Date Text
2015-11-25 14:21:121) MEN'S AND WOMEN'S RESTROOMS - 2014 FBC-
 ACCESSIBILITY SEC. 213.3.4 - WHERE LAVATORIES ARE
 PROVIDED, AT LEAST ONE SHALL COMPLY WITH SEC. 606 OF
 THE 2014 FBC- ACCESSIBILITY AND SHALL NOT BE LOCATED IN
 A TOILET COMPARTMENT. PROVISIONS SHALL BE PROVIDED FOR
 A FORWARD APPROACH TO THE LAVATORY. (SEC. 606.2)
 2) SHT. A7.1 - GRAB BARS SHALL BE MEASURED TO THE TOP
 OF THE GRIPPING SURFACE FROM THE FINISH FLOOR, NOT TO
 THE CENTER AS SHOWN ON THE ELEVATION DETAILS. 2014
 FBC-ACCESSIBILITY SEC. 609.4.
 3) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR ALL GAS
 EQUIPMENT. GAS EQUIPMENT SHALL BE LISTED AND LABELED
 PER THE 2014 FBC-FUEL GAS SEC. 301.3.
 4) SUBMIT GREASE INTERCEPTOR SIZING CALCULATIONS TO
 ENSURE THAT THE EXISTING INTERCEPTORS HAVE ADEQUATE
 CAPACITY FOR THE NEW RESTAURANT.SUBMIT THE CAPACITY AND
 NUMBER OF THE EXISTING INTERCEPTORS. WPB AMEND. TO FBC
 SEC. 107.2.1.
 5) SHT. P0.0 - GENERAL NOTE #3 - DRAINAGE PIPE SHALL
 BEE SLOPED IN ACCORDANCE WITH 2014 FBC-PLUMBING TABLE
 704.1.
 6) SHT. P1.0 - SHOWS CONDENSATE DISCHARGING TO THE
 GREASE SYSTEM. WASTES THAT DO REQUIRE TREATMENT OR
 SEPARATION SHALL NOT BE DISCHARGED INTO ANY INTERCEPTOR
 OR SEPARATOR.2014 FBC-PLUMBING SEC.1003.2.
 7) SHT. P4.0 - DETAIL #2 - NOTE #1 - INDIRECT WASTE
 EXCEEDING 30 INCHES IN LENGTH SHALL BE TRAPPED PER THE
 2014 FBC-PLUMBING SEC. 802.2.
 8) SHT. P4.0 - THE DETAIL IS LABELED AS A FLOOR DRAIN
 BUT THE DETAIL IS OF A CLEANOUT. PLEASE REVISE.
 9) SHT. P4.0 - DETAIL #4 SHOWS THE CONDENSATE
 DISCHARGING TO THE ROOF BUT SHT. P 3.0 SHOWS THE
 CCONDENSATE DISCHARGING TO A ROOF DRAIN.THE CONDENSATE
 SHALL DRAIN TO A ROOF DRAIN.CLARIFY.
 10) SHT. P 6.0 - THE 2 INCH WATER LINE COMES INTO THE
 BUILDING, REDUCES TO 1 1/2 INCH TO THE WATER
 HEATER,INCREASES TO 2 INCH, AND REDUCES TO 1 1/2 INCH
 AGAIN. CLARIFY.
 11) SHT. P 6.0 - SHUTOFF VALVES ARE REQD. ON EQUIPMENT
 #50, #50.1, & 52. 2014 FBC- PLUMBING SEC.606.2.
 12) SHT. P6.0 - INDICATE THE PSI OF THE GAS SYATEM. WPB
 AMEND. TO FBC SEC. 107.3.5.1.3.
 13) SHT. P6.0 - INDICATE THE TYPE OF PIPE BEING USED
 FOR THE GAS SYSTEM.
 14) INDICATE ON SHT. P6.0 THE GAS SIZING TABLE FROM THE
 2014 FBC-FUEL GAS CODE USED FOR THE PIPE SIZING OF THE
 GAS SYSTEM.
 15) SUBMIT COMBUSTION AIR CALCULATIONS FOR ALL THE GAS
 EQUIPMENT.WHERE COMBUSTION AIR IS PROVIDED BY THE
 BUILDING'S MECHANICAL VENTILATION SYSTEM, THE SYSTEM
 SHALL PROVIDE THE SPECIFIED COMBUSTION AIR RATE IN
 ADDITION TO THE REQUIRED VENTILATION AIR. 2014 FBC-FUEL
 GAS SEC. 304.9.3, 304.9.1.
 16) CLEANOUTS ARE REQUIRED IN WASTE STACKS PER 2014
 FBC-PLUMBING SEC.708.3.4.
 17) SUBMIT A SITE PLAN SHOWING THE LOCATION OF THE
 EXISTING GREASE INTERCEPTORS.
  
 PLUMBING PLAN REVIEW
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 561-805-6692