| 2015-10-14 12:05:25 | 1ST REVIEW: FBC 2014 MECHANICAL |
| | PERMIT #15100135 |
| | 10/14/15 |
| | |
| | 1) THE PERMIT APPLICATION WORK DESCRIPTION IS |
| | INCORRECT: THIS IS NOT A CHANGE-OUT, IT IS A NEW AC |
| | SYSTEM IN A PREVIOUSLY UNCONDITIONED BUILDING. PLEASE |
| | CHANGE THE DESCRIPTION ON THE APPLICATION. |
| | 2) REFER TO SECTION R101.4.5 FBC-14 ENERGY |
| | CONSERVATION: CHANGE IN SPACE CONDITIONING. |
| | ANY NONCONDITIONED SPACE THAT IS ALTERED TO BECOME |
| | CONDITIONED SPACE SHALL BE REQUIRED TO BE BROUGHT INTO |
| | FULL COMPLIANCE WITH THIS CODE. |
| | PLEASE PROVIDE TWO COPIES OF ENERGY CALCULATIONS USING |
| | EITHER THE PRESCRIPTIVE OR PERFORMANCE COMPLIANCE PATH- |
| | SEE TABLE R101.5.1 FOR FORMS. |
| | 3) REFER TO SECTION 403.6.1 AND PROVIDE AC COOLING AND |
| | HEATING CALCULATIONS IN ACCORDANCE WITH ACCA MANUAL J. |
| | 4) THE SUBMITTED AC PLAN DOES NOT CLEARLY SHOW WHERE |
| | THE NEW AIR HANDLER IS TO BE LOCATED- PLEASE CLARIFY, |
| | AND NOTE THAT AIR HANDLERS SHALL NOT BE INSTALLED IN |
| | THE ATTIC WHEN A PLAN IS BROUGHT INTO COMPLIANCE USING |
| | THE PRESCRIPTIVE METHOD- SEE R402. |
| | 5) PROVIDE STRUCTURAL DETAILS FOR INSTALLATION OF THE |
| | CONDENSER PAD, AND WIND LOAD TIE DOWN DETAILS FOR |
| | ANCHORING THE CONDENSER TO THE PAD- REFER TO SECTIONS |
| | M1305.1.4.1 AND M1401.4 FBC-14 RESIDENTIAL. |
| | 6) IDENTIFY ALL ROOMS ON THE LAYOUT PLAN AND SHOW A |
| | MEANS OF RETURN AIR FROM REQUIRED ROOMS AND SPACES- |
| | REFER TO SECTION M1602 FBC-14 RESIDENTIAL. |
| | 7) AN ELECTRICAL PLAN AND LOAD CALCULATIONS IS |
| | REQUIRED. |
| | 8) PLEASE NOTE THAT ALL CONTRACTOR PLANS MUST BE SIGNED |
| | BY THE CONTRACTOR THAT DREW THEM- SECTIO N 107.2.1 WPB |
| | AMENDMENTS TO THE FBC-10 BUILDING. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 561-805-6719 |
| | [email protected] |
| | |