| 2015-12-07 14:09:36 | 1) SHT. A-5 - DETAILS #1 & #2 - THE HEIGHT OF THE |
| | ACCESSIBLE WATER CLOSET SHALL BE 17"-19" AFF MEASURED |
| | TO THE TOP OF THE SEAT PER 2014 FBC-ACCESS. SEC.604.4. |
| | 2) SHT. A-5 - THE TOILET PAPER DISPENSER SHALL BE |
| | LOCATED 7"-9" IN FRONT OF THE WATER CLOSET MEASURED TO |
| | THE CENTERLINE OF THE DISPENSER. 2014 FBC-ACCESS. |
| | SEC.604.7. |
| | 3) SHT. A-5- DETAILS #1 & #2 - THE GRAB BARS SHALL BE |
| | MEASURED TO THE TOP OF THE GRIPPING SURFACE PER THE |
| | 2014 FBC-ACCESS. SEC. 609.4. |
| | 4) SHT. M-1-NOTE #5 NOTES THE CONDENSATE TO DISCHARGE |
| | TO THE SANITARY. CITY ORDINANCE SEC. 90-126 ( B) (5). |
| | 5) SUBMIT MANUF. SPECIFICATIONS/INSTALL MANUAL AND A |
| | DETAIL ON THE ZURN GREASE TRAP.WPB AMEND. TO FBC |
| | SEC.107.2.1. |
| | 6) THE WATER FILTER SYSTEM SHALL BE PROTECTED AGAINST |
| | CONTAMINATION IN ACCORDANCE WITH 2014 FBC- PLUMBING |
| | SEC.608.3. |
| | 7) THE WATER SUPPLY CONNECTION TO BEVERAGE DISPENSERS, |
| | COFFEE MACHINES AND NONCARBONATED BEVERAGE DISPENSERS |
| | SHALL BE PROTECTED AGAINST BACKFLOW BY A BACKFLOW |
| | PREVENTER CONFORMING TO ASSE 1022 PER 2014 FBC-PLUMBING |
| | SEC.608.16.1, 608.16.10. |
| | 8) SUBMIT A DETAIL OF THE CO2 FILL BOX. WPB AMEND. TO |
| | FBC SEC. 107.2.1. |
| | 9) A SAMPLING PORT SHALL BE INSTALLED ON THE EFFFLUENT |
| | LINE OF THE GREASE TRAP ON THE EXTERIOR OF THE BUILDING |
| | IN ACCORDANCE WITH CITY OF WPB ENGINEERING STANDARD |
| | DRAWING GS-7.1. I HAVE PLACED A LINK AT THE END OF THE |
| | REVIEW COMMENTS. |
| | 10) SHT. P-3 - DOMESTIC WATER RISER SHOWS A 1/2" WATER |
| | LINE INCREASING TO 3/4" AT THE WATER HEATER. THE |
| | MINIMUM SIZE WATER SUPPLY TO THE WATER HEATER SHALL BE |
| | 3/4". |
| | 11) SHOW THE PIPE SIZE OF THE NEW CONNECTION OF THE |
| | WATER MAIN TO THE EXISTING ON THE WATER RISER.WPB |
| | AMEND. TO FBC SEC. 107.2.1. |
| | 12) SHT.P-3-DETAIL "A" - THE WATER RISER SHOWS A 1/2" |
| | COLD WATER LINE SUPPLYING 1" LINES TO THE WATER CLOSETS |
| | IN THE RESTROOMS & SUPPLYING 3/4/" LINES TO OTHER |
| | FIXTURES. CLARIFY. |
| | 13) THE SANITARY RISER SHOWS 2 FLAT DRY VENTS FOR THE |
| | GREASE INTERCEPTOR. EVERY DRY VENT CONNECTING TO A |
| | HORIZONTAL DRAIN SHALL CONNECT ABOVE THE CENTERLINE OF |
| | THE HORIZONTAL DRAIN PIPE PER THE 2014 FBC-PLUMBING |
| | SEC.905.3. |
| | 14) THE SANITARY RISER DIAGRAM SHOWS ALL THE FIXTURES |
| | AS BEING CONNECTED TO THE HORIZONTAL DRAINS BELOW THE |
| | SLAB. SHOW THE FIXTURES ON THE SANITARY RISER AS THEY |
| | WILL BE INSTALLED ( WALL MOUNTED WATER CLOSETS, |
| | LAVATORIES CONNECTED TO STACKS, ETC.) WPB AMEND. TO FBC |
| | SEC. 107.3.5.1.3. |
| | 15) CLEANOUTS ARE REQUIRED IN THE BASE OF EACH WASTE OR |
| | SOIL STACK PER FBC-PLBG. SEC.708.3.4. |
| | 16) SIZE ALL VENTS & SECTIONS OF THE VENT SYSTEM ON THE |
| | SANITARY RISER. SEE VENT FOR RESTROOMS AND HANDSINK.WPB |
| | AMEND. TO FBC SEC. 107.2.1. |
| | 17) SIZE ALL SECTIONS OF THE UNDERSLAB PIPING AND THE |
| | HORIZONTAL DRAIN FOR THE RESTROOMS. WPB AMEND. TO FBC |
| | SEC. 107.2.1. |
| | 18) SHOW THE 3/4" VENT FOR THE FLOW CONTROL FOR THE |
| | GREASE TRAP AS NOTED ON SHT. P-1, NOTE #17. |
| | |
| | GREASE TRAP DETAIL LINK: HTTP://WPB.ORG/ENGINEERING/WP- |
| | CONTENT/UPLOADS/SITES/7/2012/05/GS-7-AND-7_1.PDF |
| | |
| | |
| | PLUMBING PLAN REVIEW |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | 561-805-6692 |
| | [email protected] |
| | |
| | |
| | |
| | |