Plan Review Notes
Plan Review Notes For Permit 15101045
Permit Number 15101045
Review Stop E
Sequence Number 2
Notes
Date Text
2016-01-06 09:18:30 
 1ST REVIEW: FBC 2014 5TH ED. NEC 2011
 MARIO VALDES
 ELECTRICAL PLAN EXAMINER
 516-805-6700
 [email protected]
 ALTERNATE CONTACT
 MIKE ALBARRAN
 561-805-6746
 [email protected]
  
  
 GREGG, PLEASE NOTE THAT I CORRECTED A COUPLE OF
 CLUSTERS WITH THE TWO PERMITS. PERMIT 15101055 IS
 STRICTLY FOR THE FIRE SUPPRESSION AND THEREFORE SHOULD
 NOT HAVE ANY ELECTRICAL PLAN REVIEW STOPS ATTACHED
 THERETO. THE ONLY ELECTRICAL REVIEW THAT SHOULD BE
 ASSOCIATED WITH THIS PERMIT WOULD BE IF THERE IS AN
 EXISTING FIRE ALARM SYSTEM TO WHICH THIS FIRE
 SUPPRESSION SYSTEM WITH TIE IN TO. THEN AND ONLY THEN A
 SEPARATE FIRE ALARM PERMIT WILL BE REQUIRED. I HAVE
 ENTERED A NOTE IN THE FRONT SCREEN AS WELL AS ON THE
 PLANS OF THE 15101055 PERMIT INDICATING THAT. THAT
 PERMIT IS READY FOR ISSUANCE PENDING PAYMENT OF THE
 BALANCE DUE OF $146.00. KEEP IN MIND THAT IT IS RUNNING
 TOGETHER WITH 15101045 AND THEY SHOULD BE PICKED UP
 TOGETHER. ALL OF THE ELECTRICAL REVIEW COMMENTS, BOTH
 OF MARIO VALDES AND MYSELF HAVE BEEN TRANSFERRED TO THE
 15101045 PERMIT.
 WITH REGARDS TO THE 15101045, PLEASE READ BELOW.
 1. IN MY REVIEW COMMENTS OF 15101055 I ASKED THAT THE
 SCOPE OF WORK BE DEFINED ON THE PLANS AND PERMIT. THE
 PERMIT CALLS FOR THE INSTALLATION OF A PAINT BOOTH. YOU
 SHALL INDICATE: A) IF THIS IS A LISTED UNIT, ALL THE
 ELECTRICAL CONTRACTOR WILL BE DOING IS TO PROVIDE
 ELECTRICAL POWER FROM THE ELECTRICAL PANEL TO A
 DISCONNECT AND NOTHING ELSE. IN SUCH A CASE THE DATA
 PROVIDED FOR THE EQUIPMENT SHALL INDICATE THAT B) IF
 THE ELECTRICAL CONTRACTOR WILL BE ASSISTING IN THE
 ASSEMBLY OF THE UNIT, INDICATE SUCH. THIS WOULD ENTAIL
 INSPECTIONS OF THE WORK PERFORMED IN THE FIELD.
 FURTHERMORE, THE PLAN NOTES ON SHEET E1 OF THE
 SUBMITTED PLANS CALL FOR UPGRADING OR WORKING ON THE
 ELECTRICAL SERVICE; THIS IS NOT STATED ON ANY OF THE
 PERMITS (AN ELECTRICAL SUB PERMIT HAS NOT YET BEEN
 SECURED).
 2. ON TO MY SECOND COMMENT, WHICH WE HAVE DISCUSSED
 OVER AND OVER AND STILL I FAIL TO SEE ANYTHING
 INDICATING THAT A SINGLE PHASE MOTOR WILL DO THE TRICK.
 THE SINGLE SHEET WHICH YOU SENT ME DOES INCLUDE A
 SINGLE PHASE MOTOR. THE PROBLEM WITH THAT IS THAT I
 HAVE NO IDEA WHERE THAT CAME FROM AND IT IS AN OLD
 (2011) REVISION TO SOMETHING. THE CURRENT ONE WHICH
 ACCOMPANIES THE SUBMITTAL IS DATED DEC. 11, 2013. THE
 LATEST REVISION DOES NOT ADDRESS THE SINGLE PHASE MOTOR
 FOR A REASON. I WILL NEED SOMETHING FROM THE
 MANUFACTURER OR THE LISTING AGENT INDICATING THAT
 REPLACING THE MOTORS WILL NOT AFFECT THE LISTING.
 3. TO SETTLE THE MATTER WITH REGARDS TO THE THIRD
 COMMENT, THE ONE INQUIRING ON THE AMPS AS MENTIONED ON
 THE LITERATURE, I WILL NEED SOMETHING REFLECTING THE
 ACTUAL MOTORS WHICH WILL BE USED AND THE RESPECTIVE
 LOAD CALCS. THOUGHT I RECEIVED A LETTER FROM GARMART
 USA IT DOES NOT SPECIFY WHAT I AM ASKING FOR. THE SPEC
 SHEETS PROVIDE SEVERAL OPTIONS ALL OF WHICH HAVE
 DIFFERENT ELECTRICAL REQUIREMENTS. YOU SHALL INDICATE
 WHICH OF THOSE OPTIONS YOU WILL BE APPLYING AND PROVIDE
 THE PROPER LOAD CALCS FOR THAT APPLICATION.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE DO NOT HESITATE TO
 CONTACT ME; I WILL GLADLY HELP YO UNDERSTAND WHAT I
 NEED. BY THE WAY, I SPOKE W/CHRIS OF XTREME ELECTRICAL
 SERVICES AND HE WAS ABLE TO UNDERSTAND EVERYTHING I WAS
 SAYING.
  
 THANK YOU,