| 2015-11-02 06:21:58 | 1) INDICATE ON THE SUBMITTED PLAN IF THE BOILERS ARE |
| | LOCATED ON THE INTERIOR OR THE EXTERIOR OF THE |
| | STRUCTURE. A SPECIFICATION SHEET THAT WAS SUBMITTED IS |
| | FOR AN OUTDOOR WATER HEATER. CLARIFY. |
| | 2) THE PLAN SHEET FROM LOCHINVAR NOTES (2) AWN 200 AND |
| | (2) RJA 200 TYPES OF EQUIPMENT. SUBMIT TWO COPIES OF |
| | THE MANUFACTURER'S SPECIFICATION SHEETS FOR THE AWN 200 |
| | PIECE OF EQUIPMENT IF IT IS BEING INSTALLED. WPB AMEND. |
| | TO FBC SEC. 107.2.1. |
| | 3) THERE ARE FIVE DIFFERENT PIECES OF EQUIPMENT THAT |
| | ARE REFERENCED IN HTIS SUBMITTAL: AWN 200, RJA 200, OAN |
| | 151-286, OAN 400-801, AND A WRITTEN MODEL OF AWN 501 |
| | PM. I HAVE NO IDEA WHAT IS BEING INSTALLED/REPLACED |
| | UNDER THIS PERMIT. IF THERE IS ADDITIONAL EQUIPMENT |
| | BEING INSTALLED, REVISE THE SCOPE OF WORK ON THE PERMIT |
| | APPLICATION AND ALSO THE VALUE. WPB AMEND. TO FBC SEC. |
| | 107.2.1. |
| | 4) THE SHEET SUBMITTED FOR THE LOCK-TEMP RJA 200 IS |
| | ILLEGIBLE. SUBMIT TWO LEGIBLE COPIES OF THE |
| | MANUFACTURER'S SPECS FOR THIS PIECE OF EQUIPMENT. THE |
| | SHEET THAT WAS SUBMITTED IS NOT THE MANUFACTURER'S |
| | SPECIFICATIONS, IT IS A SALS SHEET FROM THE INTERNET |
| | AND IS UNACCEPTABLE. |
| | 5) THE BOILERS SHALL HAVE A THERMAL EFFICIENCY OF 80 % |
| | IN ACCORDANCE WITH ANSI Z21.10.3 ( GAS WATER HEATERS |
| | WITH INPUT TATINGS ABOVE 75,000 BTU/HR.) & THE 2014 |
| | FBC-ENERGY, SEC.C404.2 7 TABLE C404.2. |
| | 6) IDENTIFY ALL PIECES OF EQIPMENT ON THE PLAN VIEW |
| | DRAWING.IDENTIFY ANY EXISTING EQUIPMENT THAT IS NOT |
| | BEING REPLACED. WPB AMEND. TO FBC SEC. 107.2.1. |
| | |