| 2015-09-15 12:01:16 | 1ST REVIEW: FBC 2014 MECHANICAL |
| | PERMIT #15090205 |
| | 9/15/15 |
| | |
| | 1) NEW RTU'S ARE SPECIFIED ON THE PLANS- PLEASE REFER |
| | TO SECTION C403.2.1 FBC-14 ENERGY CONSERVATION AND |
| | PROVIDE COOLING AND HEATING LOAD CALCULATIONS: |
| | CALCULATION OF HEATING AND COOLING LOADS. |
| | DESIGN LOADS SHALL BE DETERMINED IN ACCORDANCE WITH THE |
| | PROCEDURES DESCRIBED IN THE ASHRAE/ACCA STANDARD 183 OR |
| | ACCA MANUAL N AND SHALL BE ATTACHED TO THE CODE |
| | COMPLIANCE FORM SUBMITTED TO THE BUILDING DEPARTMENT |
| | WHEN THE BUILDING IS PERMITTED OR, IN THE EVENT THE |
| | MECHANICAL PERMIT IS OBTAINED AT A LATER TIME, THE |
| | SIZING CALCULATION SHALL BE SUBMITTED WITH THE |
| | APPLICATION FOR THE MECHANICAL PERMIT. HEATING AND |
| | COOLING LOADS SHALL BE ADJUSTED TO ACCOUNT FOR LOAD |
| | REDUCTIONS THAT ARE ACHIEVED WHEN ENERGY RECOVERY |
| | SYSTEMS ARE UTILIZED IN THE HVAC SYSTEM IN ACCORDANCE |
| | WITH THE ASHRAEHVAC SYSTEMS AND EQUIPMENT HANDBOOK. |
| | ALTERNATIVELY, DESIGN LOADS SHALL BE DETERMINED BY AN |
| | APPROVED EQUIVALENT COMPUTATION PROCEDURE, USING THE |
| | DESIGN PARAMETERS SPECIFIED IN CHAPTER 3. |
| | 2) THE SUBMITTED ENERGY COMPLIANCE FORM 504-2014 DOES |
| | NOT LIST ANY DATA FOR THE NEW AC SYSTEMS. PLEASE ADD |
| | THE REQUIRED DATA AND COMPLETE THE MANDATORY |
| | REQUIREMENTS CHECKLIST- PLACE A CHECK IN THE YES, N/A, |
| | OR EX BOX ON EACH LINE. |
| | 3) SHEET M1.0: DUCT SMOKE DETECTORS SHALL BE INSTALLED |
| | IN THE RETURN AIR SYSTEMS OF THE NEW RTU'S- SEE SECTION |
| | 606.2.1 FBC-14 MECHANCIAL. |
| | 3A) M1.2 DUCT DETECTOR DETAIL: PLACE A NOTE INDICATING |
| | ALL RTU'S ARE TO BE SHUT DOWN UPON ANY DUCT DETECTOR |
| | GOING INTO ALARM. |
| | 4) M1.1: REVIEW AND REVISE THE VENTILATION SCHEDULE TO |
| | INDICATE COMPLIANCE WITH TABLE 403.3 FBC-14 MECHANICAL. |
| | PLEASE REMOVE THE NOTES SPECIFYING THE IMC. |
| | 5) M1.0 & M1.1: PROVIDE A DUCT LAYOUT PLAN ON SHEET |
| | M1.0 IN ACCORDANCE WITH THE SCHEDULES SHOWN ON SHEET |
| | M1.1. |
| | 6) A2.0, S5.1, & M1.2: REFER TO SECTION 301.15 FBC-14 |
| | MECHANICAL AND PROVIDE WIND LOAD TIE DOWN ENGINEERING |
| | FOR THE ROOFTOP EQUIPMENT AND COMPONENTS. INDICATE ON |
| | THE PLANS THE WIND LOAD DESIGN CRITERIA, DESIGN |
| | PRESSURES, AND DETAILS FOR ATTACHMENT OF THE RTU AND |
| | FAN CURBS TO THE ROOF STRUCTURE, AND RTU'S AND FANS TO |
| | THE CURBS. |
| | 7) S5.1: PROVIDE STRUCTURAL DETAILS FOR COVERING THE |
| | ROOF OPENINGS OF THE REMOVED RTU'S (WHERE APPLICABLE). |
| | 8) PROVIDE A CONDENSATE DISPOSAL PLAN- INDICATE THE |
| | TYPE AND SIZE OF RTU CONDENSATE PIPES, SHOW THE PIPE |
| | RUNS, SHOW HOW THE PIPE WILL BE SUPPORTED AND PROTECTED |
| | FROM UV DEGRADATION, AND INDICATE THE DISCHARGE |
| | LOCATIONS- REFER TO SECTION 307 FBC-14 MECHANICAL. |
| | 9) M1.1: IN REGARD TO THE NEW AC SYSTEMS AND |
| | ECONOMIZERS PLEASE SHOW COMPLIANCE WITH THE FOLLOWING |
| | SECTIONS OF THE FBC-14 ENERGY CONSERVATION: |
| | A) C403.2.5.1 DEMAND CONTROLLED VENTILATION. |
| | DEMAND CONTROL VENTILATION (DCV) SHALL BE PROVIDED FOR |
| | SPACES LARGER THAN 500 SQUARE FEET (50 M2) AND WITH AN |
| | AVERAGE OCCUPANT LOAD OF 25 PEOPLE PER 1000 SQUARE FEET |
| | (93 M2) OF FLOOR AREA (AS ESTABLISHED IN TABLE 403.3 OF |
| | THE FLORIDA BUILDING CODE, MECHANICAL) AND SERVED BY |
| | SYSTEMS WITH ONE OR MORE OF THE FOLLOWING: |
| | 1. AN AIR-SIDE ECONOMIZER; |
| | 2. AUTOMATIC MODULATING CONTROL OF THE OUTDOOR AIR |
| | DAMPER; OR |
| | 3. A DESIGN OUTDOOR AIRFLOW GREATER THAN 3,000 CFM |
| | (1400 L/S). |
| | EXCEPTION: DEMAND CONTROL VENTILATION IS NOT REQUIRED |
| | FOR SYSTEMS AND SPACES AS FOLLOWS: |
| | 1. SYSTEMS WITH ENERGY RECOVERY COMPLYING WITH SECTION |
| | C403.2.6. |
| | 2. MULTIPLE-ZONE SYSTEMS WITHOUT DIRECT DIGITAL CONTROL |
| | OF INDIVIDUAL ZONES COMMUNICATING WITH A CENTRAL |
| | CONTROL PANEL. |
| | 3. SYSTEM WITH A DESIGN OUTDOOR AIRFLOW LESS THAN 1,200 |
| | CFM (600 L/S). |
| | 4. SPACES WHERE THE SUPPLY AIRFLOW RATE MINUS ANY |
| | MAKEUP OR OUTGOING TRANSFER AIR REQUIREMENT IS LESS |
| | THAN 1,200 CFM (600 L/S). |
| | 5. VENTILATION PROVIDED FOR PROCESS LOADS ONLY. |
| | B) C403.3.1.1 AIR ECONOMIZERS. |
| | AIR ECONOMIZERS SHALL COMPLY WITH SECTIONS C403.3.1.1.1 |
| | THROUGH C403.3.1.1.4. |
| | C403.3.1.1.1 DESIGN CAPACITY. |
| | AIR ECONOMIZER SYSTEMS SHALL BE CAPABLE OF MODULATING |
| | OUTDOOR AIR AND RETURN AIR DAMPERS TO PROVIDE UP TO 100 |
| | PERCENT OF THE DESIGN SUPPLY AIR QUANTITY AS OUTDOOR |
| | AIR FOR COOLING. |
| | C403.3.1.1.2 CONTROL SIGNAL. |
| | ECONOMIZER DAMPERS SHALL BE CAPABLE OF BEING SEQUENCED |
| | WITH THE MECHANICAL COOLING EQUIPMENT AND SHALL NOT BE |
| | CONTROLLED BY ONLY MIXED AIR TEMPERATURE. |
| | EXCEPTION: THE USE OF MIXED AIR TEMPERATURE LIMIT |
| | CONTROL SHALL BE PERMITTED FOR SYSTEMS CONTROLLED FROM |
| | SPACE TEMPERATURE (SUCH AS SINGLE-ZONE SYSTEMS). |
| | C403.3.1.1.3 HIGH-LIMIT SHUTOFF. |
| | AIR ECONOMIZERS SHALL BE CAPABLE OF AUTOMATICALLY |
| | REDUCING OUTDOOR AIR INTAKE TO THE DESIGN MINIMUM |
| | OUTDOOR AIR QUANTITY WHEN OUTDOOR AIR INTAKE WILL NO |
| | LONGER REDUCE COOLING ENERGY USAGE. HIGH-LIMIT SHUTOFF |
| | CONTROL TYPES FOR SPECIFIC CLIMATES SHALL BE CHOSEN |
| | FROM TABLE C403.3.1.1.3(1). HIGH-LIMIT SHUTOFF CONTROL |
| | SETTINGS FOR THESE CONTROL TYPES SHALL BE THOSE |
| | SPECIFIED IN TABLE C403.3.1.1.3(2). |
| | TABLE C403.3.1.1.3(1) HIGH-LIMIT SHUTOFF CONTROL |
| | OPTIONS FOR AIR ECONOMIZERS- NOTE: PER THIS TABLE IN A |
| | 1A CLIMATE ZONE THE ALLOWABLE CONTROL TYPES ARE FIXED |
| | DRY BULB, DIFFERENTIAL DRY BULB, ELECTRONIC ENTHALPYA, |
| | DIFFERENTIAL ENTHALPY, DEW-POINT AND DRY-BULB |
| | TEMPERATURES. PLEASE INDICATE WHICH TYPE THE LENNOX |
| | UNITS ARE INCORPORATING. |
| | 10) THE $90,000.00 PROJECT COST LISTED ON THE PERMIT |
| | APPLICATION IS UNDERVALUED FOR THE SCOPE OF THE WORK |
| | SHOWN ON THE PLANS. REFER TO 109.3 WPB AMENDMENTS TO |
| | THE FBC-14 AND ADJUST THE PERMIT VALUE ACCORDINGLY. |
| | 109.3 BUILDING PERMIT VALUATIONS. IF, IN THE OPINION OF |
| | THE BUILDING OFFICIAL, THE CLAIMED VALUATION OF |
| | BUILDING, ALTERATION, STRUCTURE, ELECTRICAL, GAS, |
| | MECHANICAL OR PLUMBING SYSTEMS APPEARS TO BE |
| | UNDERESTIMATED ON THE APPLICATION, THE PERMIT SHALL BE |
| | DENIED, UNLESS THE APPLICANT CAN SHOW |
| | DETAILED, QUANTITY ESTIMATES, AND/OR BONA FIDE SIGNED |
| | CONTRACTS (EXCLUDING LAND VALUE) TO MEET THE |
| | APPROVAL OF THE BUILDING OFFICIAL. FOR PERMITTING |
| | PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS SHALL |
| | BE TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL, |
| | ELECTRIC, PLUMBING, MECHANICAL, INTERIOR FINISH, |
| | RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN FEES, |
| | MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING |
| | ONLY LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE |
| | LATEST PUBLISHED DATA OF NATIONAL CONSTRUCTION |
| | COST ANALYSIS SERVICES (MARSHALL-SWIFT, MEANS, ETC.), |
| | AS PUBLISHED BY INTERNATIONAL CODE CONGRESS. |
| | FINAL BUILDING PERMIT VALUATION SHALL BE SET BY THE |
| | BUILDING OFFICIAL. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 561-805-6719 |
| | [email protected] |
| | |