Plan Review Notes
Plan Review Notes For Permit 15110968
Permit Number 15110968
Review Stop G
Sequence Number 1
Notes
Date Text
2015-11-25 05:39:501) SHT. P-1 - IF THE LOCATION OF THE METER HAS BEEN
 CHANGED, SHOW THE NEW DISTANCE FOR THE PE PIPE FROM THE
 METER TO THE THE FIRST STEP DOWN REGULATOR.ENSURE PIPE
 SIZE IS ADEQUATE FOR THE LOAD. WPB AMEND. TO FBC SEC.
 107.2.1.
 2) SHOW THE TYPE OF PIPE, SIZE, PSI OF THE GAS AND THE
 LENGTH OF ALL PIPE SECTIONS FOR THE UNDERGROUND PE
 PIPEFROM THE GAS METER TO THE FIRST STEP DOWN
 REGULATOR. THIS INFO CAN BE FOUND ON THE ORIGINAL GAS
 PLAN.
 3) SHOW THE BTU LOAD AND SIZE THE GAS LINE FOR THE
 FUTURE STANDBY GENERATOR. THE BTU LOAD SHALL CORRELATE
 WITH THE BTU LOAD ON P-1.
 4) THE BTU LOAD FOR THE EMERGENCY GENERATOR ON SHT. P-2
 SHOWS 860 CFH AND SHT. P-1 SHOWS 1,353 CFH.
 CLARIFY.ENSURE THE PIPE IS SIZED FOR THE MAXIMUM BTU
 LOAD BASED ON THE TOTAL DEVELOPED LENGTH FROM THE POINT
 OF DELIVERY.
 5) SIZE ALL PIPE SECTIONS FROM THE GAS METER UP TO
 WHERE THE GAS PIPING PENETRATES THE EXTERIOR WALL OF
 THE STRUCTURE. ALSO, SIZE ALL PIPE SECTIONS AND
 INDICATE TYPE OF PIPE AND PSI OF THE GAS TO THE FUTURE
 STANDBY GENERATOR. SHOW THE LOCATION OF ALL REGULATORS.
 6) SHT. C09 - CLEARLY SHOW THE LOCATION OF THE GAS
 METER. THE PLAN SHOWS "PROPOSED 1 1/2 POLY GAS
 SERVICE". THIS IS VAGUE.
  
 PLUMBING PLAN REVIEW
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 561-805-6692
 [email protected]
  
  
  
  