2015-10-26 19:22:29THE PLANS FOR THE ABOVE MENTIONED PERMIT APPLICATION
 HAVE BEEN REVIEWED FOR COMPLIANCE WITH THE ???2011
 EDITION OF THE NEC, (NATIONAL ELECTRICAL CODE); THE 5TH
 EDITION OF THE FBC, (FLORIDA BUILDING CODE) AS
 APPLICABLE AND BELOW ARE THE DEFICIENCIES NOTED.
 1. GENERAL NOTES #12: DO YOU REALLY WANT TO RUN A #2CU
 GROUND CONDUCTOR TO THE 15 -20 AMP 125 VAC OUTLET?
 CORRECT YOUR NOTE ACCORDINGLY.
 2. IN YOUR NOTES YOU SEEK TO OBTAIN A 5 OHM READING ON
 THE GROUNDING. I BELIEVE THAT SUCH A READING IS
 UNOBTAINABLE, ARE YOU SURE YOU DON?T MEAN 25 OHM?
 3. IN ADDITION TO GROUND THE GENERATOR, A FOUNDATION
 GROUND TO THE GENERATOR PAD STEEL SHALL BE RUN AS WELL.
 PER NEC 250.66.
 4. PROVIDE A FEEDER DIAGRAM AS DIRECTED IN NEC 215.5.
 THIS DIAGRAM SHALL INCLUDE LOAD CALCS AND CONDUCTOR
 SIZING.
 THE PLANS SHALL BE REVISED TO ADDRESS THE HEREIN
 MENTIONED ITEMS; ONCE CORRECTED SHALL BE RESUBMITTED
 FOR ANOTHER REVIEW. WHEN RESUBMITTING, YOU ARE REQUIRED
 TO PROVIDE A RESPONSE LETTER ADDRESSING EACH ITEM ALONG
 WITH THE STANDARD CITY RE-SUBMITTAL FORM. PLEASE,
 ADDITIONALLY, INSERT CORRECTED PAGES INTO THE SUBMITTAL
 AND LEAVE THE PREVIOUSLY REVIEWED SHEETS FOR
 COMPARISON. CLOUDING THE CHANGES WILL BE GREATLY
 APPRECIATED.
 IF YOU HAVE FURTHER QUESTIONS, PLEASE DON?T HESITATE TO
 CONTACT ME DIRECTLY.
  
 THANK YOU,
 MIKE ALBARRAN
 ELECTRICAL PLANS EXAMINER
  