| 2015-12-16 10:24:48 | 1ST REVIEW 2014 MECHANICAL |
| | PERMIT #15110794 |
| | 12/16/15 |
| | |
| | 1) ADVIORY: UNDERGROUND FUEL TANKS AND DELIVERY SYSTEMS |
| | EXCEEDING 550 GALLONS MUST BE APPROVED BY THE PALM |
| | BEACH COUNTY DEPARTMENT OF ENVIRONEMNETAL RESOURCE |
| | MANAGEMENT. PROVIDE DOCUMENTATION OF APPROVAL FOR THE |
| | 8000 GALLON DIESEL FUEL TANK INSTALLATION. |
| | 2) PROVIDE A SOIL REPORT FROM A FL. LICENSED ENGINEER |
| | FOR INSTALLATION OF THE UNDERGROUND TANK AND NEW |
| | GENERATOR BUILDING- SEE SECTION 1803 FBC-14 BUILDING. |
| | 3) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE |
| | GENERATOR, FUEL TANK, FUEL PIPING, AND THE GENERATOR |
| | EXHAUST FAN APPROVED BY THE ENGINEER OF RECORD. |
| | 4) PROVIDE ON THE PLANS THE WIND LOAD DESIGN CRITERIA |
| | AS OUTLINED IN SECTION 1609 FBC-14 BUILDING.WIND DESIGN |
| | CRITERIA 2010 FBC-B 1609.1.1 DETERMINATION OF WIND |
| | DESIGN- CHAPTER 6 OF ASCE 7-10. |
| | SECTION 1609.3 BASIC WIND SPEED FIGURE 1609.A-C. |
| | SECTION 1609.3 WIND SPEED CONVERSION |
| | A) THE BASIC WIND SPEED, VU, SHALL BE DETERMINED IN |
| | ACCORDANCE WITH 1609.3.1 & ASCE 7-10 |
| | B) AN IMPORTANCE FACTOR, FIGURE 1609 A-C, ASCE 7-10. |
| | C) AN EXPOSURE CATEGORY SHALL BE DETERMINED IN |
| | ACCORDANCE WITH 1609.4 & ASCE 7-10 |
| | D) A HEIGHT AND EXPOSURE ADJUSTMENT COEFFICIENT, * |
| | SHALL BE DETERMINED FROM TABLE 1609.7.2. ASCE 7-10. |
| | E) COMPONENTS & CLADDING PRESSURES POSITIVE & NEGATIVE |
| | TABLE 1609.2(2). |
| | F) COMPONENTS AND CLADDING/ 2010 FBC-B 1609.1.2 |
| | PROTECTION OF OPENINGS, 1609.6.4.4.1 COMPONENTS & |
| | CLADDING |
| | FLORIDA DEPARTMENT OF COMMUNITY AFFAIRS RULE 9N-3 NOV. |
| | 01/ 2010 (31) SUB-CATEGORY OF PRODUCTS OR CONSTRUCTION |
| | SYSTEMS THAT WILL REQUIRE PRODUCT APPROVALS FOR THE |
| | MECHANICAL SYSTEMS: THE INTAKE AND EXHAUST LOUVERS, AND |
| | ROOF MOUNTED EXHAUST FAN. PLEASE NOTE SITE SPECIFIC |
| | ENGINEERING IS REQUIRED FOR ATTACHMENT OF ALL EXTERIOR |
| | EQUIPMENT AND APPLIANCES- PROVIDE ATTACHMENT DETAILS. |
| | 5) INDICATE WHICH CODE OR STANDARD WAS USED TO |
| | CALCULATE AND DESIGN THE EXHAUST SYSTEM FOR THE |
| | GENERATOR BUILDING AND SHOW THE VENTILATION |
| | CALCULATION. |
| | 6) PROVIDE A SECTION VIEW OF THE EXHAUST DUCT FROM THE |
| | OUTLET OF THE GENERATOR TO THE TERMINATION CAP ON THE |
| | ROOF- INDICATE THE TYPE OF DUCT WORK AND HOW THE DUCT |
| | WILL BE GUARDED WHERE IT PENETRATES THE COMBUSTIBLE |
| | ROOF PLYWOOD- REFER TO SECTION 8.3.3 NFPA-37. |
| | 7) PROVIDE A SEQUENCE OF OPERATION FOR THE |
| | THERMOSTATICALLY CONTROLLED EXHAUST FAN- SEE SHEET |
| | M101. |
| | 8) REFER TO SECTION 501.3.1 ITEM #1 AND VERIFY |
| | COMPLIANCE FOR THE GENERATOR EXHAUST TERMINATION. |
| | 9) PLEASE ADJUST THE VALUE ON THE PERMIT APPLICATION TO |
| | INCLUDE THE COST OF THE PROJECT BASED ON LABOR, |
| | MATERIALS, EQUIPMENT, DESIGN FEES, OVERHEAD AND PROFIT |
| | ETC.- REFER TO SECTION 109.3 WPB AMENDMENTS TO THE |
| | FBC-14. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 561-805-6719 |
| | [email protected] |
| | |
| | |
| | |