| Date |
Text |
| 2015-11-10 08:20:15 | 1ST REVIEW: FBC 2014 MECHANICAL |
| | PERMIT #15091310 |
| | 11/10/15 |
| | |
| | 1) SHEET M-1: SOME OF THE PRINT ON THE PLAN AND IN THE |
| | EQUIPMENT SCHEDULES (UPPER RIGHT AND BOTTOM CENTER) IS |
| | EITHER ILLEGIBLE OR JUST TO FAINT TO READ. REFER TO |
| | SECTION 107.2.1 WPB AMENDMENTS TO THE FBC-14 BUILDING |
| | CODE. INFORMATION ON CONSTRUCTION DOCUMENTS. |
| | CONSTRUCTION DOCUMENTS SHALL BE |
| | DIMENSIONED AND DRAWN UPON SUITABLE MATERIAL. |
| | ELECTRONIC MEDIA DOCUMENTS SHALL BE SUBMITTED WHEN |
| | APPROVED BY THE BUILDING OFFICIAL. CONSTRUCTION |
| | DOCUMENTS SHALL BE OF SUFFICIENT CLARITY TOINDICATE THE |
| | LOCATION, NATURE AND EXTENT OF THE WORK PROPOSED AND |
| | SHOW IN DETAIL THAT IT WILL CONFORM TO THE PROVISIONS |
| | OF THIS CODE AND RELEVANT LAWS, ORDINANCES, RULES AND |
| | REGULATIONS, AS |
| | DETERMINED BY THE BUILDING OFFICIAL. SUCH DRAWINGS AND |
| | SPECIFICATIONS SHALL CONTAIN INFORMATION, IN THE FORM |
| | OF NOTES OR OTHERWISE, AS TO THE QUALITY OF MATERIALS, |
| | WHERE QUALITY IS ESSENTIAL TO CONFORMITY WITH THE |
| | TECHNICAL CODES. SUCH INFORMATION SHALL BE SPECIFIC, |
| | AND THE TECHNICAL CODES SHALL NOT BE CITED AS A WHOLE |
| | OR IN PART, NOR SHALL THE TERM "LEGAL" OR ITS |
| | EQUIVALENT BE USED AS A |
| | SUBSTITUTE FOR SPECIFIC INFORMATION. ALL INFORMATION, |
| | DRAWINGS, SPECIFICATIONS AND ACCOMPANYING DATA SHALL |
| | BEAR THE NAME AND SIGNATURE OF THE PERSON RESPONSIBLE |
| | FOR THE DESIGN. (SEE ALSO SECTION 107.3.5). |
| | |
| | 2) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE |
| | CHILLER, THE COMPRESSOR, THE COOLING TOWER AND THE |
| | CHILLER PUMPS. THE EQUIPMENT- INCLUDING THE HEAT PUMPS- |
| | SHALL MEET MINIMUM EFFICIENCY REQUIREMENTS AS OUTLINED |
| | IN TABLES C403.2.3(2), C403.2.3(7), AND C403.2.3(8). |
| | |
| | 3) SUBMIT AHRI CERTIFICATES FOR THE DX HEAT PUMPS, THE |
| | CHILLER, AND THE COOLING TOWER (TOWER MAY HAVE OTHER |
| | TEST CERTIFICATION AS NOTED IN TABLE C403.2.3(8)). |
| | |
| | 4) M-1: THE NOTE "COOLING STATION UNDER BAR OUTSIDE |
| | CHILLER" IS WRITTEN BY THE STAIRWELL IN THE 1ST FLOOR |
| | MECH. PLAN: PLEASE CLARIFY WHAT THIS NOTE IS |
| | INDICATING. |
| | |
| | 5) REFER TO SECTIONS M1305.1.4.1 AND M1401.4 FBC-14 |
| | RESIDENTIAL AND PROVIDE STRUCTURAL DETAILS FOR |
| | INSTALLATION OF THE COOLING TOWER SLAB AND WIND LOAD |
| | TIE DOWN ENGINEERING FOR MOUNTING THE TOWER TO THE |
| | SLAB. |
| | |
| | 6) PROVIDE A TYICAL SECTION DETAIL FOR THE DX HEAT |
| | PUMPS INDICATING HOW THEY WILL BE SUPPORTED ABOVE THE |
| | GARAGE FLOOR, THE HEIGHT FROM THE FINISHED FLOOR TO THE |
| | BOTTOM OF THE UNITS, THE REQUIRED DRAIN PAN, AND |
| | PRIMARY AND SECONDARY CONDENSATE DISPOSAL DETAILS- SEE |
| | SECTION M1411.3 |
| | |
| | 7) SUBMIT ENERGY CALCULATIONS FOR THE PROPOSED PROJECT |
| | IN COMPLIANCE WITH SECTION R101.4.3 FBC-14 ENERGY |
| | CONSERVATION. SEE TABLE R101.5.2 AND SUBMIT TWO COPIES |
| | OF FORM R402 OR FORM R405. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 561-805-6719 |
| | [email protected] |
| | |