Plan Review Notes
Plan Review Notes For Permit 15100556
Permit Number 15100556
Review Stop B
Sequence Number 1
Notes
Date Text
2015-11-04 13:36:01CHRISTOPHER S. THROOP, C.B.O.
 BLDG. PLANS EXAMINER ? PX3169
 (561) 805-6718
 [email protected]
  
 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS.
 CONSTRUCTION DOCUMENTS SHALL BE DIMENSIONED AND DRAWN
 UPON SUITABLE MATERIAL. CONSTRUCTION DOCUMENTS SHALL BE
 OF SUFFICIENT CLARITY TO INDICATE THE LOCATION, NATURE
 AND EXTENT OF THE WORK PROPOSED AND SHOW IN DETAIL THAT
 IT WILL CONFORM TO THE PROVISIONS OF THIS CODE AND
 RELEVANT LAWS, ORDINANCES, RULES AND REGULATIONS, AS
 DETERMINED BY THE BUILDING OFFICIAL. SUCH DRAWINGS AND
 SPECIFICATIONS SHALL CONTAIN INFORMATION, IN THE FORM
 OF NOTES OR OTHERWISE, AS TO THE QUALITY OF MATERIALS,
 WHERE QUALITY IS ESSENTIAL TO CONFORMITY WITH THE
 TECHNICAL CODES. SUCH INFORMATION SHALL BE SPECIFIC,
 AND THE TECHNICAL CODES SHALL NOT BE CITED AS A WHOLE
 OR IN PART, NOR SHALL THE TERM "LEGAL" OR ITS
 EQUIVALENT BE USED AS A SUBSTITUTE FOR SPECIFIC
 INFORMATION. ALL INFORMATION, DRAWINGS, SPECIFICATIONS
 AND ACCOMPANYING DATA SHALL BEAR THE NAME AND SIGNATURE
 OF THE PERSON RESPONSIBLE FOR THE DESIGN. (SEE ALSO
 SECTION 107.3.5).
  
 FBC 107.3.4 - PROVIDE PRODUCT APPROVALS FOR THOSE
 PRODUCTS WHICH ARE REGULATED BY
 FAC RULE 9N-3 REVIEWED AND APPROVED IN WRITING BY THE
 DESIGNER OF RECORD. SPECIFICALLY, PROVIDE WINDOW, AND
 DOOR SUBMITTALS.
  
 FBC 107.3.5.3 - PROVIDE WIND DESIGN LOADS/DESIGN
 PRESSURES PURSUANT TO FBC-R301.2.
  
 FBC - R301.2.1.2 PROTECTION OF OPENINGS.
 WINDOWS IN BUILDINGS LOCATED IN WINDBORNE DEBRIS
 REGIONS SHALL HAVE GLAZED OPENINGS PROTECTED FROM
 WINDBORNE DEBRIS. GLAZED OPENING PROTECTION FOR
 WINDBORNE DEBRIS SHALL MEET THE REQUIREMENTS OF THE
 LARGE MISSILE TEST OF ASTM E 1996, ASTM E 1886, SSTD 12
 OR TAS 201, 202 AND 203 OR AAMA 506 REFERENCED THEREIN.
 GARAGE DOOR GLAZED OPENING PROTECTION FOR WINDBORNE
 DEBRIS SHALL MEET THE REQUIREMENTS OF AN APPROVED
 IMPACT RESISTING STANDARD OR ANSI/DASMA 115.
  
 PROVIDE FLOOR PLAN AND SECTIONAL VIEW OF WALL DETAILING
 INTERIOR FINISH AND EXTERIOR WALL SYSTEM.
  
 PLEASE BE ADVISED THE INSPECTOR MAY REQUIRE PREVIOUSLY
 COMPLETED WORK TO BE MADE ACCESSIBLE AND OPEN FOR
 INSPECTION OR REQUIRE ADDITIONAL DOCUMENTATION FOR ALL
 CONCEALED WORK PREVIOUSLY COMPLETED PURSUANT TO FBC 110
 & FBC 117.
 FBC 110.1 GENERAL. CONSTRUCTION OR WORK FOR WHICH A
 PERMIT IS REQUIRED SHALL BE SUBJECT TO INSPECTION BY
 THE BUILDING OFFICIAL AND SUCH CONSTRUCTION OR WORK
 SHALL REMAIN ACCESSIBLE AND EXPOSED FOR INSPECTION
 PURPOSES UNTIL APPROVED.
 FBC 117 - THE BUILDING OFFICIAL MAY REQUIRE TESTS OR
 TEST REPORTS AS PROOF OF COMPLIANCE. REQUIRED TESTS ARE
 TO BE MADE AT THE EXPENSE OF THE OWNER, OR AGENT, BY AN
 APPROVED TESTING LABORATORY OR OTHER APPROVED AGENCY.
  
  
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved