| Plan Review Notes For Permit 15110523 |
| Permit Number |
15110523 |
|
| Review Stop |
P |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2015-11-29 07:46:48 | 1) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE | | | TANKLESS WATER HEATER. WPB AMEND. TO SEC.107.2.1. | | | 2) THE WATER SHUTOFF VALVES FOR THE WASHING MACHINE | | | SHALL NOT BE LOCATED BEHIND THE W/D STACK MODEL UNLESS | | | THERE IS AN ACCESS PANEL ON THE W/D UNIT FOR THE | | | VALVES. SUBMIT MANUF.SPECIFICATIONS FOR THE | | | WASHER/DRYER UNIT.2014 FBC-RESIDENTIAL SEC. P2903.9.3. | | | 3) SHT. B-P-1 - NOTES- NOTE #3 STATES THAT THE HOT | | | WATER HEATER TO BE SIZED PER TABLE 46-N-8.WHAT | | | STANDARD/CODE IS THIS TABLE FROM? I COULDN'T FIND IT | | | IMY CODE BOOKS. CLARIFY. | | | 4) SUBMIT A SANITARY AND WATER RISER DIAGRAM FOR | | | REVIEW. WPB AMEND. TO FBC SEC. 107.3.5.3 (11). | | | 5) THE PLUMBING PLANS REFER TO SHEET SP-1 FOR | | | CONTINUATION OF THE WATER SERVICE. SHT. SP-1 IS NOT | | | PART OF THIS SET. SUBMIT SHT. SP-1 FOR REVIEW. | | | | | | PLUMBING PLAN REVIEW | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | 561-805-6692 | | | [email protected] | | | |
|