2015-11-10 08:20:151ST REVIEW: FBC 2014 MECHANICAL
 PERMIT #15091310
 11/10/15
  
 1) SHEET M-1: SOME OF THE PRINT ON THE PLAN AND IN THE
 EQUIPMENT SCHEDULES (UPPER RIGHT AND BOTTOM CENTER) IS
 EITHER ILLEGIBLE OR JUST TO FAINT TO READ. REFER TO
 SECTION 107.2.1 WPB AMENDMENTS TO THE FBC-14 BUILDING
 CODE. INFORMATION ON CONSTRUCTION DOCUMENTS.
 CONSTRUCTION DOCUMENTS SHALL BE
 DIMENSIONED AND DRAWN UPON SUITABLE MATERIAL.
 ELECTRONIC MEDIA DOCUMENTS SHALL BE SUBMITTED WHEN
 APPROVED BY THE BUILDING OFFICIAL. CONSTRUCTION
 DOCUMENTS SHALL BE OF SUFFICIENT CLARITY TOINDICATE THE
 LOCATION, NATURE AND EXTENT OF THE WORK PROPOSED AND
 SHOW IN DETAIL THAT IT WILL CONFORM TO THE PROVISIONS
 OF THIS CODE AND RELEVANT LAWS, ORDINANCES, RULES AND
 REGULATIONS, AS
 DETERMINED BY THE BUILDING OFFICIAL. SUCH DRAWINGS AND
 SPECIFICATIONS SHALL CONTAIN INFORMATION, IN THE FORM
 OF NOTES OR OTHERWISE, AS TO THE QUALITY OF MATERIALS,
 WHERE QUALITY IS ESSENTIAL TO CONFORMITY WITH THE
 TECHNICAL CODES. SUCH INFORMATION SHALL BE SPECIFIC,
 AND THE TECHNICAL CODES SHALL NOT BE CITED AS A WHOLE
 OR IN PART, NOR SHALL THE TERM "LEGAL" OR ITS
 EQUIVALENT BE USED AS A
 SUBSTITUTE FOR SPECIFIC INFORMATION. ALL INFORMATION,
 DRAWINGS, SPECIFICATIONS AND ACCOMPANYING DATA SHALL
 BEAR THE NAME AND SIGNATURE OF THE PERSON RESPONSIBLE
 FOR THE DESIGN. (SEE ALSO SECTION 107.3.5).
  
 2) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE
 CHILLER, THE COMPRESSOR, THE COOLING TOWER AND THE
 CHILLER PUMPS. THE EQUIPMENT- INCLUDING THE HEAT PUMPS-
 SHALL MEET MINIMUM EFFICIENCY REQUIREMENTS AS OUTLINED
 IN TABLES C403.2.3(2), C403.2.3(7), AND C403.2.3(8).
  
 3) SUBMIT AHRI CERTIFICATES FOR THE DX HEAT PUMPS, THE
 CHILLER, AND THE COOLING TOWER (TOWER MAY HAVE OTHER
 TEST CERTIFICATION AS NOTED IN TABLE C403.2.3(8)).
  
 4) M-1: THE NOTE "COOLING STATION UNDER BAR OUTSIDE
 CHILLER" IS WRITTEN BY THE STAIRWELL IN THE 1ST FLOOR
 MECH. PLAN: PLEASE CLARIFY WHAT THIS NOTE IS
 INDICATING.
  
 5) REFER TO SECTIONS M1305.1.4.1 AND M1401.4 FBC-14
 RESIDENTIAL AND PROVIDE STRUCTURAL DETAILS FOR
 INSTALLATION OF THE COOLING TOWER SLAB AND WIND LOAD
 TIE DOWN ENGINEERING FOR MOUNTING THE TOWER TO THE
 SLAB.
  
 6) PROVIDE A TYICAL SECTION DETAIL FOR THE DX HEAT
 PUMPS INDICATING HOW THEY WILL BE SUPPORTED ABOVE THE
 GARAGE FLOOR, THE HEIGHT FROM THE FINISHED FLOOR TO THE
 BOTTOM OF THE UNITS, THE REQUIRED DRAIN PAN, AND
 PRIMARY AND SECONDARY CONDENSATE DISPOSAL DETAILS- SEE
 SECTION M1411.3
  
 7) SUBMIT ENERGY CALCULATIONS FOR THE PROPOSED PROJECT
 IN COMPLIANCE WITH SECTION R101.4.3 FBC-14 ENERGY
 CONSERVATION. SEE TABLE R101.5.2 AND SUBMIT TWO COPIES
 OF FORM R402 OR FORM R405.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 561-805-6719
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved