| Date |
Text |
| 2016-05-05 17:30:54 | 2ND REVIEW: FBC 2014 MECHANICAL |
| | PERMIT #15100827 |
| | 5/5/16 |
| | |
| | SOME OF THE COMMENTS FROM THE 1ST REVIEW STILL EXIST |
| | AND SOME NEW ISSUES REGARDING THE RE-SUBMITTED PLANS |
| | HAVE COME ABOUT. |
| | |
| | 1) AS PREVIOUSLY REQUESTED PLEASE PROVIDE THE FOLLOWING |
| | ITEMS: A) AC COOLING AND HEATING CALCULATIONS FOR THE |
| | NEW MINI-SPLIT SYSTEMS. B) WIND LOAD ENGINEERING FOR |
| | THE CONDENSER ON THE 2ND FLOOR C) CONDENSATE DISPOSAL |
| | FOR THE NEW AIR HANDLERS. D) ENERGY CALCULATIONS |
| | (PLEASE NOTE THE SUBMITTED ENERGY CALCULATIONS ARE FOR |
| | THE MAIN COURTHOUSE BUILDING). |
| | 2) SHEET MP-101: PLEASE CORRECT NOTE #3 TO READ "SHALL |
| | NOT OPERATE BELOW MINIMUM FLOW OF 1700 CFM......." |
| | 3) PROVIDE OPENING PROTECTION FOR EF-G-1 AND EF-G-2 IN |
| | COMPLIANCE WITH SECTION 501.3.2 FBC-14 MECHANICAL. |
| | 4) INDICATE THE CLEARANCE HEIGHT FROM THE FINISHED |
| | FLOOR TO THE BOTTOM EDGES OF THE EXHAUST FANS, AIR |
| | HANDLERS, AND ALL OTHER MECHANICAL EQUIPMENT LOCATED IN |
| | THE GARAGES- SEE SECTION 304.3. |
| | 5) SUBMIT MANUFACTURER'S SPECIFICATIONS AND |
| | INSTALLATION INSTRUCTIONS FOR THE CO AND NO2 DETECTORS |
| | WITH APPROVAL SIGNATURE BY THE ENGINEER OF RECORD. |
| | 6) SUBMIT A FLORIDA PRODUCT APPROVAL AND/OR A |
| | MIAMI-DADE NOA FOR THE LOUVERS. |
| | 7) REFER TO SECTIONS 401.4 AND 501.3.1 AND INDICATE |
| | WITH NOTES OR DETAILS THE REQUIRED CLEARANCE DISTANCE |
| | MEASUREMENTS FOR THE AIR INTAKES AND EXHAUST OUITLETS. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 561-805-6719 |
| | [email protected] |
| | |