2016-01-23 09:20:011) SHOW TYPE OF PIPING MATERIAL BEING INSTALLED. THERE
 ARE TWO TABLES REFERENCED BUT ONLY ONE TYPE OF PIPE IS
 SHOWN ON THE RISER. IF PE PIPE IS BEING INSTALLED IT
 CAN ONLY BE USED OUTSIDE UNDERGROUND. WPB AMENDMENTS TO
 FBC SEC. 107.2.1.
 2) INDICATE THE PSI OF THE SYSTEM. WPB AMENDMENTS TO
 FBC SEC. 107.2.1.
 3) SHOW THE LOCATION OF ALL STEP DOWN REGULATORS ON THE
 SYSTEM IF APPLICABLE.
 4.) TABLE 402.2 (20) IS REFERENCED ON THE PLANS. THERE
 IS NO SUCH TABLE IN THE GAS CODE.CLARIFY.
 5) SUBMIT MANUFACTURER'S SPECIFICATION SHEETS FOR ALL
 GAS EQUIPMENT TO VERIFY COMPLIANCE WITH STANDARDS NFPA
 54, NFPA 58, AND FBC-2014 FUEL GAS SEC. 402.2, AND
 301.3. GAS APPLIANCES SHALL BE LISTED AND LABELED PER
 SEC.301.3. 2014 FBC-RES. SEC.G2404.3.
 6) SIZE ALL SECTIONS OF THE GAS RISER DIAGRAM. WPB
 AMENDMENTS TO FBC SEC. 107.2.1.
 7) THE GAS RISER REFERS TO 170 FT. BEING USED FOR
 SIZING. THERE IS NO 170 FT.ROW. 175 FT. SHALL BE USED.
 8) IF THIS SYSTEM IS GOING TO BE ENTIRELY OF GALVANIZED
 PIPE IT IS UNDERSIZED. REFER TO 2014 FBCFG, TABLE
 402.4(2), NOT 402.4.2 (2) AS REFERENCED ON THE PLANS.
 9) SHT. P102 - THE TANKLESSS WATER HEATER SYSTEM SHOWS
 TWO TANKLESS WATER HEATERS AND THE GAS RISER ONLY SHOWS
 ONE.CLARIFY.THIS WILL ALSO AFFECT THE SYSTEM BTU LOAD
 AND THE PIPE SIZING.
  
 A SEPARATE IS REQUIRED FOR THE GAS.
  
 PLUMBING PLAN REVIEW
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 561-805-6692
 [email protected]
  
  
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved