2015-09-30 16:41:07 | 1ST REVIEW: FBC 2014 MECHANICAL |
| PERMIT #15090855 |
| 9/30/15 |
| |
| 1) PROVIDE AC COOLING AND HEATING CALCULATIONS FOR THE |
| NEW RTU'S IN COMPLIANCE WITH SECTION C403.2.1 FBC-14 |
| ENERGY CONSERVATION. |
| 2) PROVIDE ENERGY CALCULATIONS FOR THE PROPOSED NEW |
| RESTAURANT IN ACCORDANCE WITH C101.4.3 FBC-14 ENERGY |
| CONSERVATION. |
| 3) SHEET M101: THE PLAN SHOWS DUCT SMOKE DETECTORS IN |
| THE SUPPLY DUCTS OF THE RTU'S, HOWEVER THE DEVICES ARE |
| REQUIRED TO BE INSTALLED IN THE RETURN AIR SYSTEMS- SEE |
| SECTION 606.2.1 FBC-14 MECHANICAL. |
| 4) M103: SITE SPECIFIC WIND LOAD TIE DOWN ENGINEERING |
| IS REQUIRED FOR INSTALLATION OF THE RTU'S, CONDENSERS, |
| AND ROOF FANS- SEE SECTION 301.15 FBC-14 MECHANICAL. |
| THE ENGINEER OF RECORD MUST PROVIDE WIND LOAD DESIGN |
| CRITERA, DESIGN PRESSURES, AND COMPLETE DETAILS FOR TIE |
| DOWN OF THE APPLIANCES. PLEASE NOTE THAT STRUTURAL |
| DETAILS FOR THE ROOF OPENINGS SHALL ALSO BE PROVIDED. |
| 5) PLACE A NOTE ON THE PLANS INDICATING SEPARATE |
| PERMITS ARE REQUIRED FOR THE KITCHEN HOOD & EXHAUST |
| SYSTEM, DISHWASHER HOOD AND EXHAUST SYSTEM, AND THE |
| WALK-IN COOLERS AND FREEZERS. |
| 6) THE PLANS DON'T INDICATE HOW SERVICE ACCESS IS BEING |
| PROVIDED FOR THE ROOFTOP MECHANICAL EQUIPMENT: REFER TO |
| SECTION 306.5 FBC-14 MECHANICAL AND SHOW COMPLIANCE. |
| 7) PROVIDE A CONDENSATE DISPOSAL PLAN FOR THE AC |
| EQUIPMENT INCLUDING THE THE TYPE AND SIZE OF PIPING, |
| PIPING RUNS, PIPING DISCHARGE LOCATIONS, AND PIPI NG |
| SUPPORT AND PROTECTION- SEESECTION 307 FBC-14 |
| MECHANICAL. |
| |
| CHRISTOPHER L. COLE |
| MECHANICAL PLANS EXAMINER |
| 561-805-6719 |
| [email protected] |
| |