Date Text
2015-12-26 07:33:20**** THE FOLLOWING COMMENTS ARE A LIST OF PROVISOS THAT
 ARE BEING PLACED ON THE PLUMBING PLANS IN ORDER FOR THE
 BUILDING PERMIT TO BE ISSUED. THIS IS NOT AN APPROVAL
 THAT THE PLUMBING PLANS ARE IN COMPLIANCE WITH THE 2014
 FLORIDA PLUMBING CODE. THE PLUMBING PERMIT SHALL NOT BE
 ISSUED UNTIL THE PLUMBING PLANS HAVE BEEN REVISED,
 SUBMITTED, REVIEWED AND APPROVED IN COMPLIANCE WITH THE
 PLUMBING CODE AND ALL OF THE PLAN REVIEW COMMENTS.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
  
  
 1) THE DRAINAGE FROM THE KITCHEN ( RM.#11234-MILB
 KITCHEN) SHALL DRAIN THROUGH A GREASE INTERCEPTOR.SHOW
 THE SIZE AND LOCATION.
 2) THERE ARE FULLY OPERATIONAL KITCHENS IN THIS
 FACILITY. UNDER THE FIXTURE GREASE TRAPS WILL NOT BE
 PERMITTED IN THESE AREAS OR ANY AREA WHERE THERE IS
 COOKING AREAS THAT GENERATE GREASE. THE AREAS THAT WILL
 BE USING THE GREASE TRAPS UNDER THE FIXTURE SHALL BE
 CLEARLY IDENTIFIED ON THE PLANS AND THIS WILL BE
 REVIEWED ON A CASE BY CASE BASIS. SEE ALSO SHT. A2.122
 (RM. # 12209 & 12205 - CONCESSION COMMISSARY &
 CONCESSION). 2014 FBC PLUMBING SEC.1003.1, 1003.2.
 3) SHT.P2.100 & SHT.P2.101 - THESE TWO SHEETS THAT WERE
 UPLOADED ON 12/23/15 ARE THE SAME SHEET (SHT.P2.101).
 THERE IS NO SHT. P2.100. UPLOAD SHT. P2.100 FOR REVIEW.
 WPB AMEND. TO FBC SEC. 107.2.1.
 4) IT IS EXTREMELY DIFFICULT TO LOCATE THE CONTINUATION
 OF THE PLUMBING LINES FROM SHEET TO SHEET EVEN WITH
 MATCH LINES. WITHOUT COLUMN/GRID LINES, IT IS EXTREMELY
 DIFFICULT TO PINPOINT AREAS OF DEFICIENCIES IF
 APPLICABLE. IF POSSIBLE, PLEASE PROVIDE THIS ON THE
 PLANS. WPB AMEND. TO FBC SEC. 107.2.1.
 5) SHT. P2.102 - UPPER LEFT SIDE OF DRAWING SHOWS AN
 18" STORM DRAIN WITH 50,356 SQ. FT. AND CONTINUING ON
 SHT. P2.104 WITH A SQUARE FOOTAGE OF 48,788 THEN
 INCREASES TO 56,551 - CLARIFY.
 6) SHT. SHT. P2.104 NOTE #1 - CLEARLY IDENTIFY THE 24
 INCH STORM DRAIN BY CLOUDING ON SHT. C6.03.I COULD NOT
 FIND THIS DRAIN ON SHT. C6.03. DO THE SAME WITH THE
 OTHER 24 INCH STORM DRAINS SHTS.P5.301 & P5.302.
 7) SHT. P2.105 - INDICATE THE CONTINUATION/TERMINATION
 POINT OF THE 6 INCH FORCE MAIN NEAR THE BOTTOM OF THE
 DRAWING BY GRID LINE 01.WPB AMEND. TO FBC SEC. 107.2.1.
 8) SHT. P2.105 - PROVIDE A MATCH LINE ON THE RIGHT SIDE
 OF THE DRAWING. WPB AMEND. TO FBC SEC. 107.2.1.
 9) SHT. P2.109.4 - CLEARLY IDENTIFY WHICH PLAN IS
 1/P2.109.4 AND WHICH ONE IS 2/P2.109.4.WPB AMEND. TO
 FBC SEC. 107.2.1.
 10) SHT. P2.109.3 - CLEARLY IDENTIFY WHICH PLAN IS
 1/P2.109.3 AND WHICH ONE IS 2/P2.109.3.WPB AMEND. TO
 FBC SEC. 107.2.1.
 11) SHT. P2.109.4 SHOWS A 15" STORM DRAIN WITH 39,544
 SQ. FT. AND SHT. P2.106 SHOWS THE SAME 15" LINE WITH
 44,748 SQ. FT.CHECK THE SQUARE FOOTAGE CALCULATION WITH
 THE ADDED 6" LINE.
 12) SHT. P2.107 - THERE IS NO MATCH LINE ON THE RIGHT
 SIDE OF THE DRAWING. PLEASE IDENTIFY THE LOCATION OF
 THE 24" STORM SEWER ON SHT.C6.01 BY CLOUDING. I COULD
 NOT LOCATE THIS LINE ON THE PLAN.
 13) SHT.P2.108 - NOTE #1 REFERS TO SHT. C7.01 FOR
 CONTINUATION OF THE 6" SANITARY LINE. I COULD NOT
 LOCATE THIS LINE ON SHT.C7.01. PLEASE IDENTIFY BY
 CLOUDING.WPB AMEND. TO FBC SEC. 107.2.1.
 14) SHT. P2.109 - THERE IS NO MATCH LINE AT THE BOTTOM
 OF THE DRAWING. PROVIDE MATCH LINE.
 15) SHT. P2.109-THE LEFT SIDE OF THE DRAWING REFERS TO
 SHT.P1.04 . THERE IS NO SUCH DRAWING IN THE SET AND
 SHT. P2.104 DOESN'T CORRELATE WITH THIS SHEET. CLARIFY.
 16) SHT. P2.109.1 - THE TOP OF THE DRAWING REFERS TO
 SHT.1/P2.109.1. THIS IS THE SAME DRAWING, HOW CAN IT BE
 A MATCH LINE. CLARIFY.
 17) SHT.P2109.2 - THE BOTTOM OF THE DRAWING REFERS TO
 SHT.P2.100. THIS SHEET IS NOT IN THIS SUBMITTAL.
 CLARIFY.
 18) SHT.P2.109.3 - THE UPPER RIGHT SIDE OF THE PLAN
 REFERS TO SHT. P2.109.2 FOR CONTINUATION OF 8" STORM
 DRAIN AND THE BOTTOM OF SHT. REFERS TO SHT. P2.100.
 CLARIFY.
 19) SHT. P2.109.3 - THE RIGHT SIDE OF THE LOWER PLAN
 REFERS TO MATCH LINE P2.101. SHT. P2.101 DOES NOT
 CORRELATE WITH P2.109.3. CLARIFY.
 20) SANITARY RISERS ARE STILL INCOMPLETE. VENTS AND
 SANITARY LINES STOP AND START AND JUST END WITH NO
 CONTINUATION POINTS IDENTIFIED. SUBMIT EXPANDED RISERS
 FOR REVIEW.IT IS EXTREMELY DIFFICULT TO PERFORM A
 COMPREHENSIVE REVIEW.
 22) CLEANOUTS ARE REQUIRED IN THE BASE OF SOIL AND
 WASTE STACKS. 2014 FBC-PLUMBING SEC.708.3.4.
 23) NUMEROUS AREAS OF THE THE UNDERSLAB PIPING IS NOT
 SIZED.NUMEROUS SECTIONS OF THE VENTING SYSTEM IS NOT
 SIZED.
 24) VENTS OTHER THAN STACK VENTS OR VENT STACKS
 EXCEEDING 40 FEET IN DEVELOPED LENGTH SHALL BE
 INCREASED BY ONE NOMINAL PIPE SIZE FOR THE ENTIRE
 DEVELOPED LENGTH OF THE VENT PIPE PER 2014 FBC
 SEC.906.2.
 25) SUBMIT 100% COMPLETE SANITARY RISERS FOR REVIEW.
 WPB AMEND. TO FBC SEC. 107.3.5.1.3.
 26) THE LINT INTERCEPTOR HAS A CAPACITY OF 125 GALS.
 AND THE CALCULATED MAXIMUM FLOW IS 135 GPM. PLEASE
 EXPLAIN HOW THE INTERCEPTOR WILL HANDLE THE FLOW IF ALL
 EXTRACTORS ARE USED AT THE SAME TIME.
 27) WHERE IS THE DETAIL FOR THE GREASE INTERCEPTOR?
 THERE IS NO DETAIL ON P6.03 AS NOTED IN THE NARRATIVE
 RESPONSE.
 28) MOST OF THE SANITARY RISER DIAGRAMS DO NOT SHOW ANY
 PIPING TO THE GREASE INTERCEPTORS.SHT.P5.203 SHOWS SOME
 PIPING TO ONE OF THE INTERCEPTORS BUT IT JUST DOESN'T
 APPEAR TO MEET CODE,IIT IS DIFFICULT TO MAKE ANY
 DETERMINATION. SOME PIPING IS SHOWN BYPASSING THE
 INTERCEPTOR WITH NO INDICATION WHAT THE PIPING IS FOR.
 29) THE VENT, SOIL AND WASTE STACKS SHALL BE PROPERLY
 IDENTIFIED WITH AN ALPHA OR NUMERICAL LABEL.
 IDENTIFYING THE RISERS AS TO LOCATION SUCH AS "TO
 CLUBHOUSE LEVEL" OR "CONCOURSE LEVEL" MAKES IT
 EXTREMELY DIFFICULT TO FOLLOW THESE RISERS.WPB AMEND.
 TO FBC SEC. 107.2.1.
 30) SHT. P5.204 - NOTE #5 REFERS TO SHT. C7.04 FOR
 LOCATION & CONTINUATION OF 4" LINE TO SAND/OIL
 SEPARATOR. PLEASE IDENTIFY THE LOCATION OF THIS
 INTERCEPTOR ON THE DRAWING BY CLOUDING AS I COULD NOT
 LOCATE IT.
 31) SHT. C7.04 SHOWS A 750 GAL. EXTERIOR GREASE
 INTERCEPTOR NEAR THE WASHINTON NATIONALS CLUBHOUSE.
 INDICATE WHAT THIS GREASE INTERCEPTOR IS FOR AND SUBMIT
 SIZING CALCULATIONS PER 2014 FBC SEC.1003.2.
 32) A SAMPLING PORT IS REQUIRED DOWNSTREAM OF ALL
 GREASE INTERCEPTORS PER CWPB ENGINEERING DEPT. STANDARD
 DRAWING GS-7, GS-7.1. HTTP://WPB.ORG/ENGINEERING/WP-CON
 TENT/UPLOADS/SITES/7/2012/05/GS-7-AND-7_1.PDF
 33) SHT. P5.203.1 - IDENTIFY THE SECOND INTERCEPTOR ON
 THE RISER ( LINT OR GREASE).
 34) SUBMIT DETAILS/SPECIFICATIONS FOR GREASE
 INTERCEPTOR GI-1.WPB AMEND. TO FBC SEC. 107.2.1.
 35) SHT. P2.100 SHOWS 6" FS-1 CONNECTING TO THE STORM
 SYSTEM. WHAT IS THIS? THE FIXTURE TYPE IS NOT SHOWN ON
 ANY OF THE SCHEDULES. CLARIFY.
 36) SHT.P2.102 - THERE ARE DISCREPANCIES WITH THE
 SQUARE FOOTAGE SHOWN ON THE 15" STORM DRAIN ON THE PLAN
 VIEW AND THE STORM DRAIN SHOWN ON THE RISER ON
 SHT.P5.302.4. THE 15" STORM DRAIN ALONG GRID LINE NE
 SHOWS 45,262 SQ. FT. THEN REDUCING TO 44,261 SQ. FT.
 THEN THE SQUARE FOOTAGE INCREASING AGAIN. CLARIFY.
 37) SOME OF THE SECTORS SHOWN IN THE KEY PLANS ARE
 IDENTIFIED BY LETTERS ONLY AND SOME ARE IDENTIFIED BY
 LETTERS AND NUMBERS. THIS MAKES IT VERY DIFFICULT TO
 LOCATE THE CORRECT RISERS WHICH IS NOT AN EASY
 TASK.PLEASE CORRELATE THE IDENTIFICATION OF THE SECTORS
 WITH THE RISERS.WPB AMEND. TO FBC SEC. 107.2.1.
 38) SHT.P2.105 - THERE IS A 15" STORM DRAIN THAT RUNS
 NORTH & SOUTH; AT THE DOUBLE WYE THE PLAN VIEW SHOWS AN
 8" LINE BRANCHING TO THE LEFT WITH 4591 SQ. FT. SHT.
 P5.302.1 APPEARS TO SHOW THIS LINE AS A 6" LINE.
 CLARIFY.
 39) SHT. P5.301.2 - THE STORM DRAIN RISER SHOWS 2
 SEPARATE DISCHARGE POINTS FOR THE SAME LINE. THIS IS
 ALSO CONFUSING ON THE PLAN DRAWING SHT. P2.106.
 CLARIFY.
 40) SHT. P5.301.2 - THE STORM RISER SHOWS BRANCHES FROM
 THE STORM DRAIN BUT THEY ARE NOT SHOWN ON THE PLAN VIEW
 SHT. P2.106. SEE NUMBERED NOTES # 3, # 4 & # 6. SHOW
 THE CONNECTIONS TO THE STORM DRAIN ON THE PLAN VIEW.
 41) SHT. P5.301.2 - CLEARLY IDENTIFY THE CONTINUATION
 POINTS ON THE RISER FROM THE RISERS ON P5.301.1 ( SEE
 NOTE ON P5.301.1 FOR NOTE THAT REFERS TO SHT.
 P5.301.2.)
 42) SHT. P5.301 - CLEARLY IDENTIFY THE CONTINUATION
 POINTS FROM THE RISERS ON SHT. P5.301.2.
 43) SHT. P5.301.1 - CLEARLY IDENTIFY THE CONTINUATION
 POINTS FROM THE RISERS ON SHT. P5.301.2.
 44) P5.301.1 - THE 8" STORM DRAIN BETWEEN GRID LINES
 AE/AD -BRANCHES ARE SHOWN ON THE RISER BUT NOT SHOWN ON
 THE PLAN VIEW ON SHT. P2.109.CLARIFY.
 45) SHT. P5.301.1 - CHECK THE SQUARE FOOTAGE OF THE
 STORM DRAIN AND RISERS AGAINST THE PLAN VIEW ON SHT.
 P2.108. THERE ARE DISCREPANCIES IN THE SQUARE FOOTAGES.
 46) SHT. P2.108 - THE PLAN SHOWS A 10" LINE WITH 18,078
 SQ. FT.AND THE RISER ON SHT. P5.301.1 SHOWS A 12" STORM
 DRAIN. THE LINE IS UNDERSIZED AT 10". THERE ARE ALSO
 DISCREPANCIES IN THE SQUARE FOOTAGE OF THE STORM DRAIN
 AND RISERS.
 47) IF THE UNDERGROUND GAS IS GOING TO BE INSTALLED
 UNDER THIS PERMIT, A COMPLETE GAS DRAWING SHALL BE
 SUBMITTED FOR REVIEW. WPB AMEND. TO FBC SEC.
 107.3.5.1.3. CLARIFY.
 48) SHT.IR1.00 - ALL THE NOTES ON THE PLAN ARE
 ILLEGIBLE. THE RESPONSE NARRATIVE REFERS TO COMMENT
 RESPONSE LETTERS FOR ADDITIONAL INFORMATION. THERE ARE
 NO RESPONSE LETTERS FOR THIS ITEM. CLARIFY.2ND REQUEST.
 49) THERE ARE STILL PLUMBING SHEETS THAT STATE " REFER
 TO ARCHITECTURAL PLANS" OR "REFER TO CIVIL PLANS FOR
 CONTINUATION." SPECIFY THE SHEET FOR REVIEW IN LIEU OF
 THIS GENERAL STATEMENT.
 50) PROVIDE THE ROOM NUMBERS OF THE AREAS ON THE THE
 UNDERSLAB PLUMBING DRAWINGS. NOT ALL THE SHEETS HAVE
 THE ROOM NUMBERS ON THEM. THIS WILL HELP EXPEDITE THE
 PLAN REVIEW BY PINPOINTING LOCATIONS OF DEFICIENCIES IF
 APPLICABLE..
 51) SHEETS P5.204 & P5.205 - THE FLOOR DRAINS CONNECTED
 TO THE OIL/WATER SEPARATOR ARE STILL NOT VENTED.2014
 FBC SEC. 901.2.1.
 52) THE FOLLOWING ITEMS ARE REQUIRED FOR A GAS REVIEW:
 GAS PERMIT APPLICATION REQUIREMENTS
  
 1. SUBMIT AN ISOMETRIC DRAWING THAT CLEARLY SHOWS THE
 LENGTH OF ALL CUT SECTIONS OF PIPE PER 2014 FBC-FUEL
 GAS, SECS. 402.4.1, 402.4.2. OR 2014 FBC-RES SEC.
 G2413.
  
 2. SHOW THE TYPE OF PIPE MATERIAL BEING INSTALLED, ALL
 PIPE SIZES, AND THE CORRESPONDING EHD NUMBER OF THE
 CORRUGATED STAINLESS STEEL TUBING FOR EACH PIPE SIZE.
 WPB AMENDMENTS TO FBC SEC.107.2.1.
  
 3. TYPE OF GAS (LP OR NATURAL).
  
 4. BTU LOAD OF EACH APPLIANCE AND THE TOTAL BTU LOAD ON
 THE SYSTEM. REFER TO THE 2014 FBC-FUEL GAS SECS.401.8
 THRU 402.6.1 AND TABLES 402.4 (1) THRU 402.4 (37) OR
 2014 FBC-RES. SEC. G2413.
  
 5. SHOW THE DISTANCE FROM THE POINT OF DELIVERY, (METER
 OR MP REGULATOR) TO THE MOST REMOTE OUTLET IN THE
 BUILDING AND / OR SYSTEM PER THE 2014 FBC-FUEL GAS
 SEC.402.4.1 OR 2014 FBC-RES. SEC. G 2413.3.
  
 6. SUBMIT CALCULATIONS FOR COMBUSTION AIR PER THE 2014
 FBC-FUEL GAS CODE SEC.304.1 OR 2014 FBC-RES. SEC. G
 2407.
  
 7. INDICATE THE DELIVERY PRESSURE (PSI) OF THE SYSTEM
 ON THE PLAN PER 2014 FBC-FUEL GAS SEC.402.2 OR FBC RES.
 SEC. G2413.2. .
  
 8. SUBMIT A DETAIL SHOWING THE TYPE, LOCATION, SIZE AND
 TERMINATION OF THE GAS VENTS PER 2014 FBC-FUEL GAS
 SECS. 502 THRU 505. OR 2014 FBC-RES. SEC.G2426.
  
 9. SUBMIT MANUFACTURER?S SPECIFICATION SHEETS /
 INSTALLATION MANUAL FOR ALL GAS EQUIPMENT TO VERIFY
 COMPLIANCE WITH STANDARDS NFPA 54, NFPA 58, AND
 FBC-2014 FUEL GAS CODE SEC. 402.2, AND 301.3 OR 2014
 FBC-RES. SEC. G2404.3. GAS APPLIANCES SHALL BE LISTED
 AND LABELED.
  
 10. CLEARLY SHOW THE LOCATION AND CAPACITY OF LP
 TANK(S), TYPE OF TANK ( DOT OR ASME ), THE DISTANCE OF
 THE TANK FROM THE EXTERIOR BUILDING WALL AND ADJACENT
 PROPERTY LINES, THE DISTANCE OF THE TANK FROM ALL
 SOURCES OF IGNITION, OTHER CONTAINERS, BUILDINGS, AND
 THE LOCATION OF ANY BUILDING OPENINGS BELOW THE RELIEF
 VALVE OF THE TANK PER NFPA 58, TABLE 3-2.2.2.
  
 11. CLEARLY INDICATE ON THE PLAN IF THE LP TANK IS
 ABOVE GROUND OR BELOW GROUND, AND SHOW THE METHOD OF
 REQUIRED PROTECTION FOR THE LP TANK AND APPURTENANCES
 PER NFPA 58. IF THE TANK IS BELOW GROUND IT SHALL BE
 ANCHORED PER NFPA 58 SEC.3-2.2.7 (H). IF ABOVE GROUND,
 THE TANK SHALL BE SECURELY ANCHORED TO WITHSTAND 170
 MPH ULT WIND LOAD PER THE FLORIDA BUILDING CODE.
  
 12. EMERGENCY HOOD SHUT DOWN SHUT OFF VALVE SHALL BE
 BELOW THE CEILING. THE MANUAL SHUTOFF VALVE SHALL BE
 UPSTREAM. UNION TO BE DOWN STREAM OF MANUAL VALVE.
  
 ANY QUESTIONS REGARDING THESE REQUIREMENTS MAY BE
 REFERRED TO THE CHIEF PLUMBING INSPECTOR AT
 561-805-6692.
  
 ***NOTE - DO NOT SUBMIT REVISED DRAWINGS UNTIL AN
 PERSON MEETING IS ARRANGED WITH THE DESIGN PROFESSIONAL
 OF RECORD AND THE CHIEF PLUMBING INSPECTOR TO REVIEW A
 1005 COMPLETE SET OF PRINTED PLUMBING DRAWINGS THAT
 HAVE ADDRESSED EACH PLAN REVIEW COMMENT.WPB AMEND. TO
 FBC SEC. 107.2.1. & 107.2.1.4.
  
 PLUMBING PLAN REVIEW
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 561-805-6692
 [email protected]
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved