Plan Review Notes
Plan Review Notes For Permit 15090929
Permit Number 15090929
Review Stop P
Sequence Number 2
Notes
Date Text
2015-12-20 07:41:211) WATER ABOVE 140 DEGRESS SHALL NOT BE DISCHARGED INTO
 ANY PART OF A DRAINAGE SYSTEM PER 2014 FBC-PLUMBING
 SEC. 803.1.
 2) SHT. P100 - IDENTIFY AND SIZE THE DRAIN FROM THE
 FEEDWATER TANK TO THE FLOOR SINK. WPB AMEND. TO FBC
 SEC. 107.2.1.
 3) SHT. P-200 - THE MINIMUM AIR GAP REQD. FOR THE
 INDIRECT WASTE PIPES SHALL BE NOT LESS THE TWICE THE
 EFFECTIVE OPENING OF THE INDIRECT WASTE PIPE. 2014 FBC
 PLUMBING SEC.802.2.1.
 4) SHT. P-200 - SHOW THE WATER SUPPLY TO THE AUTOCLAVE
 BLOWDOWN TANK ON THE AUTOCLAVE INSTALLATION DETAIL
 DRAWING.WPB AMEND. TO FBC SEC. 107.2.1.
 5) SHT. P-200 - THE PTR VALVE FOR THE AUTOCLAVE SHALL
 DISCHARGE BY GRAVITY PER 2014 FMC SEC.1006.5.
 6) SUBMIT AN INSTALLATION DETAIL FOR THE AUTOCLAVE
 BLOWDOWN TANK TO THE AUTOCLAVE. WPB AMEND. TO FBC SEC.
 107.2.1.
 7) SHT. P-200 SHOWS THE FLOOR SINKS AS EXISTING BUT
 SHT. 1 DOES NOT. ARE THEY NEW OR EXISTING? CLARIFY.
 8) THE FLOOR DRAINS ARE NOT VENTED. SHOW THE PROPER
 VENTING FOR THE FLOOR FRAINS. FBC-PLUMBING SEC.901.2,
 901.2.1. THE DISTANCE OF THE TRAP TO A VENT SHALL
 COMPLY WITH TABLE 909.1.
 9) TRAP PRIMERS ARE REQD. ON THE FLOOR DRAINS PER
 FBC-PLUMBING SEC.1002.4.
 10) THE 8 1/2 X 11 SHEET FROM BONDTECH IS ILLEGIBLE.
 SUBMIT A CLEAR AND LEGIBLE SHEET FOR REVIEW. WPB AMEND.
 TO FBC SEC.107.2.1.
 11) THE BOILER SHALL BE LISTED IN ACCORDANCE WITH THE
 2014 FL. MECHANICAL CODE SEC.1004.1.
 12) SUBMIT COMPLETE SPCIFICATIONS FOR THE FEEDWATER
 TANK AND THE BOILER. WPB AMEND. TO FBC SEC.107.2.1.
 130 INDICATE ON THE PLAN THE TYPE OF PIPING TO BE USED
 FOR THE STEAM SYSTEM. WPB AMEND. TO FBC SEC.107.2.1.
  
 PLUMBING PLAN REVIEW
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 561-805-6692
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved