| 2016-01-13 18:05:56 | PLAN |
| | REVIEW COMMENTS |
| | |
| | 1ST REVIEW: FBC FIFTH EDITION (2014) |
| | ROBERT MCDOUGAL, CBO |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | (561) 805-6714 |
| | [email protected] |
| | |
| | DENIED BY BUILDING |
| | PLEASE ADDRESS THE ITEMS NOTED BELOW: |
| | |
| | 1) THE PLANS HAVE SEVERAL REFERENCES TO THE 2010 FBC. |
| | THE FBC FIFTH EDITION (2014) WENT INTO EFFECT ON JUNE |
| | 30, 2015. ALL NEW PERMITS APPLIED FOR ON OR AFTER THAT |
| | DATE ARE REQUIRED TO COMPLY WITH AND REFERENCE THE FBC |
| | FIFTH EDITION. CHECK CODE SECTIONS AND THE EDITION OF |
| | THE CODE THAT IS CITED IN THE PLANS. I CLOUDED MOST OF |
| | THEM IN RED ON THE PLANS. |
| | |
| | 2) THE EMERGENCY MEANS OF ESCAPE NOTE AT THE ENTRY DOOR |
| | IS INCORRECT. THE DOOR IS REQUIRED TO BE IMPACT |
| | RESISTANT AND IMPACT PROTECTION DEVICES CAN NOT BE USED |
| | PER FBCR 310.4. |
| | |
| | 3) THE CODE SECTION FOR UNDER STAIR PROTECTION IS |
| | R302.7 IN THE 2014 FBCR AND NOT R311.2.2 |
| | |
| | 4) THE ROOF COVERING NOTES ON C2 AND C3 REFERENCE THE |
| | 2010 FBC. |
| | |
| | 5) THE GENERAL NOTES TYPICAL TO UNITS A, B AND C |
| | REFERENCE THE 2010 FBC AND WRONG CODE SECTIONS IN |
| | SEVERAL PLACES. |
| | |
| | 6) THE FLAME SPRED AND SMOKE DEVELOPED NOTE #19 IS |
| | INCORRECT. INSULATION MATERIALS SHALL HAVE A FLAME |
| | SPRED INDEX NOT TO EXCEED 25 PER FBCR 302.10.1. SEE FBC |
| | R302.9.1 AND R302.9.2 FOR FLAME SPREAD AND SMOKE |
| | DEVELOPED REQUIREMENTS FOR WALL AND CEILING FINISHES. |
| | |
| | 7) THERE IS A DETAIL FOR A SHADOW BOX WOOD FENCE (WING |
| | WALL) IN THE DOCUMENTS THAT NEEDS TO BE REMOVED. A |
| | SEPARATE PERMIT, APPLICATION AND DRAWINGS ARE REQUIRED |
| | FOR FENCES. THE DETAIL DOES NOT SPECIFY THE HEIGHT AND |
| | DOES NOT PROVIDE AND STRUCTURAL DETAILS. FBC 107.2.1 |
| | |
| | 8) THE -50 PSF DESIGN PRESSURE IN PRODUCT APPROVAL |
| | FL15037.3 FOR THE ENTRY DOOR IS NOT ADEQUATE. THE PLANS |
| | SPECIFY A REQUIRED NEGATIVE PRESSURE OF -55.08 PSF FOR |
| | THE DOOR. FBC R301.1 |
| | |
| | 9) THE ANCHOR SPACING COLUMN ON THE STORM PANEL |
| | INSTALLATION SCHEDULE FOR 1441-A END UNIT IS BLANK. THE |
| | ANCHOR SPACINGS ARE MISSING. FBC 107.2.1 |
| | |
| | 10) THE STORM PANEL INSTALLATION SCHEDULES FOR END |
| | UNITS A AND B ARE MISSING THE WINDOWS ON THE ENDS. FBC |
| | 107.2.1 |
| | |
| | 11) SUBMIT TWO COPIES OF A KEY PLAN THAT CORRESPONDS |
| | WITH THE STORM PANEL INSTALLATION SCHEDULE TO SHOW THE |
| | LOCATIONS OF THE OPENINGS. FBC 107.2.1 |
| | |
| | 12) SOME OF THE PLAN SHEETS AND DOCUMENTS ARE NOT |
| | SIGNED AND SEALED. VERIFY THAT ALL REQUIRED SUBMITTALS |
| | ARE SIGNED AND SEALED. FS 471 AND 481 |
| | |
| | 13) IN ORDER TO REDUCE PLAN REVIEW TIME, PLEASE SUBMIT |
| | A RESPONSE LETTER INDICATING HOW EACH OF THE REVIEW |