| Plan Review Notes For Permit 15111015 |
| Permit Number |
15111015 |
|
| Review Stop |
ENG |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2015-12-23 13:26:02 | SPOKE WITH ROBERT BROWN, BUILDING OFFICIAL, AND KELLY | | | CRANFORD, ENGINEERING PLAN REVIEWER, AND BASED ON THE | | | CONVERSATIONS AND NOTES, A "NOT REQUIRED" RESULT IS | | | ADDED TO THE ENGINEERING STOP AT THIS TIME. THIS WILL | | | BE CONSIDERED PHASE 1 OF THE PROCESS AND INCLUDE ONLY | | | THE SUPERINTENDENTS TRAILER AND INSTALLATION OF SAME. | | | NO ELECTRIC OR WATER IS BEING CONSIDERED AT THIS TIME. | | | SEPARATE PERMITS FOR ELECTRIC AND WATER, WITH COMPLIANT | | | DRAWINGS ARE REQUIRED FOR THOSE PORTIONS OF THE WORK | | | AND WILL BE SUBMITTED IN THE ANTICIPATED NEAR FUTURE. |
|