| 2016-06-23 09:39:30 | 2ND REVIEW: FBC 2014 MECHANICAL |
| | PERMIT #15091310 |
| | 6/23/16 |
| | |
| | 1) AS PREVIOUSLY REQUESTED IN THE 1ST REVIEW, PROVIDE |
| | AHRI CERTIFICATES FOR THE HEAT PUMPS, SUBMIT |
| | MANUFACTURER'S SPECIFICATIONS FOR THE HEAT PUMPS AND |
| | COOLING TOWER, AND PROVIDE STRUCTURAL DETAILS FOR |
| | INSTALLATION OF THE COOLING TOWER CONCRETE MOUNTING |
| | PAD, AND WIND LOAD ENGINEERING FOR ANCHORING THE TOWER |
| | TO THE PAD. PLEASE NOTE THAT THE PLAN SHOWS A PAD FOR |
| | THE THE TOWER, HOWEVER THE SURVEY INDICATES AN EXISTING |
| | CONCRETE DECK. PLEASE CLARIFY WHICH IS APPLICABLE TO |
| | THE PROJECT. |
| | |
| | 2) SHEET M-1: THE PLAN IS SPECIFYING BOTH FLORIDA HEAT |
| | PUMPS (AC-1 & 2), AND TRANE AHU'S 1 & 2: PLEASE CLARIFY |
| | WHICH UNITS WILL BE INSTALLED. |
| | |
| | 3) M-1: PROVIDE WATER PIPING SPECIFICATIONS AND THE |
| | TYPE, SIZE AND THICKNESS OF THE PIPING INSULATION. |
| | CLARIFY HOW THE PIPING WILL BE RUN FROM THE COOLING |
| | TOWER TO THE BUILDING AND HOW IT WILL BE PROTECTED . |
| | INCLUDE THE PIPING AND INSULATUION DATA IN THE ENERGY |
| | CALCULATIONS. |
| | |
| | 4) THE ENERGY CALCULATION FORM R406-2014 MUST BE SIGNED |
| | AND DATED BY THE OWNER/AGENT SUBMITTED, AND MUST ALSO |
| | BEAR THE ORIGINAL SIGNATURE OF THE PREPARER. |
| | |
| | 5) M-1: PLEASE ADD THE 4X2 SUPPLY GRILLS TO THE LEGEND |
| | |
| | 6) PROVIDE DETAILS FOR THE WATER SOURCE TO THE COOLING |
| | TOWER. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 561-805-6719 |