| Plan Review Notes For Permit 15110510 |
| Permit Number |
15110510 |
|
| Review Stop |
G |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2016-02-24 14:59:31 | | | | 2ND REVIEW: FBC 2014 | | | | | | GEORGE JOHNSON | | | PLUMBING PLANS EXAMINER | | | CITY OF WEST PALM BEACH | | | 561-805-6711 | | | [email protected] | | | | | | GAS COMMENTS: | | | | | | 1.SHT. P6.0 GAS RISER KITCHEN EQUIPMENT SCHEDULE #8 IS | | | CALLING OUT 240 CFM BTU LOAD SIZED AT 60FT USING THE | | | LONGEST LENGTH METHOD THAT BRANCH SHOULD BE 11/4IN .TO | | | COMPLY WITH FBC FUEL GAS TABLE 402.4(1) AND SEC 402.4.1 | | | | | | 2.SHT. P6.0 GAS RISER KITCHEN EQUIPMENT SCHEDULE #2+4 | | | IS CALLING OUT 110+108 CFM BTU LOAD SIZED AT 60FT USING | | | THE LONGEST LENGTH METHOD THAT BRANCH SHOULD BE 1IN .TO | | | COMPLY WITH FBC FUEL GAS TABLE 402.4(1) AND SEC | | | 402.4.1. | | | | | | 3.SHT.P6.0 IT APPEARS THAT ON RISER DIAGRAM YOUR BTU | | | LOAD AND KITCHEN EQUIPMENT SCHEDULE # IS REVERSED FOR | | | 8+9 THEY DON'T MATCH THE SCHEDULE ON SHT. K1.5 PLEASE | | | CLARIFY. PER WPB AMEND. TO FBC SEC. 107.2.1 | | | | | | 4. COMBUSTION AIR CALCULATIONS NOTE 2. THE MAKE UP AIR | | | FOR THAT HOOD IS CALCULATED FOR THE HOOD ONLY IF YOU | | | ARE USING MECHANICAL COMBUSTION AIR IT SHALL COMPLY | | | WITH FBC FUEL GAS SEC.304.9.3 COMBINED COMBUSTION AIR | | | AND VENTILATION AIR SYSTEM. | | | WHERE COMBUSTION AIR IS PROVIDED BY THE BUILDING?S | | | MECHANICAL VENTILATION SYSTEM, THE SYSTEM SHALL PROVIDE | | | THE SPECIFIED COMBUSTION AIR RATE IN ADDITION TO THE | | | REQUIRED VENTILATION AIR. PLEASE CLARIFY |
|