| Plan Review Notes For Permit 15101016 |
| Permit Number |
15101016 |
|
| Review Stop |
G |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2015-12-21 06:29:41 | 1) THE GAS SHALL BE DONE UNDER A SEPARATE PERMIT.A | | | SEPARATE PERMIT APPLICATION SHALL BE SUBMITTED FOR THE | | | GAS INSTALLATION. | | | 2) SUBMIT A GAS RISER DIAGRAM FOR REVIEW. SHOW THE | | | DISTANCE FROM THE METER TO THE MOST REMOTE OUTLET, THE | | | TYPE OF PIPE, THE PSI OF THE SYSTEM, AND INCLUDE ALL | | | EXISTING GAS APPLIANCES AND THE RESPECTIVE BTU LOADS OF | | | EACH APPLIANCE TO ENSURE PROPER SIZING.WPB AMEND. TO | | | FBC SEC.107.3.5.3. | | | 3) SUBMIT COMBUSTION AIR CALCULATIONS FOR THE DRYER. | | | FGC 304. | | | | | | GAS WILL BE UNDER A SEPARATE PERMIT. TKL.. | | | | | | | | | PLUMBING PLAN REVIEW | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | 561-805-6692 | | | [email protected] | | | |
|