| Date |
Text |
| 2015-11-18 17:44:38 | 1ST REVIEW: FBC 2014 MECHANICAL |
| | PERMIT #15110510 |
| | 11/18/15 |
| | |
| | 1) THE SUBMITTED AC COOLING AND HEATING CALCULATIONS |
| | SHOW A TOTAL LOAD OF 137.2 MBH FOR RTU'S 1, 2, &3, |
| | HOWEVER THE AC SCHEDULE ON SHEET M5.0 INDICATES A |
| | COMBINED TOTAL COOLING LOAD OF 307.1 MBH: SEE SECTION |
| | C403.2.2 FBC-14 ENERGY CONSERVATION- OUTPUT CAPACITY |
| | CANNOT EXCEED THE CALCULATED LOAD. |
| | 2) THE AC SCHEDULE INDICATES AN EFFICIENCY RATING OF 11 |
| | EER FOR RTU-2: SEE TABLE C403.2.3(1)- MINIMUM |
| | EFFICIENCY RATING FOR UNITS <65,000 BTUH IS 13 SEER. |
| | 3) THE SUBMITTED ENERGY EFFICIENCY FORM 506-2014 |
| | INDICATES AN 11 EER FOR OAU-1, HOWEVER NO RATING IS |
| | GIVEN IN THE AC SCHEDULE ON M5.0. |
| | 4) THE OUTSIDE AIR CALCULATION SCHEDULE ON SHEET M5.0 |
| | INDICATES 3008 CFM'S REQUIRED FOR THE DINING AND DELI |
| | AREAS, HOWEVER THE AIR BALANCE DIAGRAM ON M4.2 |
| | INDICATES ONLY 2100 CFM BEING PROVIDED BY OAU-1, AND 0 |
| | CFM PROVIDED BY THE RTU'S IN THOSE AREAS: PLEASE |
| | CLARIFY OR CORRECT. ADDITIONALLY, PLEASE NOTE THE |
| | DEFICIENCY IN OUTSIDE AIR FOR OCCUPANTS IN THE KITCHEN |
| | AND AT THE COOKLINE. ALL AIR BEING SUPPLIED TO THE |
| | KITCHEN IN THE DIAGRAM IS FOR EXHAUST MAKE-UP AIR- SEE |
| | SECTION 403.2 FBC-14 MECHANICAL. |
| | 5) PLEASE COMPLETE THE COMPLIANCE CHECKLIST ON ENERGY |
| | FORM 506-2014. |
| | 6) REFER TO SECTION 304 FBC-14 FUEL GAS AND INDICATE |
| | WHAT METHOD WILL BE UISED TO PROVIDE COMBUSTION AIR TO |
| | THE GAS-FIRED COOKING APPLIANCES IN THE KITCHEN, AND |
| | INCLUDE A CALCULATION- PLEASE TAKE NOTE OF SECTION |
| | 304.9.3 COMBIMNED COMBUSTION AND VENTILATION AIR. |
| | 7) SHEET A8.0: INDICATE HOW ACCESS TO THE EQUIPMENT ON |
| | THE ROOF IS BEING PROVIDED- REFER TO SECTION 306.5 |
| | FBC-14 MECHANICAL. |
| | 8) M4.2: REFER TO SECTION 301.15 AND PROVIDE THE WIND |
| | LOAD DESIGN CRITERIA FOR TIE DOWN OF THE ROOF TOP |
| | EQUIPMENT INCLUDING RTU'S AND FANS: WIND DESIGN |
| | CRITERIA 2014 FBC-B 1609.1.1 DETERMINATION OF WIND |
| | DESIGN- CHAPTER 6 OF ASCE 7-10.1609.3 |
| | BASIC WIND SPEED FIGURE 1609.A-C |
| | 1609.3 WIND SPEED CONVERSION |
| | A) THE BASIC WIND SPEED, VU, SHALL BE DETERMINED IN |
| | ACCORDANCE WITH 1609.3.1 & ASCE 7-10 |
| | B) AN IMPORTANCE FACTOR, FIGURE 1609 A-C, ASCE 7-10. |
| | C) AN EXPOSURE CATEGORY SHALL BE DETERMINED IN |
| | ACCORDANCE WITH 1609.4 & ASCE 7-10 |
| | D) A HEIGHT AND EXPOSURE ADJUSTMENT COEFFICIENT, * |
| | SHALL BE DETERMINED FROM TABLE 1609.7.2. ASCE 7-10. |
| | 9) M4.0: PROVIDE ENGINEERED TIE DOWN DETAILS FOR ALL OF |
| | THE ROOFTOP FANS SHOWN- DETAILS 8, 11, & 12. |
| | 10) PLEASE NOTE THAT THE CITY OF WPB CONSTRUCTION |
| | SERVICES DEPT. REQUIRES SEPARATE PERMIT APPLICATIONS, |
| | PLANS, AND SUBMITTALS FOR THE KITCHEN HOODS AND FIRE |
| | SUPRESSION SYSTEMS, AND FOR WALK-IN BOXES AND |
| | REFRIGERATION SYSTEMS. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 561-805-6719 |
| | [email protected] |
| | |