| 2015-09-18 08:48:07 | 1) SUBMIT MANUFACTURER'S SPECIFICATIONS/INSTALL MANUAL |
| | FOR THE ZURN GREASE INTERCEPTOR FOR REVIEW. WPB AMEND. |
| | TO FBC SEC.107.2.1, 107.3.5.1.3. |
| | 2) SUBMIT INTERCEPTOR SIZING CALCULATIONS. THE |
| | INTERCEPTOR SHALL BE SIZED IN ACCORDANCE WITH ONE OF |
| | THE METHODS LISTED IN THE 2010 FBC SEC.1003.3.4. |
| | 3) SUBMIT A REVISED KITCHEN EQUIPMENT SCHEDULE. THE |
| | PLANS SHOW A NEW GRIDDLE AND FRYER BUT NO INFORMATION |
| | HAS BEEN SUBMITTED FOR THESE APPLIANCES. |
| | 4) INDICATE ON THE PLANS IF THE GRIDDLE AND FRYER ARE |
| | GAS OR ELECTRIC. IF THE APPLIANCES ARE GAS, THEN SUBMIT |
| | MANUF. SPECS FOR THE EQUIPMENT AND SUBMIT A COMPLETE |
| | GAS DRAWING FOR REVIEW. IF THE APPLIANCES ARE ELECTRIC, |
| | SUBMIT COMPLETE ELECTRIC PLANS FOR REVIEW.WPB AMEND. TO |
| | FBC SEC. 107.2.1. |
| | 5) THE PLANS FOR THIS PLUMBING REVISION SHOW CHANGES |
| | FRROM THE ORIGINAL PLANS THAT APPEAR TO AFFECT |
| | STRUCTURAL, MECHANICAL AND ELECTRICAL DISCIPLINES. |
| | SUBMIT A COMPLETE SET OF PLANS THAT REFLECTS THE ENTIRE |
| | SCOPE OF CHANGES THAT HAVE BEEN MADE FROM THE ORIGINAL |
| | PLANS. WPB AMEND. TO FBC SEC. 107.2.1. |
| | 6) SHT.P-4 - SHOWS THE DRAINS FROM ICE BINS DISCHARGING |
| | INTO THE GREASE INTERCEPTOR.WASTES THAT DO NOT REQUIRE |
| | TREATMENT OR SEPARATION SHALL NOT BE DISCHARGED INTO |
| | ANY INTERCEPTOR OR SEPARATOR PER 2010 FBC-PLUMBING |
| | SEC.1003.2. |
| | 7)THE GREASE INTERCEPTOR SHALL HAVE THE GREASE |
| | RETENTION CAPACITY INDICATED IN TABLE 1003.3.4.1 OF |
| | FBC-PLUMBING FOR THE FLOW THROUGH RATES INDICATED. |
| | 8) GREASE INTTERCEPTORS SHALL BE EQUIPPED WITH DEVICES |
| | TO CONTROL THE RATE OF WATER FLOW SO THAT THE WATER |
| | FLOW DOES NOT EXCEED THE RATED FLOW PER FBC-PLUMBING |
| | SEC.1003.3.4.2. |
| | 9) INDICATE THE TYPE OF COOKING OPERATIONS THAT WILL BE |
| | DONE IN THE STRUCTURE.WPB AMEND. TO FBC SEC. 107.2.1. |
| | 10) SUBMIT A WATER RISER FOR REVIEW. WPB AMEND. TO FBC |
| | SEC. 107.3.5.1.3. |
| | |
| | WHEN A COMPLETE SET OF PLANS ARE SUBMITTED THAT SHOW |
| | ALL THE CHANGES TO THE BUILDING, ELECTRICAL, MECHANICAL |
| | AND PLUMBING SYSTEMS THOSE PLANS WILL BE REVIEWED BY |
| | EACH DISCIPLINE. THE PLANS MUST BE SUBMITTED AS A |
| | COMPLETE PACKAGE. |
| | |
| | PLUMBING PLAN REVIEW |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | 561-805-6692 |
| | [email protected] |
| | |
| | |