| 2015-11-04 13:53:19 | 1ST REVIEW: FBC 2014 5TH ED. & RESIDENTIAL |
| | |
| | FBC 107 - PROVIDE AN ELECTRICAL PLAN TO DEMONSTRATE ANY |
| | PROPOSED ELECTRICAL IMPROVEMENTS. |
| | |
| | FBC 107 - PROVIDE A FLOOR PLAN TO SHOW THE USE OF THE |
| | SPACE AND THE ADJACENT SPACE WHICH COMMUNICATES WITH |
| | THE AREA. SHOW LIGHT & SWITCH AND RECEPTACLE LOCATIONS |
| | |
| | E3903.3 ADDITIONAL LOCATIONS. |
| | AT LEAST ONE WALL-SWITCH-CONTROLLED LIGHTING OUTLET |
| | SHALL BE INSTALLED IN HALLWAYS, STAIRWAYS, ATTACHED |
| | GARAGES, AND DETACHED GARAGES WITH ELECTRIC POWER. AT |
| | LEAST ONE WALL-SWITCH-CONTROLLED LIGHTING OUTLET SHALL |
| | BE INSTALLED TO PROVIDE ILLUMINATION ON THE EXTERIOR |
| | SIDE OF EACH OUTDOOR EGRESS DOOR HAVING GRADE LEVEL |
| | ACCESS, INCLUDING OUTDOOR EGRESS DOORS FOR ATTACHED |
| | GARAGES AND DETACHED GARAGES WITH ELECTRIC POWER. |
| | |
| | E3903.4 STORAGE OR EQUIPMENT SPACES. |
| | IN ATTICS, UNDER-FLOOR SPACES, UTILITY ROOMS AND |
| | BASEMENTS, AT LEAST ONE LIGHTING OUTLET SHALL BE |
| | INSTALLED WHERE THESE SPACES ARE USED FOR STORAGE OR |
| | CONTAIN EQUIPMENT REQUIRING SERVICING. SUCH LIGHTING |
| | OUTLET SHALL BE CONTROLLED BY A WALL SWITCH OR SHALL |
| | HAVE AN INTEGRAL SWITCH. AT LEAST ONE POINT OF CONTROL |
| | SHALL BE AT THE USUAL POINT OF ENTRY TO THESE SPACES. |
| | THE LIGHTING OUTLET SHALL BE PROVIDED AT OR NEAR THE |
| | EQUIPMENT REQUIRING SERVICING. |
| | |
| | E3902.2 GARAGE AND ACCESSORY BUILDING RECEPTACLES. |
| | ALL 125-VOLT, SINGLE-PHASE, 15- OR 20-AMPERE |
| | RECEPTACLES INSTALLED IN GARAGES AND GRADE-LEVEL |
| | PORTIONS OF UNFINISHED ACCESSORY BUILDINGS USED FOR |
| | STORAGE OR WORK AREAS SHALL HAVE GROUND-FAULT |
| | CIRCUIT-INTERRUPTER PROTECTION FOR PERSONNEL. |
| | |
| | FBC- 107.3.5.3 ? PROVIDE SMOKE DETECTORS PURSUANT TO |
| | FBC-R 314.3.1 AS REQUIRED FOR NEW DWELLINGS |
| | |
| | FBC-R 315.1 ? PROVIDE CARBON MONOXIDE ALARMS WITHIN 10 |
| | FEET OF EACH SLEEPING ROOM IF APPLICABLE. |
| | |
| | PLEASE BE ADVISED THE INSPECTOR MAY REQUIRE PREVIOUSLY |
| | COMPLETED WORK TO BE MADE ACCESSIBLE AND OPEN FOR |
| | INSPECTION OR REQUIRE ADDITIONAL DOCUMENTATION FOR ALL |
| | CONCEALED WORK PREVIOUSLY COMPLETED PURSUANT TO FBC 110 |
| | & FBC 117. |
| | FBC 110.1 GENERAL. CONSTRUCTION OR WORK FOR WHICH A |
| | PERMIT IS REQUIRED SHALL BE SUBJECT TO INSPECTION BY |
| | THE BUILDING OFFICIAL AND SUCH CONSTRUCTION OR WORK |
| | SHALL REMAIN ACCESSIBLE AND EXPOSED FOR INSPECTION |
| | PURPOSES UNTIL APPROVED. |
| | FBC 117 - THE BUILDING OFFICIAL MAY REQUIRE TESTS OR |
| | TEST REPORTS AS PROOF OF COMPLIANCE. REQUIRED TESTS ARE |
| | TO BE MADE AT THE EXPENSE OF THE OWNER, OR AGENT, BY AN |
| | APPROVED TESTING LABORATORY OR OTHER APPROVED AGENCY. |
| | |
| | STEVEN KENNEDY, CBO |
| | CHIEF PLANS EXAMINER |
| | (561) 805-6710 |
| | [email protected] |
| | |