| Plan Review Notes For Permit 15111015 |
| Permit Number |
15111015 |
|
| Review Stop |
ENG |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2015-12-17 13:34:17 | ONCE THE PROPOSED POTABLE WATER SERVICE LINE IS NO | | | LONGER UTILIZED, THE LINE IS TO BE REMOVED BACK TO THE | | | MAIN. (SECTION 2.23 OF THE CITY RIGHT OF WAY | | | CONSTRUCTION STANDARDS MANUAL) | | | | | | PLEASE UPDATE THE DETAIL SHEETS TO UTILIZE THE MOST | | | RECENT VERSION OF THE CITY OF WEST PALM BEACH DETAILS. | | | DETAILS MAY BE DOWNLOADED AT | | | HTTP://WPB.ORG/ENGINEERING/FORMS-AND-PUBLICATIONS/ . | | | PAVEMENT RESTORATION WITHIN THE HAVERHILL RIGHT-OF-WAY | | | MUST COMPLY WITH PALM BEACH COUNTY STANDARDS. | | | | | | PLEASE SUBMIT A LEGIBLE COPY OF THE SITE PLAN, SHEET | | | SP-1. | | | | | | AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION WILL BE | | | REQUIRED FROM THE ENGINEERING DIVISION OF THE PUBLIC | | | WORKS DEPARTMENT. THE ENGINEERING DEVELOPMENT APPROVAL | | | APPLICATION FORMS CAN BE DOWNLOADED AT | | | HTTP://WPB.ORG/ENGINEERING/FORMS-AND-PUBLICATIONS/ | | | | | | KELLY CRANFORD, P.E. | | | CAPITAL IMPROVEMENT PLAN MANAGER | | | [email protected] | | | 561-494-1098 (OFFICE) | | | |
|