| 2015-09-30 16:41:07 | 1ST REVIEW: FBC 2014 MECHANICAL |
| | PERMIT #15090855 |
| | 9/30/15 |
| | |
| | 1) PROVIDE AC COOLING AND HEATING CALCULATIONS FOR THE |
| | NEW RTU'S IN COMPLIANCE WITH SECTION C403.2.1 FBC-14 |
| | ENERGY CONSERVATION. |
| | 2) PROVIDE ENERGY CALCULATIONS FOR THE PROPOSED NEW |
| | RESTAURANT IN ACCORDANCE WITH C101.4.3 FBC-14 ENERGY |
| | CONSERVATION. |
| | 3) SHEET M101: THE PLAN SHOWS DUCT SMOKE DETECTORS IN |
| | THE SUPPLY DUCTS OF THE RTU'S, HOWEVER THE DEVICES ARE |
| | REQUIRED TO BE INSTALLED IN THE RETURN AIR SYSTEMS- SEE |
| | SECTION 606.2.1 FBC-14 MECHANICAL. |
| | 4) M103: SITE SPECIFIC WIND LOAD TIE DOWN ENGINEERING |
| | IS REQUIRED FOR INSTALLATION OF THE RTU'S, CONDENSERS, |
| | AND ROOF FANS- SEE SECTION 301.15 FBC-14 MECHANICAL. |
| | THE ENGINEER OF RECORD MUST PROVIDE WIND LOAD DESIGN |
| | CRITERA, DESIGN PRESSURES, AND COMPLETE DETAILS FOR TIE |
| | DOWN OF THE APPLIANCES. PLEASE NOTE THAT STRUTURAL |
| | DETAILS FOR THE ROOF OPENINGS SHALL ALSO BE PROVIDED. |
| | 5) PLACE A NOTE ON THE PLANS INDICATING SEPARATE |
| | PERMITS ARE REQUIRED FOR THE KITCHEN HOOD & EXHAUST |
| | SYSTEM, DISHWASHER HOOD AND EXHAUST SYSTEM, AND THE |
| | WALK-IN COOLERS AND FREEZERS. |
| | 6) THE PLANS DON'T INDICATE HOW SERVICE ACCESS IS BEING |
| | PROVIDED FOR THE ROOFTOP MECHANICAL EQUIPMENT: REFER TO |
| | SECTION 306.5 FBC-14 MECHANICAL AND SHOW COMPLIANCE. |
| | 7) PROVIDE A CONDENSATE DISPOSAL PLAN FOR THE AC |
| | EQUIPMENT INCLUDING THE THE TYPE AND SIZE OF PIPING, |
| | PIPING RUNS, PIPING DISCHARGE LOCATIONS, AND PIPI NG |
| | SUPPORT AND PROTECTION- SEESECTION 307 FBC-14 |
| | MECHANICAL. |
| | |