| Date |
Text |
| 2016-01-05 10:04:12 | PLAN |
| | REVIEW COMMENTS |
| | |
| | 2ND REVIEW: FBC FIFTH EDITION (2014) |
| | ROBERT MCDOUGAL, CBO |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | (561) 805-6714 |
| | [email protected] |
| | |
| | DENIED BY MECHANICAL |
| | PLEASE ADDRESS THE ITEMS NOTED BELOW: |
| | |
| | 1) SHOW COMPLIANCE WITH 2014 FBC ENERGY CONSERVATION |
| | SECT. 101.5.1 & 103.1 BY SUBMITTING THE PROPER |
| | CONSTRUCTION DOCUMENTS. SEE RESIDENTIAL BUILDING FORMS |
| | 402 OR 405. |
| | FBC ENERGY CONSERVATION - SECT. 103.1.1.2 CODE |
| | COMPLIANCE CERTIFICATION. |
| | THE BUILDING'S OWNER, THE OWNER'S ARCHITECT, OR OTHER |
| | AUTHORIZED AGENT LEGALLY DESIGNATED BY THE OWNER SHALL |
| | CERTIFY THAT THE BUILDING IS IN COMPLIANCE WITH THE |
| | CODE, AS PER SECTION 553.907, FLORIDA STATUTES, PRIOR |
| | TO RECEIVING THE PERMIT TO BEGIN CONSTRUCTION OR |
| | RENOVATION. |
| | |
| | 2) FBC - 107.3.5.3 PROVIDE TWO SETS OF A MECHANICAL |
| | PLAN TO SHOW EQUIPMENT AND LOCATION AND DUCT SYSTEMS |
| | PER FBC-R M16 & BATH EXHAUST PER FBC-R M15. FBC |
| | -107.3.5.1.4 MECHANICAL MINIMUM PLAN REVIEW CRITERIA: |
| | SHOW, EXHAUST SYSTEMS, CLOTHES DRYER EXHAUST, KITCHEN |
| | EQUIPMENT EXHAUST, SPECIALTY EXHAUST SYSTEMS, |
| | EQUIPMENT, EQUIPMENT LOCATION, MAKE-UP AIR, |
| | ROOF-MOUNTED EQUIPMENT, DUCT SYSTEMS, VENTILATION, |
| | COMBUSTION AIR, CHIMNEYS, FIREPLACES AND VENTS, |
| | APPLIANCES, BOILERS, REFRIGERATION, BATHROOM |
| | VENTILATION, LABORATORY, DESIGN FLOOD ELEVATION. |
| | |
| | 3) FBC-R - M1401.3 SIZING. HEATING AND COOLING |
| | EQUIPMENT SHALL BE SIZED BASED ON BUILDING LOADS |
| | CALCULATED IN ACCORDANCE WITH ACCA MANUAL J OR OTHER |
| | APPROVED HEATING AND COOLING CALCULATION METHODOLOGIES. |
| | PROVIDE EQUIPMENT SIZING CALCULATIONS. |
| | |
| | |
| | |
| | |