| 2015-11-30 13:26:15 | CORRECT ELECTRICAL CODE REFERENCE IS 2011, NOT 2008. | | | ALL DEVICES NOTED IN NOTE 7 ARE TO BE LABELED FOR THE | | | LOCATION AS WELL. | | | 120V WATER HEATER FEED IN NOTE 8 DOES NOT APPEAR ON THE | | | PAQNEL SCHEDULE. | | | NOTE 16 DOES NOT INDICATETHE EQUIPMENT IT IS | | | REFERENCING TO BE CONNECTED. | | | NO ENERGY CODE COMPLIANCE FOR FBC-ENERGY APPEARS TO BE | | | CONNECTED. | | | NO REFERENCE IS MADE TO INDICATE COMPLIANCE WITH THE | | | ELECTRICAL REQUIREMENTS OF THE FBC-ENERGY. | | | CEILING FANS APPEAR TO BE EXISTING, HOWEVER, NO LOAD OR | | | CIRCUITIS INDICATED. | | | ARE GFCI RECEPTACLES PROPOSED AT THE BATHROOM BASINS? | | | NONE APPEAR TO BE INDICATED. | | | NOTES INDICATE AIR CONDITIONING/MECHANICAL WORK. NONE | | | IS SHOWN |
|