| Plan Review Notes For Permit 15090929 |
| Permit Number |
15090929 |
|
| Review Stop |
M |
| Sequence Number |
3 |
|
| Notes |
| Date |
Text |
| 2016-02-03 07:30:53 | 3RD REVIEW: FBC 2014 MECHANICAL | | | PERMIT #15090929 | | | 2/3/15 | | | | | | 1) AFTER TWO PREVIOUS REVIEW REQUESTS, THE REVISED M100 | | | BOILER FLUE INSTALLATION DETAIL IS STILL NOT SHOWING A | | | TOTAL RUN LENGTH OF THE VENT WHICH IS REQUIRED TO | | | VERIFY CORRECT SIZING DAIMETER OF THE VENT. THE DRAWING | | | IS "NTS" BUT BY APPEARANCES THE 12" DIAMETER VENT MAY | | | BE UNDERSIZED FOR THE TOTAL LENGTH OF THE RUN. REFER TO | | | TABLE 504.2(1) FBC-14 FUEL GAS AND REVISE THE PLAN TO | | | SHOW THE TOTAL RUN LENGTH AND CORRECT VENT SIZING PER | | | THE TABLE. | | | | | | CHRISTOPHER L. COLE | | | MECHANICAL PLANS EXAMINER | | | 561-805-6719 | | | [email protected] | | | |
|