| 2016-01-27 12:36:41 | 1) SHT. A-1.0 SHOWS A DECK DRAIN BY THE POOL. IS THE |
| | DRAIN AND PIPING BEING INSTALLED UNDER THE PLUMBING FOR |
| | THE BUILDING? IF SO, SHOW THE PIPING ON THE CIVIL |
| | DRAWINGS, THE SIZE AND THE SQUARE FOOTAGE DRAINED BY |
| | THE DRAIN. CLARIFY. WPB AMEND. TO FBC SEC. 107.2.1. |
| | 2) SUBMIT A SCUPPER DETAIL. THE LOCATION OF THE SCUPPER |
| | SHALL COMPLY WITH 2014 FBCR SEC.R903.4.1.SUBMIT |
| | CALCULATIONS FOR THE SIZE OF THE OVERFLOW SCUPPER. |
| | SCUPPER SHALL BE SIZED IN ACCORDANCE WITH 2014 |
| | FBC-PLUMBING. |
| | 4) SHT.A-3.1 REFERS TO A-6.0 FOR A SECTION DETAIL. THIS |
| | SHEET IS NOT IN THE PLANS. DOES THIS SHEET SHOW THE |
| | SCUPPER DETAIL? CLARIFY. |
| | 5) SHT. A-5.3-DETAIL #1 CALLS OUT AN ENLARGED KITCHEN |
| | PLAN BUT A BATHROOM IS SHOW. PLEASE REVISE. |
| | 6) SHT. P-102 SHOWS A MAIN WATER METER. WHAT WILL THIS |
| | METER SERVICE? CLARIFY. WPB AMEND. TO FBC SEC. 107.2.1. |
| | 7) SHT. P301 - SIZE THE VENTS ON THE SANITARY RISER. IF |
| | THE VENTS ARE TYPICAL, SIZE THE VENT AND NOTE THAT THE |
| | OTHER VENTS ARE TYPICAL SIZE. THE VENT SYSTEM SHALL BE |
| | SIZED IN ACCORDANCE WITH 2014 FBCR- SEC.P3113.1. |
| | 8) THE RESPONSE FROM THE ENGINEERING FIRM FOR THE GAS |
| | COMMENT REGARDING COMBUSTION AIR REFERS TO SHT. M301. |
| | THERE IS NO SUCH DRAWING IN THIS SET OF PLANS. CLARIFY. |
| | 9) SHT. M401 - WATER HEATER COMBUSTION AIR CALCULATIONS |
| | SHOWS THE TANKLESS WATER HEATER AS 35,000 BTU'S AND THE |
| | GAS RISER SHOWS THE BTU LOAD AS 199,000 BTU'S. THIS IS |
| | OBVIOUSLY A MISPRINT. REVISE. |
| | 10) SHT. P101-WATER HEATER DETAIL REFERS TO A HOT WATER |
| | RECIRCULATING LINE (?) BUT THIS IS NOT SHOWN ON THE |
| | WATER PIPING PLAN VIEW. CLARIFY. |
| | 11) THE PLUMBING PLANS SHALL BEAR THE WET SIGNATURE OF |
| | THE ENGINEER OF RECORD PER THE F.A.C. RULE |
| | 61G15-23.001, .002, & .003. |
| | |
| | |
| | PLUMBING PLAN REVIEW |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | 561-805-6692 |
| | [email protected] |
| | |