| 2015-12-20 09:01:42 | 1) INDICATE ON THE PLAN THE VENTING CATEGORY OF THE |
| | BOILER IN ACCORDANCE WITH THE 2014 FBC-FUEL GAS SEC. |
| | 202 (DEFINITIONS - VENTED APPLIANCE CATEGORIES). |
| | 2) SHOW THE SIZE OF THE GAS VENT FOR THE BOILER. THE |
| | VENT SIZE SHALL COMPLY WITH SEC. 503.6.9 & TABLE |
| | 504.2(2) IF THIS IS A CATEGORY I VENTED APPLIANCE. IF |
| | NOT A CATEGORY I APPLIANCE, SUBMIT MANUF. SPECS FOR THE |
| | REQUIRED VENT SIZING. |
| | 3) SHT.P-200 - INDICATE THE TYPE OF MATERIAL, LOCATION |
| | AND DISTANCE ABOVE THE ROOF OF THE VENTS FOR THE |
| | BLOWDOWN TANKS FOR THE BOILER, FEEDWATER TANK AND THE |
| | AUTOCLAVE.SUBMIT MANUFACTURER'S SPECS FOR THE VENT |
| | INSTALLATION FOR THIS EQUIPMENT. WPB AMEND. TO FBC SEC. |
| | 107.2.1. |
| | 4) A TYPE B GAS VENT SHALL TERMINATE AT LEAST 5 FEET IN |
| | VERTICAL HEIGHT ABOVE THE APPLIANCE DRAFT HOOD OR FLUE |
| | COLLAR PER 2014 FGC SEC.503.6.5. SHOW ON THE THE PLANS. |
| | SHOW THE TOTAL HEIGHT OF THE GAS VENT. |
| | 5) INDICATE ON THE PLAN IF THE BOILER IS A NATURAL |
| | DRAFT OR FAN ASSISTED VENT APPLIANCE. THIS WILL |
| | DETERMINE VENT SIZE IF A CATEGORY I VENTED APPLIANCE |
| | PER TABLE 504.2 (2). |
| | 6) SUBMIT DETAILS FOR SUPPORT OF THE GAS VENT. 2014 FGC |
| | SEC.503.6.1. |
| | 7) SHOW THE SIZE OF THE LP TANKS ON THE PLAN.WPB AMEND. |
| | TO FBC SEC. 107.2.1. |
| | 8) SUBMIT ANCHORING DETAILS FOR THE LP TANKS.ANCHORING |
| | SHALL BE DDESIGNED AND INSTALLED TO RESIST THE WIND |
| | PRESSURES IN ACCORDANCE WITH THE FLORIDA BUILDING CODE, |
| | BUILDING SEC.1609. |
| | 9) SHT. P-100 - THE SIZE OF THE PIPING FROM THE LP |
| | TANKS IS SHOWN AS 3/4 INCH BUT THE BOILER SYSTEM DETAIL |
| | SHOWS 1 1/4 INCHES. CLARIFY. |
| | 10) SUBMIT DETAILS FOR THE SEALING OF THE GAS PIPE |
| | PENETRATION THROUGH THE EXTERIOR WALL. WPB AMEND. TO |
| | FBC SEC. 107.2.1. |
| | 11) SHOW THE LOCATION OF THE STEP DOWN GAS REGULATOR ON |
| | THE GAS DRAWING.WPB AMEND. TO FBC SEC. 107.2.1. |
| | 12) SHOW THE DISTANCE FROM THE STEP DOWN REGULATOR TO |
| | THE MOST REMOTE OUTLET ON THE SYSTEM.WPB AMEND. TO FBC |
| | SEC. 107.2.1. |
| | 13) SHOW THE PIPE SIZE FROM THE STEP DOWN REGULATOR TO |
| | THE EQUIPMENT.WPB AMEND. TO FBC SEC. 107.2.1. |
| | 14) SHOW THE SIZE OF THE GAS PIPING FROM THE LP |
| | TANKS.WPB AMEND. TO FBC SEC. 107.2.1. |
| | |
| | PLUMBING PLAN REVIEW |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | 561-805-6692 |
| | [email protected] |
| | |
| | |
| | |