 1ST REVIEW: FBC 2014 MECHANICAL
 PERMIT # 15111020
 THE BRISTOL
 1/28/16
  
 1) PLEASE COMPARE THE DATA FOR THE AC SYSTEMS LISTED IN
 THE SUBMITTED ENERGY CALCULATION FORM 506-2010 WITH THE
 EQUIPMENT SCHEDULES ON SHEETS M6.01 & M6.02 AND THE
 CONDENSER WATER RISERS SHOWN ON SHEETS M5.05 AND M5.06.
 THE CONFLICTS AND INCONSISTENCIES IN UNIT
 IDENTIFICATIONS AND SIZING ARE TOO NUMEROUS TO LIST IN
 THIS REVIEW BUT HERE ARE SOME OF THE MORE APPARENT
 ISSUES A) THE RISERS INDICATE 191 HEAT PUMPS HOWEVER
 THE TOTAL NUMBER OF HEAT PUMPS LISTED IN THE
 CALCULATIONS IS 39. B) THE RISER DRAWING SHOWS HP 135,
 136, AND 215, WHICH APPEAR TO BE DESIGNATED AS OAU- 1,
 2, & 3 IN THE SCHEDULES AND CALCULATIONS, HOWEVER THE
 CAPACITIES SHOWN FOR THESE UNITS IN THE RISERS DO NOT
 MATCH THE CAPACITIES LISTED IN THE SCHEDULES.
 C) THE CALCULATIONS SHOW 1-TON, 1.25-TON, AND 10-TON
 HEAT PUMPS WHICH ARE NOT SHOWN IN THE WSHP EQUIPMENT
 SCHEDULES ON SHEET M-601. D) OAU #2, AND THE 2.5-TON,
 3-TON, AND 5-TON HEAT PUMPS ARE NOT INCLUDED IN THE
 CALCULATIONS. E) THE AREA CALCULATION ON THE FRONT
 COVER OF THE ENERGY FORM INDICATES 412741 SF, HOWEVER
 THE PERMIT APPLICATION INDICATES 319,010 SF. F) THE
 FORM INDICATES A COOLING CAPACITY OF 183657 BTUH FOR A
 1.5 TON UNIT? G) THE EER'S LISTED IN THE CALCULATIONS
 FOR MANY OF THE SYSTEMS DO NOT MATCH THE EER'S LISTED
 IN THE SCHEDULES. H) NO COMPLIANCE DATA IS LISTED FOR
 THE SUPPLY AND RETURN CONDENSER WATER PIPING AND
 INSULATIONS. I) IT APPEARS THAT THERE ARE ALSO MANY
 CONFLICTS BETWEEN THE CONDENSER PIPING RISERS AND THE
 MECHANICAL LAYOUT PLANS PERTAINING TO UNIT
 IDENTIFICATIONS AND WATER PIPING SIZES NOT MATCHING.
 PLEASE CORRECT ALL OF THE PLANS, RISERS AND
 CALCULATIONS SO THEY MATCH AND PROVIDE A COMPLETE,
 ACCURATE ENERGY SUBMITTAL.
  
 2) CALCULATIONS REQUIRED BUT NOT PROVIDED: A) AC
 COOLING AND HEATING SYSTEM SIZING FOR ALL OF THE HEAT
 PUMPS AND DEDICATED OUTSIDE AIR UNITS- SECTION 503.2.1
 FBC-10 ENERGY CONSERVATION. B) MINIMUM VENTILATION
 CALCULATIONS FOR ALL OCCUPIED ROOMS AND SPACES- TABLE
 403.3 FBC-10 MECHANICAL. PROVIDE A TABLE THAT INDICATES
 THE REQUIRED AND PROVIDED CFM'S OF OUTDOOR AIR. C)
 EXHAUST VENTILATION CALCULATIONS FOR THE PARKING
 GARAGES AND PRIVATE GARAGES- REFER TO SECTION 404 AND
 TABLE 403.1. D) EXHAUST VENTILATION CALCULATIONS FOR
 REQUIRED ROOMS AND AREAS INCLUDING THE TRASH STORAGE,
 NAIL SALON, POOL EQUIPMENT ROOMS, GENERATOR AND TANK
 ROOMS, ETC.
  
 3) SMOKE CONTROL AND STAIRWELL/ELEVATOR PRESSURIZATION
 PLANS: THERE APPEARS TO BE SOME CONFLICTS AND MISSING
 INFORMATION BETWEEN THE ARCHITECTURAL AND MECHANICAL
 PLANS AND RISERS, AND THE RATIONAL ANALYSIS FROM SLF
 FIRE PROTECTION ENGINEERS. A) THE CAPACITIES AND
 LOCATIONS OF THE STAIRWAY AND ELEVATOR HOIST-WAY
 PRESSURIZATION FANS AS SHOWN ON THE PLANS AND THE
 EQUIPMENT SCHEDULES DIFFER FROM WHAT IS SPECIFIED IN
 THE SMOKE CONTROL ANALYSIS FROM SLS FIRE PROTECTION
 ENGINEERS. THE ANALYSIS SPECIFIES STAIRS #1-4
 PRESSURIZATIONS OF 10,000 CFM AT THE 25TH LEVEL AND
 5000 CFM'S AND THE 1ST LEVEL, HOWEVER THE RISER DRAWING
 ON SHEET M5.04 INDICATES 15,000 CFM FANS AT THE 26TH
 LEVEL FOR STAIRS #1-3, AND 15,000 CFM'S FOR STAIR #4 AT
 THE GROUND FLOOR PARKING LEVEL. THESE CFM CAPACITIES
 CONFLICT WITH THE FAN SCHEDULE ON SHEET M-602 WHICH
 INDICATES 10,000 CFM INLINE FANS FOR STAIRS #1-4. B)
 THE ANALYSIS SPECIFIES 20,000 CFM PRESSURIZATION FOR
 ELEVATOR HOIST-WAYS #1-4 AT THE 25TH LEVEL, HOWEVER THE
 SCHEDULE LISTS THEM AT 15,000 CFM'S, AND THE RISER
 SHOWS CAPACITIES OF 20,000 CFM'S FOR #1 & 2 AND 30,000
 CFM?S FOR #3 & 4. C) SHEET A3.21 SHOWS ELEVATOR
 HOIST-WAYS #2 & 4 TERMINATING AT THE 24TH LEVEL, BUT
 THE RISER DRAWING SHOWS THEM TERMINATING AT THE 26TH
 LEVEL. D) SHEETS M2.26, M2.27, M5.05, M-602: THE
 FOLLOWING LIST OF PRESSURIZATION AND SMOKE CONTROL FANS
 ARE SHOWN IN THE SCHEDULE AND RISER BUT NOT SHOWN ON
 THE 26TH LEVEL OR ROOF LEVEL MECHANICAL PLANS: SPF-2,
 SPF-3, EPF-2, EPF-4, AND SEF-1. PLEASE SHOW THE
 LOCATIONS OF THE FANS ON THE ROOF PLANS AND PROVIDE
 CLEARANCE DISTANCE MEASUREMENTS FOR ALL INLETS TO
 MECHANICAL AND GRAVITY EXHAUST OUTLETS. REFER TO
 SECTION 708.14.2.1 FBC-10 BUILDING FOR PRESSURIZATION
 INLET MINIMUM CLEARANCE DISTANCES TO EXHAUST OUTLETS.
 E) PLEASE NOTE THAT ALL MANUFACTURER?S SPECIFICATIONS
 FOR MECHANICAL EQUIPMENT AND COMPONENTS OF THE SMOKE
 CONTROL SYSTEM ( FANS, DAMPERS, DUCT AND AREA SMOKE
 DETECTORS, AIR INTAKE AND EXHAUST LOUVERS ETC.) SHALL
 BE REVIEWED AND APPROVED BY THE ENGINEER OF RECORD, AND
 SHALL BE PART OF THE SUBMITTAL PACKAGE- REFER TO
 SECTIONS 909.10 - 909-10.5 FBC-10 BUILDING.
  
 4) PROVIDE AIR DEVICE AND AIR DISTRIBUTION SCHEDULES
 FOR ALL COMPONENTS OF THE HVAC AND SMOKE CONTROL
 SYSTEMS- MANY DEVICE SYMBOLS ARE SHOWN ON THE PLANS
 WITH NO SCHEDULE TO REFERENCE.
  
 5) SHEETS M2.26 & M2.27: THE PLANS INDICATE MANY ROOF
 LEVEL TEF'S AND KEF'S. WHERE ARE THE EQUIPMENT
 SCHEDULES FOR THESE FANS?- I AM NOT SEEING THEM ON
 EITHER M-601 OR M-602.
  
 6) PROVIDE A CONDENSATE DISPOSAL RISER AND ALSO PIPING
 DIAGRAMS FOR EACH LEVEL. INDICATE THE TYPES AND SIZES
 OF THE PIPING, PIPING INSULATIONS AND DISCHARGE
 LOCATIONS. PLEASE NOTE THAT SEC. 90-126 WPB CODE OF
 ORDINANCES PROHIBITS CONDENSATE FROM COOLING COILS TO
 BE DISCHARGED INTO THE SANITARY SEWER SYSTEM.
  
 7) AS NUMEROUS MECHANICAL COMPONENTS SUCH AS LOUVERS
 AND EQUIPMENT STANDS SUBJECT TO WIND LOAD ARE SHOWN IN
 THE PLANS PLEASE NOTE THAT FLORIDA PRODUCT APPROVALS
 AND/OR MIAMI-DADE NOA'S MUST BE SUBMITTED WITH REVIEW
 AND APPROVAL SIGNATURES FROM THE EOR. IF ANY OF THESE
 PRODUCTS ARE TO BE SUBMITTED AFTER PERMITTING, PLEASE
 REVIEW THE FOLLOWING SECTIONS FOR THE WPB AMENDMENTS TO
 THE FBC-10 BUILDING: DEFERRED SUBMITTAL: 107.3.4.2
 DEFERRED SUBMITTALS. FOR THE PURPOSES OF THIS SECTION,
 DEFERRED SUBMITTALS ARE DEFINED AS THOSE PORTIONS OF
 THE DESIGN THAT ARE NOT SUBMITTED AT THE TIME OF THE
 APPLICATION AND THAT ARE TO BE SUBMITTED TO THE
 BUILDING OFFICIAL WITHIN A SPECIFIED PERIOD. DEFERRAL
 OF ANY SUBMITTAL ITEMS SHALL HAVE THE PRIOR APPROVAL OF
 THE BUILDING OFFICIAL. THE REGISTERED DESIGN
 PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST THE
 DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS FOR
 REVIEW BY THE BUILDING OFFICIAL. DOCUMENTS FOR DEFERRED
 SUBMITTAL ITEMS SHALL BE SUBMITTED TO THE REGISTERED
 DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE WHO SHALL
 REVIEW THEM AND FORWARD THEM TO THE BUILDING OFFICIAL
 WITH A NOTATION INDICATING THAT THE DEFERRED SUBMITTAL
 DOCUMENTS HAVE BEEN REVIEWED AND FOUND TO BE IN GENERAL
 CONFORMANCE TO THE DESIGN OF THE BUILDING. THE DEFERRED
 SUBMITTAL ITEMS SHALL NOT BE INSTALLED UNTIL THE
 DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE
 BUILDING OFFICIAL. A)DEFERRED SUBMITTAL. 2010 FBC
 107.3.4.1 PRODUCT APPROVALS. THOSE PRODUCTS WHICH ARE
 REGULATED BY THE DCA RULE 9N-03 SHALL BE REVIEWED AND
 APPROVED IN WRITING BY THE DESIGNER OF RECORD PRIOR TO
 SUBMITTAL FOR JURISDICTIONAL APPROVAL.
  
 8) THE VARIOUS AIR INTAKES AND EXHAUST OUTLETS LOCATED
 ON THE EXTERIOR WALLS OF THE BUILDING MUST BE REVIEWED
 TO MEET COMPLIANCE WITH REQUIRED CLEARANCE DISTANCES AS
 OUTLINED IN SECTION 401.1 AND 501.2.1. PROVIDE CLEAR,
 DIMENSIONED ELEVATION VIEWS OF THE OPENINGS AND NOTES
 IN ORDER TO VERIFY COMPLIANCE.
  
 9) PROVIDE UL TESTED AND APPROVED FIRE-STOPPING
 ASSEMBLIES AND DETAILS FOR ALL DUCTS PENETRATING RATED
 WALLS AND SHAFTS. IF THE DETAILS ARE SHOWN ON A
 ARCHITECTURAL PLAN, PLEASE PROVIDE A NOTE REFERENCING
 THAT PLAN SHEET.
  
 10) PROVIDE A DETAIL FOR A TYPICAL FIRE DAMPER ACCESS
 PANEL, AND SYMBOLS ON THE PLANS TO INDICATE LOCATIONS.
  
 11) SHEET M2.0P1:
 A) THE PLAN SHEET IS LABELED AS BOTH P1 AND P2: PLEASE
 CORRECT.
 B) VERIFY THE AIR INTAKES FOR SPF-4 ARE IN COMPLIANCE
 WITH SECTION 513.10.3. PROVIDE AN ELEVATION VIEW AND
 CLEARANCE DISTANCE MEASUREMENTS.
 C) CLARIFY THE PURPOSES OF THE AIR SUPPLY FANS PGSF-1A
 & 1B AND HOW THEY WERE SIZED. ARE THEY PROVIDING THE
 MAKE-UP AIR FOR THE GARAGE EXHAUST? IF THAT IS THE
 PURPOSE, PLEASE INCLUDE THEM IN THE CONTROL DIAGRAM ON
 SHEET M5.07. PROVIDE AN ELEVATION VIEW AND CLEARANCE
 DISTANCE MEASUREMENTS FOR THE INLETS.
 D) NITROGEN DIOXIDE DETECTORS IN CONJUNCTION WITH
 CARBON MONOXIDE DETECTORS ARE REQUIRED IN THE PARKING
 GARAGE, HOWEVER THE PLAN IS INDICATING ONLY THE CO
 DETECTORS. PLEASE NOTE THAT THE MANUFACTURER'S
 SPECIFICATIONS FOR THE DETECTORS SHALL BE REVIEWED AND
 APPROVED BY THE E.O.R AND BE PART OF THE SUBMITTAL
 PACKAGE. REFER BACK TO COMMENT #2C FOR EXHAUST
 CALCULATION REQUIREMENT.
 E) PROVIDE DUCT CONNECTION, REINFORCEMENT, SEALING, AND
 HANGING DETAILS FOR THE 2HR. FIRE-RATED FLAMEBAR DUCT,
 AND THE OUTSIDE AIR DUCTS IN THE GARAGE. INDICATE THE
 HEIGHTS OF THE DUCTS ABOVE THE FINISHED GARAGE FLOOR.
 PLEASE NOTE MANUFACTURER'S SPECIFICATIONS AND
 INSTALLATIONS FOR THE DUCTWORK MUST BE REVIEWED AND
 APPROVED BY THE E.O.R. AND INCLUDED IN THE SUBMITTAL
 PACKAGE.
 F) PROVIDE SUPPORT AND PROTECTION DETAILS FOR ALL
 EXPOSED PIPING IN THE GARAGE INCLUDING THE CONDENSER
 WATER SUPPLY AND RETURN PIPING, AND THE GENERATOR FUEL
 OIL PIPING. PROVIDE A SUBMITTAL FOR THE PIPE
 INSULATION.
 G) PROVIDE AN ELEVATION VIEW AND CLEARANCE DISTANCE
 MEASUREMENTS FOR THE OUTDOOR AIR INTAKE ON THE NORTH
 SIDE THAT IS SUPPLYING THE CORES- SEE SECTION 401.4.
 H) LABEL THE OUTSIDE AIR INTAKE FOR OAU-3 AND PROVIDE
 CLEARANCE DISTANCE MEASUREMENTS- SECTION 401.4
 I) PROVIDE ELEVATION VIEWS AND CLEARANCE DISTANCE
 MEASUREMENTS FOR THE GARAGE AND TRASH EXHAUST OUTLETS
 ON THE NORTH SIDE- REFER TO SECTION 501.3.1. PLEASE
 INCLUDE THE OUTLETS FOR PGEF-P2-1A & 1B BY THE STAIR #9
 J) SOUTH CORE: LABEL THE SUPPLY AND RETURN CFM'S AT THE
 SUPPLY DIFFUSER AND RETURN GRILLS IN THE FIREMAN'S
 VESTIBULE
 K) SOUTH CORE: PROVIDE AN EXHAUST FAN SCHEDULE FOR
 EF-P2-2.
 L) SOUTH CORE: FIRE AND FIRE/SMOKE DAMPERS MISSING AT
 ALL DUCTS PENETRATING THE EXTERIOR AND INTERIOR
 FIRE-RATED WALLS OF THE CORE.
 M) SOUTH CORE: INDICATE HOW ACCESS FOR SERVICE AND
 REPLACEMENT OF THE HEAT PUMPS ABOVE THE CEILING WILL BE
 PROVIDED. SHOW THE LOCATIONS OF THE PANELS AND
 CONSTRUCTION DETAILS.
 N) NORTH CORE: NO OUTSIDE AIR DUCT CONNECTIONS TO THE
 HEAT PUMPS INSIDE THE CORE ARE SHOWN IN THE DRAWING.
 O) NORTH CORE: THE SUPPLY AND RETURN DIFFUSERS AND
 GRILLS ARE NOT LABELED AND NO CFM'S ARE SHOWN.
 P) NORTH CORE: FIRE DAMPERS MISSING AT MOST OF THE DUCT
 PENETRATING THE EXTERIOR AND INTERIOR FIRE-RATED WALLS
 OF THE CORE.
 Q) NORTH CORE: INDICATE HOW ACCESS FOR SERVICE AND
 REPLACEMENT OF THE HEAT PUMPS ABOVE THE CEILING WILL BE
 PROVIDED. SHOW THE LOCATIONS OF THE PANELS AND
 CONSTRUCTION DETAILS.
 R) MEP ROOM: FIRE DAMPER MISSING FOR THE 28"X12" DUCT
 PENETRATING THE RATED MEP ROOM WALL.
 S) MEP ROOM: OAU-3 IS A WATER-COOLED UNIT PER THE
 SCHEDULE. INDICATE HOW WATER IS BEING SUPPLIED TO THE
 UNIT.
 T) POOL EQUIPMENT ROOM: IDENTIFY AND LABEL ALL
 EQUIPMENT IN THE ROOM AND PROVIDE SCHEDULES FOR EACH.
 PROVIDE EXHAUST VENTILATION CALCULATIONS FOR THE ROOM,
 FAN SCHEDULES FOR PEEF-1 AND PESF-1 (SHOWN ON THE LOBBY
 1 LEVEL), AND SUBMITTALS FOR THE SUPPLY AND EXHAUST
 DUCTWORK AND FANS REVIEWED AND APPROVED BY THE EOR. SEE
 SECTION 304.3.1 FOR REQUIREMENTS FOR FUEL-FIRED
 APPLIANCES IN THE ROOM.
 U) INDOOR DOG RUN: PROVIDE AN EXHAUST VENTILATION
 SYSTEM IN ACCORDANCE WITH TABLE 403.3. INCLUDE
 CALCULATIONS, FAN SCHEDULES, EXHAUST DUCT RUN DETAILS
 AND TERMINATION LOCATIONS, AND HOW MAKE-UP AIR IS TO BE
 PROVIDED.
 V) PROVIDE EQUIPMENT SCHEDULES FOR THE CIRCULATION FANS
 AND INDICATE THE HEIGHT MEASUREMENTS OF THE FANS FROM
 THE FINISH FLOORS TO THE LOWEST EDGE OF THE FAN- SEE
 SECTION 304.6.
  
 12) SHEET M2.0P2:
 A) REFER TO SECTION 301.16 AND PROVIDE EVIDENCE TO
 INDICATE COMPLIANCE FOR MECHANICAL EQUIPMENT LOCATED IN
 A FLOOD HAZARD AREA. SOME OF THE EQUIPMENT INCLUDED ARE
 THE HEAT PUMPS, THE FANS, THE DAMPERS, THE DUCTWORK,
 THE DETECTORS ETC. 301.16 FLOOD HAZARD.
 FOR STRUCTURES LOCATED IN FLOOD HAZARD AREAS,
 MECHANICAL SYSTEMS, EQUIPMENT AND APPLIANCES SHALL BE
 LOCATED AT OR ABOVE THE ELEVATION REQUIRED BY SECTION
 1612 OF THE FLORIDA BUILDING CODE, BUILDING FOR
 UTILITIES AND ATTENDANT EQUIPMENT.
 EXCEPTION: MECHANICAL SYSTEMS, EQUIPMENT AND APPLIANCES
 ARE PERMITTED TO BE LOCATED BELOW THE ELEVATION
 REQUIRED BY SECTION 1612 OF THE OF THE FLORIDA BUILDING
 CODE, BUILDING FOR UTILITIES AND ATTENDANT EQUIPMENT
 PROVIDED THAT THEY ARE DESIGNED AND INSTALLED TO
 PREVENT WATER FROM ENTERING OR ACCUMULATING WITHIN THE
 COMPONENTS AND TO RESIST HYDROSTATIC AND HYDRODYNAMIC
 LOADS AND STRESSES, INCLUDING THE EFFECTS OF BUOYANCY,
 DURING THE OCCURRENCE OF FLOODING UP TO SUCH ELEVATION.
 B) GARAGE EXHAUST SYSTEM: CLARIFY HOW THE GARAGE
 EXHAUST VENT OPENING ON THE NORTH SIDE AND THE EXHAUST
 FANS (PGEF-P2-1A & 1B SHOWN ON M2.0P1) WERE SIZED-
 REFER TO COMMENT #2C. PROVIDE THE DIMENSIONS OF THE
 VENT OPENING AND CONSTRUCTION DETAILS.
 C) CLARIFY HOW MAKE-UP AIR IS BEING SUPPLIED FOR THE
 GARAGE EXHAUST.
 D) PGEF-P1-E AT THE LOADING DOCK IS NOT INCLUDED IN THE
 FAN SCHEDULE ON M-602, AND THE EXACT LOCATION OF THE
 FAN IS NOT CLEAR ON THE PLAN. PLEASE CORRECT AND
 PROVIDE EXHAUST VENTILATION CALCULATIONS.
 E) PROVIDE A MEANS OF VENTILATION FOR THE CORRIDORS
 ADJOINING THE PRIVATE GARAGES IN COMPLIANCE WITH
 SECTION 404.3.
 F) NITROGEN DIOXIDE DETECTORS IN CONJUNCTION WITH
 CARBON MONOXIDE DETECTORS ARE REQUIRED IN THE PARKING
 GARAGE, HOWEVER THE PLAN IS INDICATING ONLY THE CO
 DETECTORS. PLEASE NOTE THAT THE MANUFACTURER?S
 SPECIFICATIONS FOR THE DETECTORS SHALL BE REVIEWED AND
 APPROVED BY THE EOR AND BE PART OF THE SUBMITTAL
 PACKAGE. REFER BACK TO COMMENT #2C FOR EXHAUST
 CALCULATION REQUIREMENT.
 G) PROVIDE EQUIPMENT SCHEDULES FOR THE PRIVATE GARAGE
 INLINE FANS AND THE OTHER INLINE FANS SHOWN THROUGHOUT
 THE SPACE. AS PREVIOUSLY NOTED PROVIDE EXHAUST
 VENTILATION CALCULATIONS FOR THE PRIVATE GARAGES.
 H) PROVIDE FIRE DAMPERS FOR THE VENT LOUVERS SHOWN AT
 THE FPL VAULT AND LOADING DOCK WALLS.
 I) A SERIES OF LOUVERS ARE SHOWN ALONG THE SOUTH EAST
 WALLS OF THE LOADING DOCK. HOW WERE THESE OPENINGS
 SIZED AND ARE THEY BELOW THE FLOOD HEIGHT LEVEL.
 PROVIDE AN ELEVATION VIEW THAT SHOWS REQUIRED CLEARANCE
 DISTANCE MEASUREMENTS FOR AIR INTAKE AND EXHAUST.
 SUBMITTALS FOR THE LOUVERS AND DAMPERS REVIEWED AND
 APPROVED BY THE EOR ARE REQUIRED.
 J) PROVIDE A THROUGH UL PENETRATION FIRE-STOPPING
 ASSEMBLY DETAIL FOR THE O/A EXITING THE SHAFT ABOVE.
 PROVIDE NOTES BY THE SHAFT INDICATING WHERE THE SHAFT
 AND FIRE-STOPPING ASSEMBLY DETAILS CAN BE LOCATED IN
 THE ARCHITECTURAL PAGES.
 K) PROVIDE EQUIPMENT SCHEDULES FOR THE CIRCULATION FANS
 AND INDICATE THE HEIGHT MEASUREMENTS OF THE FANS FROM
 THE FINISH FLOORS TO THE LOWEST EDGE OF THE FAN- SEE
 SECTION 304.6.
 L) PROVIDE DUCT CONNECTION, REINFORCEMENT, SEALING, AND
 HANGING DETAILS FOR THE OUTSIDE AIR AND EXHAUST DUCTS
 IN THE GARAGE. INDICATE THE HEIGHTS OF THE DUCTS ABOVE
 THE FINISHED GARAGE FLOOR. PLEASE NOTE MANUFACTURER'S
 SPECIFICATIONS AND INSTALLATIONS FOR THE DUCTWORK MUST
 BE REVIEWED AND APPROVED BY THE E.O.R. AND INCLUDED IN
 THE SUBMITTAL PACKAGE.
 M) PROVIDE SUPPORT AND PROTECTION DETAILS FOR ALL
 EXPOSED PIPING IN THE GARAGE INCLUDING THE CONDENSER
 WATER SUPPLY AND RETURN PIPING. PROVIDE SUBMITTALS FOR
 ALL PIPE INSULATIONS.
 N) SOUTH CORE, NORTH CORE, AND ADJACENT RESIDENT
 STORAGE ROOMS: THE AC LAYOUT PLANS ARE IN- COMPLETE-
 PROVIDE DUCT SIZES, DIFFUSER AND RETURN GRILL SIZES,
 CFM CAPACITIES AT THE DIFFUSERS AND GRILLS, LOCATIONS
 OF REQUIRED FIRE AND FIRE/SMOKE DAMPERS AT DUCT
 PENETRATIONS, CONDENSER WATER PIPE SIZES ETC.
 O) SOUTH CORE, NORTH CORE: INDICATE HOW ACCESS FOR
 SERVICE AND REPLACEMENT OF THE HEAT PUMPS ABOVE THE
 CEILING WILL BE PROVIDED. SHOW THE LOCATIONS OF THE
 PANELS AND CONSTRUCTION DETAILS.
  
 13) SHEET M2.01:
 A) PROVIDE AN ELEVATION VIEW OF THE GENERATOR EXHAUST
 LOUVER INDICATING REQUIRED CLEARANCE DISTANCE
 MEASUREMENTS PER SECTION 501.2.1.
 B) PROVIDE MANUFACTURER'S SPECIFICATIONS FOR THE
 GENERATOR AND FUEL TANK REVIEWED AND APPROVED BY THE
 EOR, AND INCLUDE IN THE REQUIRED SUBMITTAL PACKAGE.
 PLEASE NOTE THAT IN ACCORDANCE WITH SECTION 909.11
 FBC-10 BUILDING, THE TRANSFER TO FULL STANDBY POWER
 SHALL BE AUTOMATIC AND WITHIN 60 SECONDS OF FAILURE OF
 THE PRIMARY POWER SYSTEMS. PLEASE REVIEW AND PROVIDE
 THIS NOTE IN THE RATIONAL ANALYSIS OF THE SMOKE CONTROL
 SYSTEM.
 C) INDICATE THE REQUIRED CLEARANCE DISTANCES FOR THE
 GENERATOR ROOM EXHAUST (501.2.1), SIZING CALCULATIONS
 FOR THE FANS, AND FAN SCHEDULES.
 D) PROVIDE AN ELEVATION VIEW OF THE GENERATOR ROOM
 COMBUSTION AIR LOUVER INDICATING REQUIRED CLEARANCE
 DISTANCE MEASUREMENTS, AND PROVIDE COMBUSTION AIR
 CALCULATIONS. MANUFACTURER'S SPECIFICATIONS FOR THE
 INTAKE LOUVER SHALL BE REVIEWED AND APPROVED BY THE EOR
 AND INCLUDED IN THE SUBMITTAL PACKAGE WITH A FLORIDA
 PRODUCT APPROVAL OR MIAMI-DADE NOA CERTIFYING WIND
 RESISTANCE AND IMPACT PROTECTION.
 E) PROVIDE ELEVATION VIEWS OF THE TANK ROOM AIR INTAKE
 AND EXHAUST OUTLET WITH CLEARANCE DISTANCE
 MEASUREMENTS. PROVIDE SIZING CALCULATIONS FOR THE
 SYSTEM AS PREVIOUSLY NOTED AND A EQUIPMENT SCHEDULE FOR
 THE FAN. PLEASE NOTE MANUFACTURER'S SPECIFICATIONS FOR
 THE TANK SHALL BE REVIEWED AND APPROVED BY THE EOR AND
 INCLUDED IN THE SUBMITTAL PACKAGE.
 F) PROVIDE ENLARGED FUEL PIPING DIAGRAMS FOR THE
 GENERATOR AND TANK.
 G) INDICATE THE CLEARANCE DISTANCE MEASUREMENTS FOR THE
 TWO O/A INTAKE INLETS ON THE EAST WALL ABOVE THE
 LOADING DOCK- SECTION 401.1.
 H) INDICATE THE CLEARANCE DISTANCE MEASUREMENTS FOR THE
 MANI/PEDI EXHAUST OUTLET ON THE EAST WALL- SECTION
 501.2.1.
 I) APPLY COMMENTS G & H ABOVE FOR THE POOL EQUIPMENT
 ROOM VENTILATION INLET AND OUTLET ON THE SOUTH WALL.
 J) NAIL SALON, REFER TO TABLE 403.3 FOOTNOTES B AND H
 PERTAINING TO THE NAIL SALON: 1) INDICATE HOW THE
 CONTAMINANTS AND ODORS FROM THE NAIL POLISHES ARE BEING
 CAPTURED AT THEIR SOURCES- THE MANICURE AND PEDICURE
 STATIONS. ADDITIONAL DETAILS AND PLAN VIEWS ARE
 REQUIRED. 2) PROVIDE AN EXHAUST FAN EQUIPMENT SCHEDULE.
 3) CLARIFY HOW MAKE-UP AIR FOR THE EXHAUST IS BEING
 PROVIDED AND REFER TO SECTION 403.2.1 (3) RECIRCULATION
 OF THE AIR FROM THE SPACE IS PROHIBITED. HOW WILL THAT
 BE ACCOMPLISHED WITH THE ABOVE CEILING PLENUM? PLEASE
 SHOW THE LOCATIONS OF THE RETURN GRILLS. 3) SHOW THE
 SUPPLY CFM?S AT THE DIFFUSER LOCATIONS, AND REFER TO
 SECTION 606.2.2 FOR REQUIRED SMOKE DETECTOR FOR THE
 COMMON PLENUM.
 K) LAUNDRY ROOM: 1) PROVIDE A FD SYMBOL AT THE 28?X12?
 DUCT PENETRATION INTO THE FIRE-RATED SHAFT. 2) THE
 DRYER EXHAUST MUST BE INDEPENDENT AND NOT CONNECTED
 WITH THE IRONER EXHAUST- SEE SECTION- 504.1. AND
 CORRECT. 3) SUBMIT MANUFACTURER?S SPECIFICATIONS FOR
 THE DRYERS AND IRONER WITH REVIEW AND APPROVAL
 SIGNATURES BY THE EOR- SEE SECTION 504.7 AND SHOW THE
 LOCATION OF THE EXHAUST FANS, AND INCLUDE FAN EQUIPMENT
 SCHEDULES (IF APPLICABLE). 4) PROVIDE EXHAUST DUCT
 DETAILS FOR BOTH THE DRYERS AND IRONER INCLUDING THE
 TYPES AND SIZES OF DUCTS, SUPPORT AND HANGING DETAILS-
 SEE SECTIONS 504.6.2, 504.6.4, 504.6.4.2, AND 504.7. 5)
 PROVIDE PLAN AND ELEVATION VIEWS SHOWING DUCT
 CONNECTIONS TO THE APPLIANCES, AND REQUIRED CLEARANCE
 DISTANCES TO COMBUSTIBLES. 6) PROVIDE FIRE-STOPPING
 DETAILS FOR DUCTS PENETRATING RATED WALLS. 7) PLEASE
 NOTE COMMON DRYER EXHAUST DUCTS SHALL RUN CONTINUOUSLY
 OR BE INTERLOCKED TO RUN TOGETHER.
 L) SOUTH CORE: PROVIDE AN EXHAUST SYSTEM FOR THE TRASH
 ROOM PER TABLE 6-4 ASHRAE 62.1-2010. PLEASE INCLUDE
 CALCULATIONS, EXHAUST FAN SCHEDULE, EXHAUST DUCT
 LAYOUT, TERMINATION LOCATION ETC.
 M) SOUTH CORE: SHOW THE EXHAUST DUCT RUNS AND DUCT
 SIZES AT THE MEN'S AND WOMEN'S TOILET ROOMS.
 N) SOUTH CORE: IDENTIFY THE 3.5 TON UNIT IN THE PACKAGE
 ROOM CLOSET. VERIFY A NON-COMBUSTIBLE DOOR WILL BE
 INSTALLED FOR THE CLOSET AND ALL OTHER MECHANICAL
 CLOSETS IN THE BUILDING- SECTION 603.1. SHOW THE
 LOCATION OF THE PLENUM RETURN GRILL AT THE CLOSET, AND
 THE LOCATIONS OF CEILING RETURN GRILLS IN THE LOBBY
 LOUNGE. PLEASE INCLUDE DIMENSIONS AND CFM CAPACITIES
 FOR EACH GRILL.
 O) SOUTH CORE CORRIDOR: THE AC PLAN IS INCOMPLETE.
 P) NORTH CORE: NO AC OR MEANS OF VENTILATION SHOWN IN
 THE TEL/ELEC ROOM.
 Q) NORTH CORE: CLARIFY IF A HP WILL BE INSTALLED FOR
 THE FIREMAN'S VESTIBULE IN THE SAME MANNER ONE IS SHOWN
 FOR THE SOUTH CORE, AN WHAT EQUIPMENT IS TO BE LOCATED
 IN MECH. CL. 127.
 R) NORTH CORRIDOR, LOUNGE 2, CLUB DINING: SHOW THE
 LOCATIONS OF THE VAV BOXES AND PROVIDE EQUIPMENT
 SCHEDULES. INDICATE HOW ACCESS FOR SERVICE AND
 REPLACEMENT FOR THE BOXES ABOVE THE CEILING WILL BE
 PROVIDED. SHOW THE LOCATION OF THE PLENUM RETURN GRILL
 AT THE MECHANICAL CLOSET FOR THE 17.5 T SYSTEM, AND IN
 THE CEILINGS OF THE CLUB DINING, LOUNGE 2, AND CORRIDOR
 105. PLEASE INCLUDE DIMENSIONS AND CFM CAPACITIES FOR
 EACH GRILL.
 S) GUEST SUITE 1-1 IS ALSO LABELED GUEST SUITE 1-2.
 T) GUEST SUITES 1-1, 2-1, 4, & 4-4: INDICATE HOW
 REQUIRED O/A IS BEING SUPPLIED TO THESE SUITES.
 U) GUEST SUITES AC CLOSETS: INDICATE HOW ACCESS FOR
 SERVICE AND REPLACEMENT OF THE HP-1 UNITS IN THE
 CLOSETS WILL BE PROVIDED- THERE ARE NO DOORS SHOWN AT
 THE CLOSETS. PLEASE PROVIDE ENLARGED PLAN VIEWS OF THE
 CLOSETS INDICATED REQUIRED CLEARANCES, THE MEANS OF
 RETURN AIR, PRIMARY AND SECONDARY AND CONDENSATE
 DISPOSAL, AND CONDENSER WATER PIPING DIAGRAMS.
 V) CLUB DINING AND SERVICE PANTRY: CLARIFY IF ANY
 COOKING APPLIANCES WILL BE INSTALLED AND PROVIDE
 DETAILS. PLEASE NOTE, TYPE I OR TYPE II EXHAUST HOODS
 MAY BE REQUIRED.
  
 14) M2.02:
 A) REFER BACK TO COMMENT #8- REQUIRED CLEARANCE
 DISTANCES FOR O/A INTAKES AND EXHAUST OUTLETS, AND SHOW
 COMPLIANCE.
 B) SOUTH: PROVIDE EQUIPMENT SCHEDULES FOR THE SAUNA AND
 STEAM ROOM EXHAUST FANS AND SIZING CALCULATIONS. PLEASE
 NOTE THE EXHAUST IS NOT SHOWN ACCURATELY PLACED IN THE
 WOMEN'S ROOMS, AND NO MAKE-UP AIR IS BEING PROVIDED FOR
 EITHER THE MEN'S OR WOMEN'S ROOMS.
 C) SOUTH: REQUIRED EXHAUST SYSTEMS FOR THE WOMEN'S
 SHOWER AND MEN'S HANDICAP SHOWER NOT SHOWN ON THE PLAN-
 TABLE 403.3
 D) SOUTH: MECHANICAL CLOSETS ON THE EAST AND WEST SIDES
 OF THE CORE BY THE RESTROOMS ARE SHOWN IN THE
 ARCHITECTURAL PLANS- PLEASE IDENTIFY THE CLOSETS ON
 THIS PLAN AND INDICATE WHAT EQUIPMENT IS CONTAINED IN
 THE CLOSETS.
 E) SOUTH: PLEASE SHOW THE LOCATIONS OF ALL RETURN
 GRILLS AT THE MECH CLOSETS AND AT ALL OF THE CEILINGS
 OF THE ROOMS AND THE SPACES. PROVIDE GRILL DIMENSIONS
 AND CFM CAPACITIES.
 F) ATRIUM: PROVIDE THE DIMENSIONS AND CFM CAPACITY OF
 THE RETURN GRILL FOR HP-L2-5.
 G) ATRIUM: SHOW THE REQUIRED DUCT SMOKE DETECTOR IN THE
 SUPPLY PLENUM OF HP-L2-5.
 H) NORTH CORE: PROVIDE AN EXHAUST SYSTEM FOR THE TRASH
 ROOM PER TABLE 6-4 ASHRAE 62.1-2010.
 I) NORTH CORE: PROVIDE VENTILATION FOR THE STORAGE ROOM
 J) NORTH: PLEASE SHOW THE LOCATIONS OF ALL RETURN
 GRILLS AT THE MECH CLOSETS AND AT ALL OF THE CEILINGS
 OF THE ROOMS AND THE SPACES. PROVIDE GRILL DIMENSIONS
 AND CFM CAPACITIES.
 K) FIRE DAMPERS MISSING FOR THE 26"X12" DUCTS
 PENETRATING THE FIRE-RATED MECHANICAL CLOSET WALLS.
 L) NORTH GUEST SUITES: INDICATE HOW REQUIRED O/A IS
 BEING SUPPLIED TO THESE SUITES. INDICATE HOW ACCESS FOR
 SERVICE AND REPLACEMENT OF THE HP-1 UNITS IN THE
 CLOSETS WILL BE PROVIDED- THERE ARE NO DOORS SHOWN AT
 THE CLOSETS. PLEASE PROVIDE ENLARGED PLAN VIEWS OF THE
 CLOSETS INDICATED REQUIRED CLEARANCES, THE MEANS OF
 RETURN AIR, PRIMARY AND SECONDARY AND CONDENSATE
 DISPOSAL, AND CONDENSER WATER PIPING DIAGRAMS.
 M) PLEASE NOTE THAT SUBJECT TO PLAN REVISIONS BASED ON
 STRUCTURAL REVIEW COMMENTS, ADDITIONAL FIRE AND
 FIRE/SMOKE DAMPERS FOR DUCTS MAY BE REQUIRED ON BOTH
 LOBBY LEVEL-1 AND AMENITY LEVEL-2.
  
 15) M2.03: INCOMPLETE RCP PLANS- THE AC DIFFUSERS AND
 GRILLS IN THE ROOMS ARE NOT LABELED AND NO DIMENSIONS
 ARE SHOWN. PLEASE REFER TO COMMENT #14(L) PRINTED ABOVE
 FOR THE GUEST SUITES ON THIS FLOOR. IDENTIFY ALL HP
 UNITS BEING SERVED BY THE SUPPLY AND RETURN WATER
 PIPING. DUCT LAYOUT PLANS FOR THE NORTH AND SOUTH CORES
 NOT SHOWN
  
 16) M2.05: INCOMPLETE RCP PLANS- THE AC DIFFUSERS AND
 GRILLS ARE NOT LABELED IN THE ROOMS AND NO DIMENSIONS
 ARE SHOWN. IDENTIFY ALL HP UNITS BEING SERVED BY THE
 SUPPLY AND RETURN WATER PIPING TAGS SHOWN. F/S DAMPERS
 MISSING AT THE NORTH CORE AC CLOSET AND AT WEST WALL OF
 THE NORTH CORE BY CORRIDOR.
  
 17) M2.17- M2.22: INCOMPLETE RCP PLANS- THE AC
 DIFFUSERS AND GRILLS ARE NOT LABELED IN THE ROOMS AND
 NO DIMENSIONS ARE SHOWN. IDENTIFY ALL HP UNITS BEING
 SERVED BY THE SUPPLY AND RETURN WATER PIPING TAGS
 SHOWN. F/S DAMPERS MISSING AT NORTH AND SOUTH CORES ON
 M2.17- PLEASE CHECK ALL CORES ON ALL PLANS FOR MISSING
 DAMPERS.
  
 18) M2.23: INCOMPLETE RCP PLANS- THE AC DIFFUSERS AND
 GRILLS ARE NOT LABELED IN THE ROOMS AND NO DIMENSIONS
 ARE SHOWN. IDENTIFY ALL HP UNITS BEING SERVED BY THE
 SUPPLY AND RETURN WATER PIPING TAGS SHOWN. THERE IS NO
 FLOOR PLAN LAYOUT FOR THE SOUTH SIDE SHOWING ROOMS AND
 SPACES.
  
 19) M2.25 & M2.25: INCOMPLETE RCP PLANS- THE AC
 DIFFUSERS AND GRILLS ARE NOT LABELED IN THE ROOMS AND
 NO DIMENSIONS ARE SHOWN. IDENTIFY ALL HP UNITS BEING
 SERVED BY THE SUPPLY AND RETURN WATER PIPING TAGS
 SHOWN.
  
 20) M2.26 & M2.27
 A) PROVIDE COMBUSTION AIR CALCULATIONS FOR THE BOILERS
 AND INDICATE HOW THE AIR IS BEING PROVIDED- SEE SECTION
 304 FBC-10 FUEL GAS.
 B) PROVIDE ENLARGED PLAN AND ELEVATION VIEWS OF THE
 BOILERS AND HEAT EXCHANGERS INDICATING REQUIRED WORKING
 CLEARANCES AND ID TAGS FOR ALL PARTS AND COMPONENTS.
 C) PROVIDE BOILER VENTING PLANS AND DETAILS- INCLUDING
 THE TYPES AND SIZES OF VENTS, LENGTH OF THE VENT RUNS,
 AND TERMINATION LOCATIONS.
 D) PROVIDE EOR REVIEWED AND APPROVED MANUFACTURER'S
 SPECS AND SHOP DRAWINGS FOR ALL MECHANICAL EQUIPMENT ON
 THE 26TH AND ROOF LEVELS INCLUDING THE BOILERS, HEAT
 EXHANGERS, COOLING TOWERS, AND PUMPS. ALL EQUIPMENT
 SHALL BE INCLUDED IN THE SUBMITTAL PACKAGE.
 E) PROVIDE ENLARGED VIEWS OF THE COOLING TOWERS AND OAU
 1 & 2 SHOWING THE REQUIRED CLEARANCE DISTANCES FROM THE
 FINISHED ROOF SURFACE TO THE BOTTOM OF THE UNITS.
 F) REFER TO SECTION 301.12 AND PROVIDE WIND LOAD
 ENGINEERING FOR TIE-DOWN OF ALL MECHANICAL EQUIPMENT
 AND COMPONENTS EXPOSED TO WIND ON THE 26TH LEVEL AND
 ROOF LEVELS OF THE BUILDING INCLUDING THE COOLING
 TOWERS, OAU-1 & 2, THE PRESSURIZATIONS FANS, THE
 EXHAUST FANS, THE SUPPLY AND EXHAUST DUCTWORK, PIPE AND
 DUCT STANDS ETC. IF THESE DETAILS ARE PROVIDED ON THE
 STRUCTURAL AND ARCHITECTURAL PLANS, PLEASE PROVIDE
 NOTES INDICATING THE PLAN SHEETS.
 G) PLEASE NOTE GUARDS AND PERMANENT LADDERS MAY BE
 REQUIRED FOR SOME OF THE EQUIPMENT- REFER TO SECTIONS
 304.11 AND 306.5.
  
 21) BASED ON THE PREVIOUS COMMENTS I HAVE PERFORMED
 ONLY A CURSORY REVIEW OF THE RESIDENTIAL SUITE PLANS.
 IT APPEARS THAT MANY OF THE ISSUES FOUND IN THE
 REVIEWED PLANS ARE OCCURRING IN THOSE PLANS ALSO. AT
 THIS TIME I AM CONCLUDING MY FIRST REVIEW OF THE PLANS
 AND WILL LOOK FORWARD TO A SECOND REVIEW OF THE REVISED
 AND CORRECTED PLANS.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 561-805-6719
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved