| Plan Review Notes For Permit 15110823 |
| Permit Number |
15110823 |
|
| Review Stop |
M |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2015-12-16 14:45:08 | 1ST REVIEW 2014 MECHANICAL | | | PERMIT 15110823 | | | 12/16/15 | | | | | | 1) PLEASE ADJUST THE VALUE ON THE PERMIT APPLICATION TO | | | INCLUDE THE COST OF THE PROJECT BASED ON LABOR, | | | MATERIALS, EQUIPMENT, DESIGN FEES, OVERHEAD AND PROFIT | | | ETC.- REFER TO SECTION 109.3 WPB AMENDMENTS TO THE | | | FBC-14. | | | 2) SHEET S1.4: PROVIDE STRUCTURAL DETAILS FOR | | | CONSTRUCTION OF THE COOLING TOWER STEEL SUPPORT BASE, | | | AND ATTACHMENT OF TOWER TO THE SUPPORT BEAMS- SECTION | | | 301.15 FBC-14 MECHANICAL. | | | 3 )M1.0: PROVIDE ENGINEERED DETAILS FOR SUPPORT AND | | | TIE-DOWN OF THE ABOVE GROUND CHILLER WATER SUPPLY AND | | | RETURN PIPINGS. | | | 4) M1.0: INDICATE THE TYPE, THICKNESS, AND R-VALUE OF | | | THE ABOVEGROUND CHILLED WATER PIPING INSULATION. | | | 5) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE COOLING | | | TOWER REVIEWED AND APPROVED BY THE ENGINEER OF RECORD | | | | | | CHRISTOPHER L. COLE | | | MECHANICAL PLANS EXAMINER | | | 561-805-6719 | | | [email protected] | | | | | | | | | |
|