| 2015-11-03 08:48:42 | 1ST REVIEW: FBC 2014 MECHANICAL, FBC 2014 ENERGY |
| | CONSERVATION |
| | PERMIT #15091225 |
| | 11/3/15 |
| | |
| | 1) SHEET A-003: PLEASE ADD THE 2014 (FIFTH EDITION) |
| | FLORIDA BUILDING CODE- ENERGY CONSERVATION TO THE LIST |
| | OF APPLICABLE CODES. REFER TO THE FOLLOWING SECTIONS OF |
| | THE CODE CALLED OUT BELOW AND SHOW COMPLIANCE: |
| | A ) PROVIDE AC COOLING AND HEATING CALCULATIONS IN |
| | ACCORDANCE WITH SECTION C403.2.1 FBC-14 ENERGY |
| | CONSERVATION- CALCULATION OF HEATING AND COOLING LOADS. |
| | DESIGN LOADS SHALL BE DETERMINED IN ACCORDANCE WITH THE |
| | PROCEDURES DESCRIBED IN THE ASHRAE/ACCA STANDARD 183 OR |
| | ACCA MANUAL N AND SHALL BE ATTACHED TO THE CODE |
| | COMPLIANCE FORM SUBMITTED TO THE BUILDING DEPARTMENT |
| | WHEN THE BUILDING IS PERMITTED OR, IN THE EVENT THE |
| | MECHANICAL PERMIT IS OBTAINED AT A LATER TIME, THE |
| | SIZING CALCULATION SHALL BE SUBMITTED WITH THE |
| | APPLICATION FOR THE MECHANICAL PERMIT. HEATING AND |
| | COOLING LOADS SHALL BE ADJUSTED TO ACCOUNT FOR LOAD |
| | REDUCTIONS THAT ARE ACHIEVED WHEN ENERGY RECOVERY |
| | SYSTEMS ARE UTILIZED IN THE HVAC SYSTEM IN ACCORDANCE |
| | WITH THE ASHRAE HVAC SYSTEMS AND EQUIPMENT HANDBOOK. |
| | ALTERNATIVELY, DESIGN LOADS SHALL BE DETERMINED BY AN |
| | APPROVED EQUIVALENT COMPUTATION PROCEDURE, USING THE |
| | DESIGN PARAMETERS SPECIFIED IN CHAPTER 3. |
| | B) PROVIDE ENERGY CALCULATIONS IN ACORDANCE WITH |
| | SECTION C101.2 AND C101.5. |
| | C) REFER TO SECTION C408 SYSTEM COMMISSIONING INCLUSIVE |
| | OF ALL SUB-SECTIONS AND SUBMIT A COMMISSIONING PLAN. |
| | PLEASE NOTE THAT PRELIMINARY AND FINAL REPORTS ON THE |
| | SYSTEMS SHALL BE PROVIDED PER SECTIONS C408.2.4 AND |
| | C408.2.5.4. |
| | 2) SHEET M101: A) PROVIDE FSD SYMBOLS WHERE THE DUCTS |
| | ARE PENETRATING THE RATED SHAFT BY THE TOILET ROOMS. B) |
| | SHOW THE EXACT LOCATIONS OF THE FIRE-RATED ACCESS DOORS |
| | AT BOTH OF THE RATED SHAFTS, PROVIDE INSTALLATION |
| | DETAILS, AND A SUBMITTAL FOR THE DOOR REVIEWED AND |
| | APPROVED BY THE DESIGN PROFESSIONAL OF RECORD. C) |
| | PLEASE PLACE NOTE #7 AT ALL SHAFT DAMPER LOCATIONS: THE |
| | NOTE IS MSSING IN SEVERAL PLACES. |
| | 3) M101, M102, M103, & M104: REFER TO SECTION 306.1 |
| | ACCESS AND SERVICE SPACE: PROVIDE THE DIMENSIONS OF THE |
| | VRV ACCESS PANELS AND PROVIDE SECTION CUTS OF THE |
| | PANELS AND INSTALLATION DETAILS. PLEASE NOTE THAT THE |
| | CLEAR OPENING DIMENSIONS OF THE PANELS SHALL BE LARGE |
| | ENOUGH TO REPLACE THE UNITS WITHOUT REMOVING PERMANENT |
| | CONSTRUCTION. |
| | 4) M300: PROVIDE INSTALLATION AND SUPPORT DETAILS FOR |
| | THE VRV'S AND EXHAUST FANS, AND DUCT HANGING AND |
| | CONNECTION DETAILS IN COMPLIANCE WITH THE CURRENT |
| | SMACNA STANDARDS. |
| | 5) MP100, M300: SITE SPECIFIC WIND LOAD ENGINEERING IS |
| | REQUIRED FOR INSTALLATION OF THE ROOFTOP HP CONDENSERS, |
| | THE ERV, THE EXHAUST AND UPBLAST FANS, AND THE GRAVITY |
| | VENTILATIOR- REFER TO SECTION 301.15 FBC-14 MECHANICAL. |
| | PLEASE NOTE THAT IN ACCORDANCE WITH THIS SECTION, AND |
| | SECTIONS 237433 AND 238126 OF THE PROJECT MANUAL, THE |
| | ERV AND HP CONDENSERS MUST ALSO BE CERTIFIED FOR WIND |
| | RESISTANCE. PROVIDE THE WIND LOAD DESIGN CRITERIA AND |
| | DESIGN PRESSURES ON THE PLAN, AND COMPLETE DETAILS FOR |
| | ATTACHING THE VARIOUS CURBS, STANDS AND SUPPORTS TO THE |
| | STRUCTURE, AND MOUNTING THE APPLIANCES AND EQUIPMENT TO |
| | THE SUPPORTS. ALL SUBMITTALS PERTAINING TO THE |
| | INSTALLATIONS INCLUDING MIAMI-DADE NOA'S, FL, PRODUCT |
| | APPROVALS, MANUFACTURER'S SPECIFICATIONS ETC. SHALL BE |
| | REVIEWED AND APPROVED BY THE DESIGN PROFESSIONAL OF |
| | RECORD. PROVIDE SECTION CUTS ON THE PLAN THAT INDICATE |
| | THE HEIGHTS OF THE AC EQUIPMENT ABOVE THE FINISHED |
| | SURFACES OF THE ROOF- REFER TO TABLE 1522.3 FBC-14 |
| | BUILDING. SEE ALSO SECTION 1522.3.4 FOR ELECTRICAL |
| | CONDUITS AND MECHANICAL PIPING MOUNTED ON ROOF DECKS |
| | AND PROVIDE DETAILS. |
| | 6) PROVIDE A SUBMITTAL PACKAGE REVIEWED AND APPROVED BY |
| | THE DESIGN PROFESSIONAL OF RECORD THAT INCLUDES THE AC |
| | EQUIPMENT, THE FIRE/SMOKE DAMPERS, THE DUCT SMOKE |
| | DETECTORS, THE FANS, THE LOUVERS, THE ACCESS DOORS, THE |
| | MOD'S, REFRIGERANT AND CONDENSATE PIPING INSULATIONS |
| | (INSULATIONS SHALL BE PLENUM-RATED) ETC. PLEASE NOTE |
| | MIAMI-DADE NOA'S AND/OR FL. PRODUCT APPROVALS ARE |
| | REQUIRED FOR ALL EXTERIOR COMPONENTS SUCH AS THE |
| | EXHAUST FANS AND LOUVERS |
| | 7) PROVIDE UL TESTED AND APPROVED FIRESTOPPING SYSTEMS |
| | COPIED ONTO THE PLANS FOR ALL PIPES, DUCTS, CONDUITS |
| | ETC. PENETRATING FIRE-RATED WALLS AND FLOOR/CEILING |
| | ASSEMBLIES. |
| | 8) PLEASE NOTE THAT SEPARATE PERMITS ARE REQUIRED FOR |
| | KITCHEN HOOD AND EXHAUST SYSTEMS. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 561-805-6719 |