Date Text
2015-10-23 16:23:591ST REVIEW: FBC 2014 MECHANICAL
 PERMIT #15100624
 1023/15
  
 1) THE PROPOSED PROJECT IS FOR INSTALLATION OF 5
 KITCHEN HOODS, AND ONE PIZZA OVEN WITH GREASE DUCT IN
 THE RESTAURANT. PLEASE REVISE THE JOB DESCRIPTION ON
 THE PERMIT APPLICATION TO MATCH THE DRAWINGS, AND
 ADJUST THE PER IT VALUE TO INCLUDE LABOR, MATERIALS AND
 EQUIPMENT- SECTION 109.3 WPB AMENDMENTS TO THE FBC-14
 BUILDING. THE SUBMITTED APPLICATION IS INDICATING
 INSTALLATION OF THE DUCTWORK AND FANS ONLY FOR THE
 HOODS.
 2) THE PLANS INDICATE A MAKE-UP AIR FAN FOR HOODS 1-4.
 INDICATE HOW MAKE-UP AIR IS BEING SUPPLIED TO THE PIZZA
 OVEN- REFER TO SECTION508.1 FBC-14 MECHANICAL.
 3) REFER TO SECTION 508.1.1 AND REVISE THE PLANS TO
 INDICATE COMPLIANCE: MAKEUP AIR TEMPERATURE.
 THE TEMPERATURE DIFFERENTIAL BETWEEN MAKEUP AIR AND THE
 AIR IN THE CONDITIONED SPACE SHALL NOT EXCEED 10
 DEGREES F (6 DEGREES C) EXCEPT WHERE THE ADDED HEATING
 AND COOLING LOADS OF THE MAKEUP AIR DO NOT EXCEED THE
 CAPACITY OF THE HVAC SYSTEM.
 4) A GENERAL STATEMENT REGARDING VELOCITY CALCULATIONS
 FOR THE GREASE DUCT IS GIVEN ON SHEET NO.1. PROVIDE
 SPECIFIC VELOCITY CALCULATIONS FOR EACH INDIVIDUAL
 GREASE DUCT SYSTEM SERVING THE GREASE HOODS- SEE
 SECTION 506.3.4 FBC-14 MECHANICAL.
 5) PROVIDE A TYPICAL DETAIL ON THE PLANS INDICATING HOW
 THE GREASE DUCTS WILL BE FIRE-WRAPPED, AND HOW ANY DUCT
 PENETRATIONS WILL BE FIRE-STOPPED. PROVIDE A UL TESTED
 AND APPROVED FIRE-STOPPING DETAIL ON THE PLANS, AND
 SUBMIT MANUFACTURER'S SPECS FOR THE MORGAN THERMAL
 CERAMICS PYROSCAT DUCT WRAP.
 6) REFER TO SECTION 507.9 AND REVISE THE DRAWINGS TO
 INDICATE COMPLIANCE: CLEARANCES FOR TYPE I HOOD.
 A TYPE I HOOD SHALL BE INSTALLED WITH A CLEARANCE TO
 COMBUSTIBLES OF NOT LESS THAN 18 INCHES (457 MM).
 EXCEPTION: CLEARANCE SHALL NOT BE REQUIRED FROM GYPSUM
 WALLBOARD OR 1/2-INCH (12.7 MM) OR THICKER CEMENTITIOUS
 WALLBOARD ATTACHED TO NONCOMBUSTIBLE STRUCTURES
 PROVIDED THAT A SMOOTH, CLEANABLE, NONABSORBENT AND
 NONCOMBUSTIBLE MATERIAL IS INSTALLED BETWEEN THE HOOD
 AND THE GYPSUM OR CEMENTITIOUS WALLBOARD OVER AN AREA
 EXTENDING NOT LESS THAN 18 INCHES (457 MM) IN ALL
 DIRECTIONS FROM THE HOOD.
 7) PROVIDE A ROOF PLAN SHOWING THE TERMINATION
 LOCATIONS OF THE EXHAUST DUCTS AND CLEARANCE DISTANCE
 MEASUREMENTS TO THE SUPPLY FANS, OTHER AIR INTAKES,
 BUILDING PROPERTY LINES ETC.- REFER TO SECTION
 506.3.13.3, AND TO SECTION 304.11 GUARDS.
 8) PROVIDE SITE SPECIFIC WIND LOAD TIE-DOWN ENGINEERING
 FOR INSTALLATION OF THE ROOF TOP FANS- SECTION 301.15.
 SUBMIT MIAMI-DADE NOA'S FOR THE FANS AND CURBS REVIEWED
 AND APPROVED BY THE DESIGN PROFESSIONAL OF RECORD.
 9) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE PIZZA
 OVEN AND EXHAUST DUCT AND FAN.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 561-805-6719
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved