| Plan Review Notes For Permit 15090992 |
| Permit Number |
15090992 |
|
| Review Stop |
G |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2015-09-26 04:21:28 | 1) SUBMIT TWO COPIES OF THE FUEL DISPENSER | | | MANUFACTURER'S INSTALLATION INSTRUCTIONS PER NFPA 58, | | | 2011 EDITION, SEC. 6.24.3.1. | | | 2) NFPA 58 SEC. 6.24.3.6 - PIPING AND THE DISPENSING | | | HOSE SHALL BE PROVIDED WITH HYDROSTATIC RELIEF VALVES | | | IN ACCORDANCE WITH SECTION 6.13 OF NFPA 58. | | | 3) NFPA 58-2011 - SEC. 6.24.3.7 - PROTECTION AGAINST | | | TRESPASSING AND TAMPERING SHALL BE IN ACCORDANCE WITH | | | 6.18.4. SHOW ON THE PLAN HOW THE TANKS WILL BE | | | PROTECTED AGAINST UNAUTHORIZED ACCESS. | | | 4) NFPA 58-2011 - SEC. 6.24.3.12 - ALL DISPENSERS | | | EITHER SHALL BE INSTALLED ON A CONCRETE FOUNDATION OR | | | SHALL BE PART OF A COMPLETE STORAGE AND DISPENSING UNIT | | | MOUNTED ON A COMMON BASE AND INSTALLED IN ACCORDANCE | | | WITH 6.6.3.1 (G). SHOW COMPLIANCE WITH TABLE 6.6.3 (A). | | | 5) PLANS SHALL BE DRAWN TO A MINIMUM 1/8 INCH SCALE PER | | | THE WPB AMEND. TO FBC SEC. 107.2.1.4. | | | | | | PLUMBING PLAN REVIEW | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | 561-805-6692 | | | [email protected] | | | | | | | | | | | | | | | | | | | | | |
|