVISIONS BASED ON |
| | STRUCTURAL REVIEW COMMENTS, ADDITIONAL FIRE AND |
| | FIRE/SMOKE DAMPERS FOR DUCTS MAY BE REQUIRED ON BOTH |
| | LOBBY LEVEL-1 AND AMENITY LEVEL-2. |
| | |
| | 15) M2.03: INCOMPLETE RCP PLANS- THE AC DIFFUSERS AND |
| | GRILLS IN THE ROOMS ARE NOT LABELED AND NO DIMENSIONS |
| | ARE SHOWN. PLEASE REFER TO COMMENT #14(L) PRINTED ABOVE |
| | FOR THE GUEST SUITES ON THIS FLOOR. IDENTIFY ALL HP |
| | UNITS BEING SERVED BY THE SUPPLY AND RETURN WATER |
| | PIPING. DUCT LAYOUT PLANS FOR THE NORTH AND SOUTH CORES |
| | NOT SHOWN |
| | |
| | 16) M2.05: INCOMPLETE RCP PLANS- THE AC DIFFUSERS AND |
| | GRILLS ARE NOT LABELED IN THE ROOMS AND NO DIMENSIONS |
| | ARE SHOWN. IDENTIFY ALL HP UNITS BEING SERVED BY THE |
| | SUPPLY AND RETURN WATER PIPING TAGS SHOWN. F/S DAMPERS |
| | MISSING AT THE NORTH CORE AC CLOSET AND AT WEST WALL OF |
| | THE NORTH CORE BY CORRIDOR. |
| | |
| | 17) M2.17- M2.22: INCOMPLETE RCP PLANS- THE AC |
| | DIFFUSERS AND GRILLS ARE NOT LABELED IN THE ROOMS AND |
| | NO DIMENSIONS ARE SHOWN. IDENTIFY ALL HP UNITS BEING |
| | SERVED BY THE SUPPLY AND RETURN WATER PIPING TAGS |
| | SHOWN. F/S DAMPERS MISSING AT NORTH AND SOUTH CORES ON |
| | M2.17- PLEASE CHECK ALL CORES ON ALL PLANS FOR MISSING |
| | DAMPERS. |
| | |
| | 18) M2.23: INCOMPLETE RCP PLANS- THE AC DIFFUSERS AND |
| | GRILLS ARE NOT LABELED IN THE ROOMS AND NO DIMENSIONS |
| | ARE SHOWN. IDENTIFY ALL HP UNITS BEING SERVED BY THE |
| | SUPPLY AND RETURN WATER PIPING TAGS SHOWN. THERE IS NO |
| | FLOOR PLAN LAYOUT FOR THE SOUTH SIDE SHOWING ROOMS AND |
| | SPACES. |
| | |
| | 19) M2.25 & M2.25: INCOMPLETE RCP PLANS- THE AC |
| | DIFFUSERS AND GRILLS ARE NOT LABELED IN THE ROOMS AND |
| | NO DIMENSIONS ARE SHOWN. IDENTIFY ALL HP UNITS BEING |
| | SERVED BY THE SUPPLY AND RETURN WATER PIPING TAGS |
| | SHOWN. |
| | |
| | 20) M2.26 & M2.27 |
| | A) PROVIDE COMBUSTION AIR CALCULATIONS FOR THE BOILERS |
| | AND INDICATE HOW THE AIR IS BEING PROVIDED- SEE SECTION |
| | 304 FBC-10 FUEL GAS. |
| | B) PROVIDE ENLARGED PLAN AND ELEVATION VIEWS OF THE |
| | BOILERS AND HEAT EXCHANGERS INDICATING REQUIRED WORKING |
| | CLEARANCES AND ID TAGS FOR ALL PARTS AND COMPONENTS. |
| | C) PROVIDE BOILER VENTING PLANS AND DETAILS- INCLUDING |
| | THE TYPES AND SIZES OF VENTS, LENGTH OF THE VENT RUNS, |
| | AND TERMINATION LOCATIONS. |
| | D) PROVIDE EOR REVIEWED AND APPROVED MANUFACTURER'S |
| | SPECS AND SHOP DRAWINGS FOR ALL MECHANICAL EQUIPMENT ON |
| | THE 26TH AND ROOF LEVELS INCLUDING THE BOILERS, HEAT |
| | EXHANGERS, COOLING TOWERS, AND PUMPS. ALL EQUIPMENT |
| | SHALL BE INCLUDED IN THE SUBMITTAL PACKAGE. |
| | E) PROVIDE ENLARGED VIEWS OF THE COOLING TOWERS AND OAU |
| | 1 & 2 SHOWING THE REQUIRED CLEARANCE DISTANCES FROM THE |
| | FINISHED ROOF SURFACE TO THE BOTTOM OF THE UNITS. |
| | F) REFER TO SECTION 301.12 AND PROVIDE WIND LOAD |
| | ENGINEERING FOR TIE-DOWN OF ALL MECHANICAL EQUIPMENT |
| | AND COMPONENTS EXPOSED TO WIND ON THE 26TH LEVEL AND |
| | ROOF LEVELS OF THE BUILDING INCLUDING THE COOLING |
| | TOWERS, OAU-1 & 2, THE PRESSURIZATIONS FANS, THE |
| | EXHAUST FANS, THE SUPPLY AND EXHAUST DUCTWORK, PIPE AND |
| | DUCT STANDS ETC. IF THESE DETAILS ARE PROVIDED ON THE |
| | STRUCTURAL AND ARCHITECTURAL PLANS, PLEASE PROVIDE |
| | NOTES INDICATING THE PLAN SHEETS. |
| | G) PLEASE NOTE GUARDS AND PERMANENT LADDERS MAY BE |
| | REQUIRED FOR SOME OF THE EQUIPMENT- REFER TO SECTIONS |
| | 304.11 AND 306.5. |
| | |
| | 21) BASED ON THE PREVIOUS COMMENTS I HAVE PERFORMED |
| | ONLY A CURSORY REVIEW OF THE RESIDENTIAL SUITE PLANS. |
| | IT APPEARS THAT MANY OF THE ISSUES FOUND IN THE |
| | REVIEWED PLANS ARE OCCURRING IN THOSE PLANS ALSO. AT |
| | THIS TIME I AM CONCLUDING MY FIRST REVIEW OF THE PLANS |
| | AND WILL LOOK FORWARD TO A SECOND REVIEW OF THE REVISED |
| | AND CORRECTED PLANS. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 561-805-6719 |
| | [email protected] |
| | |